IMS Update Content Packaging; InterActive Content SIG

Slides:



Advertisements
Similar presentations
18 March 2004 Colin Milligan funded by. © RELOAD 2003, funded by Workshop Structure Session I Introduction: Interoperability and Reload Session II Content.
Advertisements

Susan Eales Programme Manager Exchange for Learning (X4L)
Terminologies in Education Teachers, Learners & Learning Resources Sarah Currier CETIS Educational Content SIG Coordinator Centre for Academic Practice,
Copyright © 2001 Bolton Institute Centre for Educational Technology Interoperability Standards CETIS an introduction and overview Lisa Corley CETIS Pedagogy.
Overview of IMS Content Packaging Sheila MacNeill.
December 9 th, 2013 Given by: Rose Rocchio. IMS Global Update Overall Health of org is strong 220 Total conformance certifications (80 this year) IMS.
© 2001 By Default! A Free sample background from Slide 1 Interoperability: future- proofing CAA Niall Sclater CETIS Manager,
IMS Enterprise Services v2.0 Vashti Zarach JISC CETIS Tuesday 6 th Feb 2007 Chester Zoo.
© Copyright 2006 IMS/GLC All Rights Reserved. Innovation · Adoption · Learning 1 Update on IMS Enterprise Services v2 and Sakai Linda Feng & Michael Feldstein.
IEEE Learning Technology Standards Committee Report to Plugfest 9 Prepared by Robby Robson Chair, LTSC February 23, 2005 LTSC This work.
Learning Content Standards Demos, Details, and De-mystification Robby Robson, Eduworks Chair, IEEE Learning Technology Standards Committee
ALFANET September 23th, 2005UNFOLD-PROLEARN workshopValkenburg Authoring a full life cycle model in standards-based adaptive elearning Peter van Rosmalen.
Organizational Update: The Next IMS/GLC Ed Walker NLII 2005.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Workshop on Educational resources for 21st century Schools Jordi Vivancos CITE Symposium March 2010.
© 2001 By Default! A Free sample background from Slide 1 An eejit’s guide to IMS Question and Test Interoperability Niall.
LCMS: What is thriving the Dutch, hype or need? Jocelyn Manderveld Educational Technology Expertise Centre Open University of the Netherlands.
IMS Learning Object Discovery & Exchange David Massart, IMS LODE co-chair EdReNe Expert Workshop 4.1 January 8, London, UK David Massart, IMS LODE.
SWORD Stories - Easy Deposit Cutting Through Repositories’ Red Tape Sarah Currier Consultancy | E-Learning * Resource Sharing * Web 2.0 * Metadata * Repositories.
Becta CETIS FE Tools Seminar Steve Jeyes CETIS /Edexcel / Newark and Sherwood College Becta 15 th January 2004 eLearning Frameworks.
UK LOM Core How and why it came about Charles Duncan, Intrallect
Learning Technology Interoperability Standards Niall Sclater, and Lorna M. Campbell,
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
COLIS Demonstrator: Project and Industry Scenarios Dr James Dalziel Executive Director WebMCQ Pty Ltd COLIS Workshop Presentation, July.
Welcome slide. Key Information Sets HESA training seminar School of Oriental and African Studies, London Wednesday 22 February 2012 Richard Puttock and.
IEEE Learning Technology Standards AICC MEETING – FEB 2004.
Final Deadlines for students aiming to graduate in November 2013 April 4th PGR4 submitted to Registry (to approve examiners at next GSB) July 8 th Submission.
Colin Milligan funded by Reload Update: LD is coming.
SCORM Status. 2 Stabilization, Clarification and Issue Resolution Bug Fixes, Corrections & Clarifications SCORM 2004 January 2004 SCORM nd Edition.
Overview Collected learning resources Competencies Registry/ Authority Course Delivery system Student Pedagogy Tests/ assessment Activities Communication.
CETIS Educational Content SIG, Learning and Teaching Scotland, September 2004 Content Specifications Update Wilbert Kraan Lorna M. Campbell CETIS.
Tools Report Engineering Node March 2007
CETIS Assessment SIG Rowin Cross CETIS Assessment SIG, University of Strathclyde.
Copyright © 2001 Bolton Institute Copyright © 2001 Bolton Institute Centre for Educational Technology Interoperability Standards CETIS Pedagogy Forum update.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
CETIS Further Education Focus Group Steve Jeyes Newark and Sherwood College Edexcel International Edinburgh 21st June 2002 Valkenburg Report.
Europortfolio Europass CV ePortfolio interop IMS ePortfolio Interoperability (ZIP IMS eP CP Import/Export) Model based on Europass CV Application Profile.
Introduction to Learning Technology Interoperability Standards & CETIS Lorna M. Campbell CETIS Assistant Director Glenrothes College, August 2003.
Learning Technology Interoperability Standards Lorna M. Campbell and Boon Low CETIS and the University of Strathclyde LMC, SURF Presentation, April 2002.
IMS ePortfolio Specifications Salzburg, Austria Andy Heath
Third meeting of the Valkenburg Group  Informal network of EML implementers and developers.  Established following the “Developing an EML Authoring and.
CETIS Educational Content Special Interest Group 6 th Meeting, University of London Library 25 February 2003 Sarah Currier Coordinator CETIS EC SIG Centre.
Moderator Training – unitised assessment
Open Access and the post-2014 REF Policy update - October 2015
Managing the Project Lifecycle
Report to CETIS EC SIG Meeting
Mini Global Demonstration
Specs & Standards Update: December 2003
Becta CETIS FE Tools Seminar
The School Point of View
Gateway to Competency Portability
CIM Model Manager Report
Yearly Maintenance Process (for existing messages)
ESB Networks Market Release Meeting of the IGG, March 5th 2009
IEEE MEDIA INDEPENDENT HANDOVER
PCS CCB Group 22nd February, 2017.
CVE.
Education and Training Statistics Working Group – 2-3 June 2016
Chelan-Douglas Coalition for Health Improvement
IEEE IMT-Advanced Review Process
Ctclink executive leadership committee May 31, 2018
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Opening report for TG4j (MBAN) Task Group, Nov.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
Executive Project Kickoff
Street Manager High-level roadmap
Reusable Learning Objects: The Delivery Perspective
August 19 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG-NAN Closing Report for Dallas,
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
Presentation transcript:

IMS Update Content Packaging; InterActive Content SIG IMS Update: August 2003 IMS Update Content Packaging; InterActive Content SIG CETIS EC SIG 8th Meeting Learning & Teaching Scotland 28 August 2003 Sarah Currier CETIS EC SIG Coordinator sarah.currier@strath.ac.uk with thanks to Lorna M. Campbell

IMS Update August 2003: Current Specifications IMS now has 10 released specifications: Meta-Data (1.2.2: see also IEEE LOM) Enterprise (1.1 Final Release, Jul 2002) Content Packaging (v.1.1.3 on website: but problems!) Question and Test Interoperability (1.2.1: developments coming) Learner Information Package (1.0 Final Spec, Mar 2001) Reusable Definition of CEOs (1.0 Final Spec, Oct 2002) Digital Repositories Interoperability (1.0, Jan 2003) Accessibility for LIP (1.0 Final Spec, July 2003) Simple Sequencing (1.0 Final Spec, March 2003) Learning Design (1.0 Final Spec, Feb 2003) To download specs and for more info see: http://imsglobal.org/specifications.cfm

IMS Update August 2003: Content Packaging Maintenance 1.1.3 maintenance release came out, but has errors in it. Issues relating to “isVisible” attribute and resulting compatibility of SS & LD still not resolved. “Alternative Resources” (e.g. for accessibility) rejected by Technical Board. These issues now being dealt with- details still not clear. For more detail or to give feedback e-mail me. For discussion e-mail the EC SIG list.

IMS Update August 2003: Second generation developments Vocabulary Definition Exchange (VDEX) Meta-data Enterprise Services General Web Services InterActive Content Digital Libraries Mobile Learning Simulation ePortfolio Working with O.K.I.

IMS Update August 2003: InterActive Content SIG Was Active Content, the “Big Bucket” SIG; split off: Simulation SIG & Mobile Learning SIG. Improve runtime model and API functionality. Spec harmonisation and integration for LD, QTI, SS and CP.

IMS Update August 2003: InterActive Content SIG Scoping phase: call for use cases Many use cases submitted from around the world. A good number from CETIS EC SIG, Assessment SIG & FE Focus Group. Now available on EC SIG site. IMS has public use case repository: http://www.imsglobal.org/usecases/index.cfm Deadline passed but still accepting use cases; contact me if you have any. From use cases 2 groups for charter development were formed.

IMS Update August 2003: InterActive Content SIG Scoping phase: Where we’re up to Group A: Specification harmonization Charter for voting nearly ready Focused on QTI update including harmonizing with CP, LD and SS specs LD & SS update issues deferred; too early Group B: API / datamodel / messaging models Too early for spec development Gathering data from communities of practice After Sept. 8th, will be asking EC SIG for help!

IMS Update August 2003: InterActive Content SIG Scoping phase: Group A Charter QTI v.2.0 5 Key objectives: New version of QTI <item> spec to address previously deferred issues Best practice for putting QTI into Content Packages Binding for QTI outcomes in the CMI datamodel Binding for QTI outcomes to Learning Design properties Binding for QTI outcomes to Simple Sequencing objectives

IMS Update August 2003: InterActive Content SIG Scoping phase: Group A Charter QTI v.2.0 Out of Scope: QTI v.1 “Selection and Ordering” and “Outcomes Processing” – therefore support for adaptive testing Assessment security issues NB: This charter still has to be approved!

IMS Update August 2003: Next Steps Next IMS Meeting: Nov. 10th-14th 2003. IMS website now revamped; check it out: http://imsglobal.org/ NB: These slides are an on-the-fly update only; the information given is subject to change! The EC SIG needs you!