CAA-OR (End of Phase 1) CAA DWP Operations Review

Slides:



Advertisements
Similar presentations
1 Metadata Tools for JISC Digitisation Projects of still images and text Ed Fay BOPCRIS, Hartley Library University of Southampton.
Advertisements

Rosetta Magnetic Field PDS Review B. J. Anderson.
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
LADEE PDS4 Experience G. Delory LADEE Instrument and PDS Teams LADEE SOC PDS Management Council Nov /19/2014 LADEE PDS4 Experience 1.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Rachelle Howell and Ellen M. Rathje University of Texas at Austin NEEScomm IT Development Team.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Science instruments data pipeline G. Martucci.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
CAA/CFA Meeting | CFA Team | ESAC | Octiber CFA Under Development CAA/CFA Meeting ESAC, Oct 11 th 2011 European Space AgencyCFA Team.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
Status and Perspectives on the “raw2dst2root” processing C. Guerrero, A. Hernandez, C. Weiss and F. Gunsing 2013 n_TOF Annual Collaboration Meeting Bologna,
CAA Database Overview Sinéad McCaffrey. Metadata ObservatoryExperiment Instrument Mission Dataset File.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March ESOC datasets.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
1 CAA 2009 Cross Cal 9, Jesus College, Cambridge, UK, March 2009 Caveats, Versions, Quality and Documentation Specification Chris Perry.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
20th CAA Cross Calibration Göttingen - October 15-16, 2014 Status of CIS Data Archival I. Dandouras, A. Barthe.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
NASA Earth Science Data Stewardship
Cluster Active Archive
CAA Operational Review 9 Double Star PEACE Team Report
Working with MAVEN Data
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
WP18, High-speed data recording Krzysztof Wrona, European XFEL
Status Report of EDI on the CAA
ROCC Operations and The PSA RSP Archive Concept Review 28 September 2017 Tanya Lim Archive Scientist.
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
Archiving and Document Transfer Utilities
Cluster data sets P-A Lindqvist, KTH
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
16th CAA Cross-calibration Workshop
CIS Data Archival Status
Cluster Active Archive – Wideband data BM2 mode
Cluster Active Archive Overview
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
20th CAA/DAA Cross Calibration Meeting
EDI – CAA STATUS REPORT EDI CAA Status
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Cluster Active Archive 1st Operations Review May 16-17, 2006
Jolene S. Pickett, Joanne M. Seeberger, Ivar W
Annual Report of the DWP Experiment 9th CAA Operations Review
Status Report of EDI on the CAA
The RSP Archive System RSP Archive Concept Review 28 September 2017
Jolene S. Pickett, Joanne M. Seeberger, and Ivar W. Christopher
Exploitation of ISS Scientific data - sustainability
Mission Science By Team 07.
Texas Student Data System
Instrument Status On/Off Cycle: 26 Hours On: ~47000 hours
Presentation transcript:

CAA-OR (End of Phase 1) CAA DWP Operations Review 2007-08 K. Yearby, I. Bates, H. St. C. K. Alleyne Space Systems Group, University of Sheffield, U.K.

Presentation Overview Introduction Summary of the status of the archive Recommendations of the OR-2 review board Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Summary

Archive Status (as of April 2008) ICD ID 2001 2002 2003 2004 2005 CP_DWP_TCOR Ingested Ingested Ingested Ingested Ingested CP_DWP_COR Validating Validating Ingested Ingested Ingested CP_DWP_LOG Ingested Ingested Ingested Ingested Ingested CP_DWP_UT_PIOR Delivered Delivered Delivered Delivered Delivered ICD ID Initial delivery Update CP_DWP_TED Ingested - CP_DWP_WEC_UM Ingested -

OR-2 Review Board Recommendations The board was pleased that responsibility for TED and the correlator has been satisfactorily transferred to Sheffield. R30: The DWP team have provided a clear data delivery schedule with milestones – the board urges that this schedule should be adhered to. DWP response: The DWP_TCOR dataset has been delivered in accordance with the schedule given in the 2007 annual report. Regrettably, this has not been the case for the other data products, although with the exception of the caveats, and the DWP_COR datasets for 2001 and 2002, all products have been delivered prior to this final review.

Presentation Overview Introduction Status of the instrument data products delivery DWP_TCOR DWP_COR_FX, ST DWP_LOG DWP_UT_PIOR Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Summary

Instrument Data Products Delivery Status DWP_TCOR The WEC time correction files allow the standard 2ms accuracy of the RDM timestamps to be improved to about 10μs. The correction consist of two terms: The offset specifies the difference in microseconds between the reference time (VC0 reset pulse) for the packet and the onboard time stamp for that packet The diff specifies the difference between the onboard time and UTC and is derived from time difference (basically onboard time minus ground receive time) measurements provided by ESOC, similar measurements extracted from the Wideband DSN data, and analysis of the time stamps of the housekeeping telemetry All DWP_TCOR data for the first phase (2001-2005) has been delivered and is online in the archive. In addition data for 2006 is delivered already. Further production is waiting for the availability of the WBD raw data DVDs for 2007 onwards.

Instrument Data Products Delivery Status DWP_COR_FX, ST The correlator data was originally the responsibility of the University of Sussex. Following their loss of funding this was transferred to Sheffield. The Sussex production software was not suitable for large scale use and omitted some important support data, so a new suite of production software was developed based loosely on that used for the CSDS (prime and summary parameter) dataset. This is used to process up to six months data at a time, including validation plots which are visually inspected before delivery. Data for 2001 and 2002 have been processed and are currently subject to manual validation before delivery to the CAA. Data for 2003 to 2005 inclusive has been delivered to the CAA and ingested.

Instrument Data Products Delivery Status DWP_LOG These are produced by automatic analysis of WEC telemetry. Validation is performed by translating CEF files to CSV (comma separated value) format, importing to a spreadsheet, and visually inspecting the result. Data for 2001 to 2005 inclusive has been delivered to the CAA and ingested. DWP_UT_PIOR These files already exist in the DWP planning system as plain ASCII files. For delivery to the CAA a procedure to process each planning period file has been developed to convert the plain ASCII files to CEF by inserting appropriate field and record delimiters, removing predicted scientific events that fall outside the particular planning period and extracting the names of the files used in the generation of the ASCII PIOR file to store in the CEF caveat metadata of the newly generated PIOR CEF file. Data for 2001 through to 2005 inclusive have been delivered to the CAA.

Presentation Overview Introduction Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Summary

Calibration and Cross-calibration activities DWP does not have its own sensors, but processes data from other WEC instruments, and PEACE. DWP does not currently participate in any of the cross calibration activities, but we are happy to assist if needed.

Presentation Overview Introduction Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA DWP_TED Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Summary

Software Delivery Status No DWP software is planned to run in the archive, but… DWP_TED The WEC telemetry extraction and decommutation (TED) software is managed by Sheffield. The latest version is 2.5.0.108 (based on version 2.4.3) and appears satisfactory for those using it. It is archived as documentation for reference purposes only. The TED software is the first stage in the processing of WEC science data by all WEC teams. It can be used in two ways: As a stand alone application (levelone) reading the RDM, extracting the data for one or more WEC instruments, and writing it to decommutated science data (DSD) files. As a library, allowing application software to read the WEC RDM directly.

Presentation Overview Introduction Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the documentation delivery DWP_WEC_UM DWP_ICD Overview of the archiving activity for the extension Open issues, problems etc. Summary

Documentation Delivery Status DWP_WEC_UM This has been delivered and ‘ingested’ in the sense it is available from the CAA under the DWP documentation section. DWP_ICD Changes from the DWP_ICD_V4 include: An update to DWP_COR procedure and CEF metadata description (due to move from Sussex to Sheffield) DWP_PIOR is now a CEF product, not plain ASCII Changes to the presentation of the CEF metadata Personnel updates This new version is still to be delivered to the CAA.

Presentation Overview Introduction Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the data products provision Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Summary

Archiving Activity for the Extension 2009 2008 2007 2006 ICD ID End of mission + 3 months 2009-03-31 2008-10-31 2008-07-31 CP_DWP_UT_PIOR CP_DWP_LOG CP_DWP_COR Delivered CP_DWP_TCOR DWP_COR, DWP_LOG and DWP_UT_PIOR: For late 2008, and 2009 it is expected data can be delivered monthly, with two to three months delay. DWP_COR: Some minor changes to the production procedure will be needed for DWP_COR data 2006 onwards. This is because the PEACE RDM is not held online at Sheffield, but instead the much smaller intermediate files containing only the support data needed for the correlator.

Presentation Overview Introduction Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the data products provision Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Management DWP_UT_PIOR Summary

Open Issues, Problems etc. Management At the start of the CAA contract, responsibility for the DWP_COR dataset and the DWP_TED software was with the University of Sussex. Following the loss of funding for this group at the end of March 2006, responsibility for these products was transferred to Sheffield. The University of Sheffield team also suffered a 50 percent reduction in national funding, from 3 people to 1.5, although using internal reserves we were able to continue to employ 2 people (Keith Yearby and Simon Walker) for Cluster operations and data processing, in addition to our ESA funded CAA developer (Ian Bates). The contract for Ian Bates expired at the end of April 2008. It is intended that Keith Yearby and Simon Walker will now share responsibility for CAA work, with the ESA CAA funding being used to make good the shortfall in national (STFC) funding for their positions. This assumes national funding will continue at current levels, which is uncertain after September 2008.

Open Issues, Problems etc. DWP_UT_PIOR The PIOR dataset was unique amongst the DWP products in that the PIOR applied to all four Cluster spacecraft simultaneously, and the ’standard’ C1..4_CH_ Observatory and Experiment header files were not able to carry this information. This problem was resolved by a recent addition to the original metadata specification allowing a MULTIPLE enumerated value to specify subsequently all four cluster spacecraft. CEFpass 1.3.2 does not recognise the MULTIPLE value but the dataset does parse with ‘dummy’ CEH files. We await feedback from the CAA that this dataset can be ingested.

Presentation Overview Introduction Status of the instrument data products delivery Status of the instrument calibration and cross-calibration activity Software development: status and delivery to the CAA Status of the data products provision Status of the documentation delivery Overview of the archiving activity for the extension Open issues, problems etc. Summary

Summary Current Status Planned Extension Activity DWP_COR, DWP_TCOR, DWP_LOG, DWP_UT_PIOR, DWP_TED and DWP_WEC_UM for Measurement Years 2001, 2002, 2003, 2004 and 2005 are all processed and in most cases delivered to the CAA and ingested. Planned Extension Activity DWP_COR, DWP_TCOR, DWP_LOG and DWP_UT_PIOR 2006, 2007, 2008 and 2009 are to be processed and delivered to the CAA as described in the Extension Data Delivery Schedule.

The End!