By Anil Kumar CD/CSS/DSG June 06, 2005

Slides:



Advertisements
Similar presentations
2 Copyright © 2005, Oracle. All rights reserved. Installing the Oracle Database Software.
Advertisements

INTRODUCTION TO ORACLE Lynnwood Brown System Managers LLC Backup and Recovery Copyright System Managers LLC 2008 all rights reserved.
F Fermilab Database Experience in Run II Fermilab Run II Database Requirements Online databases are maintained at each experiment and are critical for.
9 Copyright © Oracle Corporation, All rights reserved. Oracle Recovery Manager Overview and Configuration.
Agenda  Overview  Configuring the database for basic Backup and Recovery  Backing up your database  Restore and Recovery Operations  Managing your.
CERN IT Department CH-1211 Geneva 23 Switzerland t CERN IT Department CH-1211 Geneva 23 Switzerland t
Director Product Management
Introduction to Oracle Backup and Recovery
Using RMAN to Perform Recovery
Backup & Recovery Concepts for Oracle Database
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
Castor F2F Meeting Barbara Martelli Castor Database CNAF.
Selling the Database Edition for Oracle on HP-UX November 2000.
13 Copyright © Oracle Corporation, All rights reserved. RMAN Complete Recovery.
PPOUG, 05-OCT-01 Agenda RMAN Architecture Why Use RMAN? Implementation Decisions RMAN Oracle9i New Features.
Online Databases Status Oracle 8i Servers, release Platform: Compaq Tru64 UNIX V5.1 (Rev. 732) Production DB d0onprd, on d0olc, 64 users, 34Gb.
Best Implementation Practices for Discoverer April Sims OCP 8i 9i.
D0 DB Taking Stock ‘10 1 By Anil Garg – Database Services June 17, 2010.
Fermilab Oct 17, 2005Database Services at LCG Tier sites - FNAL1 FNAL Site Update By Anil Kumar & Julie Trumbo CD/CSS/DSG FNAL LCG Database.
Online Database Support Experiences Diana Bonham, Dennis Box, Anil Kumar, Julie Trumbo, Nelly Stanfield.
D0 Taking Stock1 By Anil Kumar CD/CSS/DSG July 10, 2006.
11 Copyright © Oracle Corporation, All rights reserved. RMAN Backups.
11 Copyright © Oracle Corporation, All rights reserved. RMAN Backups.
15 Copyright © 2005, Oracle. All rights reserved. Performing Database Backups.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
Backup & Recovery Backup and Recovery Strategies on Windows Server 2003.
CDF Taking Stock ‘08 1 By Anil Kumar CD/LSCS/DBI/DBA July 16, 2008.
15 Copyright © 2007, Oracle. All rights reserved. Performing Database Backups.
A Guide to Oracle9i1 Database Instance startup and shutdown.
06/22/2005CDF Taking Stock CDF Taking Stock By Anil Kumar CD/CSS/DSG June 22, 2005.
CD FY10 Budget and Tactical Plan Review FY10 Tactical Plans for Database Services Nelly Stanfield October 7, 2009 Database Services3425-v1.
CERN - IT Department CH-1211 Genève 23 Switzerland t Oracle Real Application Clusters (RAC) Techniques for implementing & running robust.
Hosted SharePoint. Part 3/3: Office Live as a WSS solution Speaker Name Microsoft Corporation Hosted.
CDF DB Taking Stock ‘10 1 By Anil Garg – Database Services Aug 18, 2010.
CERN Database Services for the LHC Computing Grid Maria Girone, CERN.
1 D0 Taking Stock By Anil Kumar CD/LSCS/DBI/DBA June 11, 2007.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
D0 Taking Stock1 By Anil Kumar CD/CSS/DSG June 06, 2005.
Overview of Oracle Backup and Recovery Darl Kuhn, Regis University.
ORACLE & VLDB Nilo Segura IT/DB - CERN. VLDB The real world is in the Tb range (British Telecom - 80Tb using Sun+Oracle) Data consolidated from different.
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
19 Copyright © 2004, Oracle. All rights reserved. Database Backups.
Office of Administration Enterprise Server Farm Managed Services August 2004 Briefing.
I NTRODUCTION OF W EEK 2  Assignment Discussion  Due this week:  1-1 (Exam Proctor): everyone including in TLC  1-2 (SQL Review): review SQL  Review.
March, Database Projects J.Trumbo CSS-DSG May,
Configuring SQL Server for a successful SharePoint Server Deployment Haaron Gonzalez Solution Architect & Consultant Microsoft MVP SharePoint Server
ETL Validator Deployment Options
Database recovery contd…
Monitoring Storage Systems for Oracle Enterprise Manager 12c
Backup & Recovery of Physics Databases
Building a Virtual Infrastructure
Database Services at CERN Status Update
Database Services at Fermilab
NGS Oracle Service.
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Monitoring Storage Systems for Oracle Enterprise Manager 12c
Oracle Database Monitoring and beyond
Introduction of Week 3 Assignment Discussion
Upgrading to Microsoft SQL Server 2014
11/17/ :39 AM © Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN.
SpiraTest/Plan/Team Deployment Considerations
How to Thrive as a DBA in an Oracle10g World
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Dana Kaufman SQL Server Appliance Engineering
TrueSight Capacity December 13, 2018 Architecture Review Mike West.
Backup Monitoring – EMC NetWorker
Backup Monitoring – EMC NetWorker
PerformanceBridge Application Suite and Practice 2.0 IT Specifications
Database Backup and Recovery
Presentation transcript:

By Anil Kumar CD/CSS/DSG June 06, 2005 D0 Taking Stock By Anil Kumar CD/CSS/DSG June 06, 2005 D0 Taking Stock

Production/Integration Infrastructure 6/17/2018 Production/Integration Infrastructure 8 900MHz CPU 16Gb RAM The machine has a Clariion 4500 hardware raid array with 80 drives. Oracle Server 9.2.0.6 (64 bit) on Solaris 2.9 64 bit. Load Avg 2 –3 CPU usage < 50% , Memory Free : 61% Average Db Response time/execute ~ 0.01-0.05 secs Uptime excluding schedule down times. 99.85269% Uptime (based on 420 min of total db unavailability) since Nov 15, 2004 System Performance : http://d0om.fnal.gov/d0admin/sysperf/ Db Performance Charts : https://mistest12.fnal.gov/cp/ Average Response time per execute is 0.01 secs to 0.07 secs D0 Taking Stock

D0 offline development Infrastructure 8 400 MHz, 4GB of RAM OS and Oracle Version same as of int/prd. 64bit OS and 64 bit Oracle 9.2.0.6 Load Avg 1-2 , CPU usage 10-15%, Mem Free 7.8% System Performance URL http://d0om.fnal.gov/d0admin/sysperf/ D0 Taking Stock

D0 Calib Servers Deployment Infrastructure 6/17/2018 D0 Calib Servers Deployment Infrastructure Linux PC for Analysis Farm Linux PC for Reconstructed Farm Notes : Sun Solaris Linux PC Linux PC Failover Failover Note : There was 1 failure for User Servers and Farm Servers since Nov 15, 2005 D0 Taking Stock

6/17/2018 Space Usage D0 Taking Stock

800Gb is available for use for int and production. d0ofdev1 82 GB Used 6/17/2018 Space Usage Summary D0ofprd1 786 GB used. d0ofint1 77GB used. 800Gb is available for use for int and production. d0ofdev1 82 GB Used 190GB is available for use. Db Space Growth doesn’t include space for redos, undos and temp areas. Oct 02 150Gb Oct 03 355Gb Oct 04 515Gb Nov 04 643Gb June 05 832Gb 250Gb/year D0 Taking Stock

Next three years expected Growth 825Gb. Capacity Planning Next three years expected Growth 825Gb. SAM growth 250Gb/year and other apps 25Gb/year. This exclude Luminosity DB We have around 800Gb available. Should start planning to upgrade Disk Capacity Next Year. Luminosity growth is 125Gb/year. Sun v40z machine with a Sun StorEdge 3310 scsi disk array w/ 1.752 tb & 2 Ultra160 raid controllers. URL for Capacity Planning : http://www-css.fnal.gov/dsg/internal/d0_ofl_dbs/D0_database_servers(sun)/d0ora_index_page/d0ora2_d0ofprd/d0ora2_disk_planning.htm D0 Taking Stock

Upgraded D0 offline databases to 9.2.0.6 Accomplishments Upgraded D0 offline databases to 9.2.0.6 Quarterly Database Security Up-to-date Tested Complete Database Recovery of d0ofprd1 database. It took 4 hours. This assumes hardware is already configured and Backup files are available on disk. Moving  d0 offline to a standardized backup recovery method using a san and enstore.  Parallel testing of san as backup media for development and production instances going well. Luminosity db deployed 9i and 10g versions on loaner CDF machine D0 Taking Stock

Monitoring And Data Modeling Tools 6/17/2018 Monitoring And Data Modeling Tools Monitoring Tools : dbatool/toolman To monitor the space usage, users, SQL, tempspace, sniping of inactive sessions, auto start of Listener, IA, estimate table/Index stats OEM (Oracle Enterprise Manager) - DB Monitoring tool/ Monthly charts posted on web Db Performance Charts : http://www-cdserver.fnal.gov/cd_public/css/dsg/db_stats/data/db_stats.html The url for the ganglia charts (monitoring tools) is: http://fcdfmon2.fnal.gov/ Data Modeling Tool : Oracle Designer is used for Data Modeling and space estimates. Logintrace -> This enables DBA’s to have an archive of which oracle user logs In to the database under which O/S name, and how long D0 Taking Stock

- Daily, 7 days of archives, one always on DISK 6/17/2018 Back-up/Recovery D0ofprd1 - Daily, 7 days of archives, one always on DISK - Bi-weekly backup of READ ONLY tablespaces - Allocated 1179GB Used 755GB, Tape Daily, RMAN Back-up time -> 5 Hrs 45Min ( 3 Hrs Excl READ ONLY + 2 Hrs 45 Exclude READ ONLY ) No Export Tape Rotation : 1 Week for Daily backups and 2 months for Read Only backups. D0ofint1 Once a week on SAN D0ofdev1 - Daily 3 days of archives Sat on DISK otherwise on SAN -Allocated 100GB, used 58GB, Daily Tape Backup RMAN Backup time -> 1.5 Hr. Tape Rotation : 2 Months. - backup strategy for d0of lum boxes will be the SAN centralize strategy  READ ONLY Backups for OLD Event Partitions. No Event data on d0 offline integration. No READ ONLY backups. Nov 15, 2004 RMAN backup size was 506Gb , as of June 01, 2005 755Gb 250Gb growth in 6.5 Months. READ ONLY Backup Size is 265Gb and READ WRITE is 490GB D0 Taking Stock

Inexpensive, large disk array can accommodate growing RMAN backups RMAN Backup on SAN Inexpensive, large disk array can accommodate growing RMAN backups Fast & reliable backup and recovery 24 x 7 and 8 x 5 support tiers available Can serve various O/S platforms Briefing on the database backup/recovery standardization on june 16, it will discuss the san testing in more detail Multiplexing of archives to local disk and SAN D0 Taking Stock

RMAN to SAN test case on d0ofdev1 d0ofdev1 RMANs to SAN since Nov. ’04 Two 1TB SAN mount points available Keep 2 alternating days of RMANs on SAN, once/week to local backup disk RMAN validation to determine backup file integrity One validation failure since Nov. ’04 Recoveries from SAN were all successful D0 Taking Stock

Production backups to SAN Initial problems encountered due to incompatible PCI cards – solved now Two 1TB SAN mount points in use 2 daily backups – one to SAN, one to local backup disk Always 2 backups on disk, plus X200 tape library backup of RMAN from local disk Read-only portion of database backed up twice/month to local backup disk D0 Taking Stock

Current SAN is not 24 x 7 support SAN issues Current SAN is not 24 x 7 support IDE disks are not as reliable as other, more expensive disks are Purchasing 24 x 7 SAN requires licensing and changes to O/S to be able to use it Firewall issues (CDF & D0 online) D0 Taking Stock

Production Deployments : - Autodestination Sub-System of SAM schema - Indexes on Param Values Deployed in production. - Data Types correction cut. - Indexes for Volumes to be deployed on 06/07/05 - Partition Cut to be deployed on 06/07/05 Work-in-progress - Request Sub System of SAM Schema. Cut in Mini-sam. Upgrade to Mini SAM as SAM Schema Evolved. -> This facilitate individual developers to have copy of SAM metadata and seed data available for server software rewrite if needed. Mini-SAM in Postgres. Initiative to move towards free ware Databases for SAM Proof of product not complete, requires testing with a dbserver  from the sam development team 1.61B events in 32 Partitions. Now Avg 1 partition/ 3 running weeks Partitions Rollover dates URL : http://www-css.fnal.gov/dsg/internal/databs_appl/sam_event_partitions.html D0 Taking Stock

Deploy san/enstore backup recovery plan. 6/17/2018 What’s Next ? Deploy san/enstore backup recovery plan. ( TESTING OF SAN on d0ofprd1 is work-in-progress) Deployment of Lum Db in production. 10g. Possible Upgrade to 10g to d0ofprd1 due to enhanced feature of incremental database backups. Upgrade OEM to 10g Rewrite of dbatools/toolman for enhanced features of monitoring and 10g support. SAM Schema Deployment for SAM Request System. Testing of postgres mini sam for proof of product. Upgrade OEM to 10g : Upgrade OEM 10g is needed since we have 10g databases for CMS. To monitor CMS databases, upgrade OEM to 10g is needed. OEM 10g is backward compatible for monitoring 9i D0 Taking Stock

Backups will get bigger . So backup of VLDB Concerns Backups will get bigger . So backup of VLDB Speaker Bureau application to be moved to production ASAP. It is on dev being used in production mode. SAM Servers on Linux ? Not Enough Space for Integration db to do full refresh of SAM. Single point of failures with D0 offline database. future of the aging clarion array must be addressed in next budget. D0 Taking Stock