By Adam Beneroff Manitoba Hydro Place.

Slides:



Advertisements
Similar presentations
Ecological Sustainable Development Tour A Education Facilities Research Group.
Advertisements

Contents: Cover
Gish Family Apartments By, Jeffrey Chan. Overview Building: Gish Family Apartments Location: San Jose, CA Building type: Special needs housing, Multi-unit.
Ft. Lauderdale Region Counties: Broward.
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
East Bridgford Project Existing Projects The Green Box Project Adaptation Techniques used within this project:- Natural ventilation is increased by a passive.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Images and text from HKT Architects – Project Architects.
Sustainable Hotel Design Group 5 Presentation 4 Demand/Supply Matching.
Direct solar radiation is both a powerful environmental stress & renewable energy resource. The sun’s energy is most concentrated on the roof (spring through.
P3Architecture and Sustainable Design Sustainable Design Strategies.
BRE Energy Efficient Office of the Future
Passive Heating and Cooling
th Street - Matarozzi/Pelsinger Building By Eric Bobrow.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
SUSTAINABLE METHODS AND TRENDS Sebastian Eilert, AIA, LEED AP October 9, 2007.
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
Engert, Scheriau, Wimmer SS 2010 Energy and sustainable development, Prof. Schleicher.
SUSTAINABLE RESIDENTIAL DESIGN PROJECT SIKESTON HOUSE Project 12 DS 413 MAY 8 TH, 2012.
Sustainable Design Energy Sciences Building. 2 Sustainability Regulations DOE final rule [10 CFR part 433] (30% better than ASHRAE) DOE Order 430.2b:
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT Project 1 DS 413: Design Studio 413 May 9, 2012.
Tour Stop 1: Outside The Building. Community Connectivity Encourages A Walkable Neighborhood At least 10 community services, and high density residential.
BECOMING GREEN Santa Margarita High School Academic Building.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Project 6 DS 413: Design Studio 413 May 9, 2012.
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
Ecological Design: Creating the Green Mountain Center for Sustainable Living Deirdre Huzzard, Environmental Studies with a Concentration in Science Beth.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Green Building Residential Construction
Net-Zero Energy Classroom! Lets Design a….  Active Solar – PV (Photovoltaic) Panels convert sunlight into electricity.  Wind Power – When the wind blows,
Curtain Walling System Cladding System Insulation Panels.
The Terry Thomas Sustainable and Ecological Architecure By: William Wenik.
Sustainable Design Chad Sims Jason Sells.
The Omega Center for Sustainable Living By Andre Batocabe.
General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
Mission Statement Axonometric View Site plan Floor Plan Roof Plan Plumbing plan South Elevation North Elevation East Elevation West Elevation Section.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Zero Energy Home’s Features and Appliances Interior and Exterior Features: Roofing Insulation Windows Energy Saving Appliances.
Sustainability in Non Domestic Construction By Professor Christopher Gorse – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Energy Design of Buildings using Thermal Mass Cement Association of Canada July 2006.
A R C H I T E C T S E M I N A R WEBER+THOMPSON Founded-1987 B.Arch: University of Hawaii Studied under Jorn Utzon and Arata Isozaki Chairman of Washington.
Question 4 “Site Ecology”. key environmental issues: land use and stormwater management.
Twelve West By Henry Thomas. General Information Portland, Oregon.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Renewable Energy Technologies and the Building Schools for the Future Programme Property Group - M&E Team Michael J Rigby M & E Team Manager Mechanical.
KSU 2015 JONATHAN MCCONNELL LIVING BUILDING CHALLENGE.
Architecture Supported by:
Sustainable Efforts in Housing
Building Environmental Systems
Objectives of a Green Building
GREEN BUILDING MODEL Prashant Motwani (13MST0021)
In addition to drought resistant lawn, there are many different drought tolerant plants Site Ecology.
FLOATING STUDENT RESIDENCE
Concepts and Design Ideas
INTD409 Interior Environmental Technology Fall 2014/15
Why green? Let’s talk about why it is important to make green building a design and construction standard, and not an “added bonus.” What does “being green”
INTD409 Interior Environmental Technology Spring2016/17
Arch205 building construction Windows- glazed curtain wall, skylights
LEED BD+C – Integrative Process
Concept of Energy Efficiency
Living Building Challenge
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Technology in Architecture
Presentation transcript:

By Adam Beneroff Manitoba Hydro Place

General Information

Location Manitoba Hydro Place is located in Winnipeg, Manitoba, Canada

Building Type The building is a commercial office and a community building.

Building use Its main use is as a corporate headquarters for Manitoba Hydro

Type of Project The building is a new construction

Dates It won the award for one the AIA top ten green projects in 2010 Construction finished in September of 2009

Architects Kuwabara Payne McKenna Blumberg Architects, and Smith Carter Architects and Engineers Incorporated

Ecological Materials and Resources Used

They used locally quarried Tyndall limestone

All of the carpet tiles are made from %100 recycled materials

Douglas fir elements were mainly sourced from the pre existing buildings

High-performance double and triple glazed unitized curtain wall panels

All interior materials meet low-VOC standards in order to provide a safe and healthy working environment

Energy Efficiency

The building has radiant heating and cooling delivered through an exposed concrete thermal mass

High efficacy T-5 fluorescent lamps are dimmable, equipped with day lighting and occupancy sensors, and are individually adjustable

Day light is also used and comes from large exterior windows and high ceilings Large-format automated louvers within the double façade open and close throughout the day to minimize solar gain and glare

The large geothermal field, high-efficiency condensing boilers, and efficient heating and cooling systems ensure that supply and exchange is utilized

A sophisticated building management system monitors internal and external environments to optimize lighting, solar shading, and heating and cooling loads while taking advantage of passive energy sources

All green roofs employ native plant species, irrigated by rainfall or, during drought conditions, by condensate collected from the building’s mechanical equipment

Site Ecology

Structural and glazing systems emphasize lightness and transparency to reduce the impact of the mass on the surrounding neighborhood

Fifteen hundred free parking spots were written out of the design as employees embraced public transit incentives

All plant species incorporated into the green roof are native to the region

The site was specifically selected to maximize energy efficiency, sustainable technologies, public transport availability, and urbanization

The roofs of the podium feature deep-soil intensive green roofs and create accessible, lushly landscaped terraces as an outdoor amenity for employees

Water Resources

Excess rainwater is held within the green roof tray system until the planting medium is ready to absorb it

Excess condensate generated by the building’s fan coil units during the hot summer months is directed to large cisterns

When conditions warrant, this reclaimed water is pumped back up to the green roof and redistributed via an efficient drip irrigation system

Waterless urinals and low-flow toilets and sinks are used throughout the building

Cost Implications

Since the first occupants moved into the building in December 2009, the building has exceeded the original 60% energy savings goal and is now targeting 64.9% energy savings

User control of lighting in the offices, managed through desktop computers, is projected to save an additional 10%–15% in electrical lighting loads

an outdoor park in the south portion of the site and a publicly accessible, three-story-high Public Galleria that runs the full length of the podium base to connect the north and south entrances and provide a new interior, barrier-free gathering space that can accommodate over 1,000 occupants for concerts, farmer’s and Christmas markets, and special events.

The building’s plan organizes vertical neighborhoods around north and south atria to create a sense of community in the high-rise format