MICE Target Report Video Conference 29/11/07

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
The MICE Target Lara Howlett University of Sheffield.
Target Status Report Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
MOM Report Galina Vankova RAL, MICE Video Conference.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Electrical & Control Power Supplies Trevor Hartnett.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
MICE RF System Power Supplies, Control and Monitoring Status report
Presentation transcript:

MICE Target Report Video Conference 29/11/07 Chris Booth Sheffield 29th November 2007

University of Sheffield Target Preparation ISIS requirement of two complete systems Target actuator Support Control system Cooling circuit Monitoring Huge pressure on overloaded target team! Aim for two complete systems for January. Priority for parts to be installed inside ISIS (even if delay to second “demonstrator” system means we can’t operate it immediately ISIS comes on). Thanks for help from others with parts of system – see below. Chris Booth University of Sheffield

Not a good 2 weeks for the target! 1) Short circuit discovered between coil and cooling jacket. Not clear if this is a new problem(!) Actuator had done ~8M operations. Now dismantled and examined. No sign of wear on insulation. Coil (1 of 24) replaced and actuator reassembled. New actuator will go in ISIS. More thorough examination and testing of insulation to be performed before assembly. 2) Daresbury power supply brought to Sheffield for tests. Incorrect drive of coils (not seen with dummy load) damaged shaft. Subsequent operation led to destruction of DLC coatings on both shaft & lower bearing. PSU back at DL. Problem not really understood. Control simulator to be produced by Paul S., to investigate problem. (Yet more work for him instead of getting second electronics ready.) Chris Booth University of Sheffield

Increased support from Daresbury Lab Steve York to take on oversight of mechanical ordering and assembly. DL electronics to produce some circuit boards, crates & interconnecting cables (for second system). Some mechanical parts to be manufactured in DL workshop, including welded seals of actuator flanges. Work continues on PSU, stepper motor controls, interlocks. Several recent meetings with RAL & DL. Two shafts currently being machined at Oxford, for subsequent DLC coating. Chris Booth University of Sheffield

Planning for shutdown progressing:- Installation of fibres and cables through to synchrotron vault. Old target to be removed at beginning of January, after cool-down). Old beam pipe replaced by new. New support to be assembled in R78. First target assembly & alignment in R78 on new support. Tests with first set of electronics in R78. Installation in ISIS 2nd week January. Tests on stepper motor and gate valve controls (DL). Installation of control electronics in MICE LCR. Test of full target system on ISIS beam pipe. 2nd system built up in R78. (Cooling still to be tested.) Work schedules (RPA) submitted for: Target removal Target installation – awaiting feedback. LASER safety questions still pending. Trying to get answers from RAL, for patch-panel design. Chris Booth University of Sheffield