OMI OPERATIONS OVERVIEW

Slides:



Advertisements
Similar presentations
INTRODUCE SOME OF THE MOST RELEVANT NEW RULES FOR THE UPCOMING SEASON UPDATED OVERVIEW FROM SPRING MEETING NOW THAT FEDERATION BOOK IS OUT MORE SPECIFICS.
Advertisements

CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
Final Presentation EE 296 – Micromouse Spring 2007 Friday, May 4, 2007 POST 214.
SS On October 29, 1999, all instrument telemetry reported from TIMAS became invalid (zeroes). Subsequently, valid TIMAS telemetry has been sporadic, with.
80386DX.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
OMI ST meeting June 2006 Calibration & 0-1b data processing Marcel Dobber (KNMI)
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
AERONET DRAGON Campaign, Summer 2011 Christina Justice College Park Scholars – Science & Global Change Program Environmental Science and Policy
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Chapter 2 content Basic organization of computer What is motherboard
Chapter 3 DOCUMENTING ACCOUNTING SYSTEMS
InLoox 9 Web App Product Presentation
Memory Hierarchy Ideal memory is fast, large, and inexpensive
7th ACSF meeting London, June 28-30, 2016
Hardware & Software Reliability
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Testing gas dividers do require flow measurements :
Chapter 6: Database Project Management
Student Fees are Due.
Introduction to the Events Kernel EK
OSIRIS Horst Uwe Keller and the OSIRIS Team
William Stallings Computer Organization and Architecture 8th Edition
CINEMA System Engineering
GLAST Large Area Telescope:
Configuration Management and Layout Database ELENA Project
EM pre-integration review
ARDUINO LINE FOLLOWER ROBOT
Speed Sensor Calibration
MODIS Instrument Operations Team (IOT): Bryan Breen & Tony Salerno
0.0 Instrument Suite Name Presenter’s name
San Diego Conference 2 August 2001
Interrupt.
InLoox 9 Web App Product Presentation
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
The BioTector B3500ul TOC analyzer Process Tests
Topics Introduction to File Input and Output
Interrupts Interrupt is a process where an external device can get the attention of the microprocessor. The process starts from the I/O device The process.
Parallel communication interface 8255
SLAC DOE Program Review
Software Testing and Maintenance Maintenance and Evolution Overview
Launch and On-orbit Checkout
RAID Redundant Array of Inexpensive (Independent) Disks
Md. Mojahidul Islam Lecturer Dept. of Computer Science & Engineering
Threads Chapter 4.
Md. Mojahidul Islam Lecturer Dept. of Computer Science & Engineering
Recall: ROM example Here are three functions, V2V1V0, implemented with an 8 x 3 ROM. Blue crosses (X) indicate connections between decoder outputs and.
CubeSat vs. Science Instrument Complexity
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
CSE 451: Operating Systems Autumn 2003 Lecture 2 Architectural Support for Operating Systems Hank Levy 596 Allen Center 1.
CSE 451: Operating Systems Autumn 2001 Lecture 2 Architectural Support for Operating Systems Brian Bershad 310 Sieg Hall 1.
The Scientific Method.
ECE 352 Digital System Fundamentals
CSE 451: Operating Systems Winter 2007 Module 2 Architectural Support for Operating Systems Brian Bershad 562 Allen Center 1.
Introduction to Motors
CSE 451: Operating Systems Winter 2003 Lecture 2 Architectural Support for Operating Systems Hank Levy 412 Sieg Hall 1.
Chapter 3: Project Integration Management
STScI Ground System Development Status:
Topics Introduction to File Input and Output
ECE 352 Digital System Fundamentals
Programming Techniques :: Flow Diagrams and Pseudocode
and Forecasting Resources
Chapter 13: I/O Systems “The two main jobs of a computer are I/O and [CPU] processing. In many cases, the main job is I/O, and the [CPU] processing is.
Presentation transcript:

OMI OPERATIONS OVERVIEW Jacques Claas Instrument Operations Team KNMI The Netherlands

Content of Presentation Folding Mirror Mechanism (FMM) anomaly Operations status and outlook

FMM anomaly: purpose of FMM The FMM is a stepper motor. It is needed when performing calibration measurements FMM Design drawing of the OMI optical bench

FMM anomaly: overview On Feb 28th at 00:23:18 GMT OMI stopped generating science data due to a FMM anomaly. Investigation started immediately after the occurrence of the anomaly. Parties involved: - Instrument Operations Team - Industry (Dutch Space and TNO-TPD) - NASA / AURA Flight Operations Team Decisions were formalized by means of Non-Conformance Review Boards. OMI resumed generating science data on March 3rd (only earth and dark measurements, no calibration measurements). As part of the anomaly investigation 13 FMM tests were carried out in the period March 8th – May 17th. Although the FMM tests provided detailed information on the in-flight FMM behaviour, the FMM behaved nominally during all tests and no root cause could be found for the anomaly. On June 12th OMI resumed full nominal operations generating earth science data as well as calibration data.

FMM anomaly: operating the FMM For calibration measurements: - assume an unknown initial FMM position. - move the FMM from this unknown position to calibration position 0 by commanding 85 steps. - in case the FMM bounces against the endstop, indicated by a dark status of the opto-coupler, move the FMM 4 additional steps from position 4 to position 0. - when the calibration measurement is finished, move the FMM to the nadir position 79. For nadir (earth) measurements: - not needed to move the FMM, because the default position is the nadir position.

FMM anomaly: what went wrong? Till Feb 19th the FMM always bounced against the calibration endstop when moving to the calibration position. Between Feb 19th and Feb 28th the FMM not always bounced. On Feb 28th, when moving the FMM into calibration position for a LED calibration measurement, the opto-coupler status remained “dark” even after the 4 additional steps. Automatically a Fault Management procedure started, resulting in a transition to Idle mode which effectively stopped the generation of science data. As part of the Fault Management procedure, the FMM was moved to nadir position.

FMM anomaly: telemetry analysis Telemetry analysis showed that the FMM, as part of the Fault Management procedure, was indeed moved to nadir position. This was confirmed when, after March 3rd, earth images became available again which showed that the optical path was not blocked by the FMM.

FMM anomaly: testing the FMM Purpose of various tests: Tests 1-3: Find out if the FMM can be moved around its nadir position? Tests 4-5: Find out if the redundant FMM coils can be used, also in combination with the nominal FMM coils (double drive torque!) Tests 6-8: Find out if the FMM can be moved from the nadir position 79 to position 2 without loosing steps in between due to mechanical/electrical wear. Tests 9-10: Find out if there is mechanical/electrical wear or opto-coupler problem at position 1. Tests 11 (without WLS) – 12 (with WLS): Find out if there is mechanical/electrical wear or opto-coupler problem at position 0; find out if bouncing is taking place. Test 13 (with WLS): Find out the precise position of the calibration endstop by commanding FMM to virtual position -4; find out when FMM jumps back.

FMM anomaly: test results All tests were successful. During all tests the FMM showed nominal behaviour. There is no loss of steps when moving the FMM from nadir position to calibration position and vice versa. There is no indication for an opto-coupler problem. No bouncing against the calibration endstop takes place when commanding the FMM step-by-step. When using the WLS, the WLS signal is highest at FMM position 1 whereas position 0 (the calibration position) was expected. It turns out that the FMM position during a calibration measurement is just in front of the calibration endstop and not at the calibration endstop. A known initial position 79 can be assumed when starting to use the FMM.

FMM anomaly: cause and corrective action Despite all the successful tests, the root cause for the FMM anomaly has not been found. One possible cause (although it cannot be proven) is that, instead with the usual 4 steps, the FMM bounced 8 steps when moving to the calibration position. This has occurred only once during an on-ground test. Corrective action: A relation is assumed between the changing bouncing behaviour as observed between Feb 19th and Feb 28th and the FMM anomaly on Feb 28th. By operating the FMM in a different way, bouncing against the calibration endstop can be avoided. All calibration measurements are performed by means of Stored Instruction Sequences (SISs). All SISs that use the FMM will be modified to avoid bouncing. Replacing the old SISs by the new SISs will have no impact on the measurement schedule.

Operations Status and Outlook OMI is taking both earth and calibration measurements according to the (unchanged) Nominal Operations Baseline. On June 17th a new LED linearity measurement was performed for the first time giving more detailed information on the non-linear relation ship between the incoming flux on the CCD and the resulting number of electrons in the CCD read-out register. New products will be developed that enable a more flexible timing of the earth measurements during the ozone hole season. Except for the FMM anomaly there have been no other instrument anomalies. OMI is thermally still very stable. No change of thermal settings needed.

Current OMIS IOT team members KNMI Dutch Space Northrop Grumman Jacques Claas Mirna van Hoek Leo van Lent Ayman Mekhail AURA-FOT Available 24/7 Joe Purcell

OMI Operations So far so good!