Beam Loss and Radiation Working Group: Conclusions

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Air activation inside and around the SPS beam dump M. Baudin H. Vincke DGS-RP-AS.
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Loss in TED Loss in magnet Loss in iron rod Assessment of the production of airborne radioactivity caused by various beam loss scenarios in the SPS.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
CLIC/CLEX controls Radiation issue August 29 th, 2012 F.Locci - BE/CO-FE.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
PS losses during CT extraction, a history about 30 year long... J. Barranco, S. Gilardoni CERN - AB/ABP.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
1 SLHC-WP5 Progress Contributions from I. Dawson, L. Nicolas (U Birmingham), S. Pospisil (ITU Prague) T. Kramer, B. Goddard, M. Benedikt, Helmut.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LIU / HL-LHC Cost and Schedule Review
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Shielding Design for LCLS Injector Operation – Phase one
ICE SECTION The coolest place to be! Elias Métral
The TV Beam Observation system - BTV
Radiation monitoring and follow up during LHC commissioning
(Beam) Impact of MTE on the PS septa
Sparking of SPS electrostatic septa in presence of e-cloud
Radiation protection of Linac4 M. Silari Radiation Protection Group
Installations, modifications, consolidation in 2005:
Renovation of the 45-year old PS magnets
LIU, ABP-CWG, PBC, miscellaneous
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Acknowledgments: LIU-PT members and deputies, H. Bartosik
East Hall under construction
Michael Benedikt AB/OP
CNGS Primary Beam Results 2010
Collimator Control (SEUs & R2E Outlook)
Remote setting of LHC BLM thresholds?
Use of Beam Loss Monitor type detectors in CNGS muon station
Interlocking of CNGS (and other high intensity beams) at the SPS
Elias Métral for the BLRWG ( min, 21 slides)
Update on Dark current generation in ILC Main Linac
Preliminary Study – Radiation induced activity in a SB Target
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
CNGS Primary Beam Results
Beam dynamics requirements after LS2
C. Adorisio Extracted from the presentation given at
CNGS Primary Beam Results 2011
First meeting of the LIS section: Welcome to the new members!!
TT40 incident at 23:46 on 25th October 2004
Presentation transcript:

Beam Loss and Radiation Working Group: Conclusions G. Arduini, M. Benedikt, M. Giovannozzi, B. Goddard, C. Hill, E. Métral, E. Shaposhnikova – AB D. Forkel-Wirth, T. Otto, H. Vincke – SC/RP 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

BLRWG@LII - G.Arduini - AB/ABP Major issues Analysis of the radiological impact assuming nominal p.o.t. (i.e. requests from expt.) and losses measured during operation, CNGS test in 2004 and LHC MDs. Major Issues ordered as a function of their decreasing impact on the public and the personnel: The PS bridge and the PS North and South Hall TDC2/TCC2 areas in the SPS Air release points in Meyrin (in particular TT10) Straight section 31 in the PS ECA4 area in the SPS 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

BLRWG@LII - G.Arduini - AB/ABP PS bridge Small losses in MMU8 (0.8%) during CT extraction for CNGS and FT beams. Important radiological impact because of the insufficient shielding (1.8 – 2.6 and 3.4 m): 490 mSv/h on top of the PS bridge Stray radiation at CERN fence (~450mSv/y – above legal limit = 300 mSv/y and above “optimization limit” = 10 mSv/y) North Hall South Hall PS M. Poehler – TS/CE 1.8 to 3.4 m 4.8 m  +1.4 m shielding Drawing office: up to 2.5 mSv/y for 2000 h of work. MCR 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

PS bridge (proposed actions) Origin of the losses  We need to address this Top of the PS bridge = controlled area (done) Additional radiation monitors for benchmarking the code (being done) Reinforcement of the shielding to 4.8 m all along the bridge  Dose rate at the fence to ~10mSv/y. FEASIBLE (TS/CE) but detailed study (0.3 FTE – TS/CE) is required + 1-2 MCHF to realize it. Need to study LINAC4 impact in the South Hall 3. Digitalisation by 12 bit ADC and generation of reset signal. Sampling period 100 ms and reset after each PS cycle. (only upper 8 ADC bit are used). 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

TDC2/TCC2 (SPS North Area) Air activation: Normally the air is re-circulated (no fresh air intake) even during access  Additional dose by inhalation Injection/extraction unit exists and can be started any time locally. No radiation monitoring of the air released through TDC2/TCC2 stack No air monitoring in the tunnel. Accidental activation of the extraction system during beam operation  10mSv to the public (critical group) in few days Exemption limit for 3H is 2x10^5 Bq/kg 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

TDC2/TCC2 (proposed actions) Radiation Monitoring of the air released at the TDC2/TCC2 ventilation outlet Ventilation system will be started manually with a key in possession of SC/RP Radiation monitoring of the air in TDC2/TCC2 Mainly for the CV part Ideal solution: zone controlled  ventilation can be switched ON, i.e. electrical power available Zone closed  ventilation no electricity  must be off Last point: FTE required for FLUKA simulations (for calibration) and detector development. 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

Air release points in Meyrin Major contributions to dose to the public: TT10 (4.2 mSv/y) ISOLDE (3.5 mSv/y) PS ring (1.8 mSv/y) Air in the SPS tunnel between LSS6 and LSS2 is extracted through TT10 Radioactive air release mainly due to: high energy dump in the SPS LSS2 extraction Losses TT2-TT10 H. Vincke LHC MD NO BEAM MD CNGS TEST || FT Swiss customs and St. Genis Hostel The sum is already close to 10 muSv/y 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

Air release points in Meyrin (proposed actions) Air radiation monitoring data available in CCC Need to confirm/refine the above correlation and to study the dependence on the mode of operation of the ventilation in TT10 (will be done)  need follow-up on the mode of operation of the ventilation (TT10 ventilation unit ON/OFF?). Minimization of the beam dumped at high energy (during operation and studies) TOF, 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

Straight Section 31 in the PS >100 mSv/y >10 mSv/y Losses (ES septum) during CT extraction for CNGS and FT beams Expect > 100 mSv/y in the office space close to that area (48 offices, 65 people: 5 from AB/BI, 7 from SC/RP, 14 AB Hon. Members, 39 from PH and IT, all full time?) Additional contribution to the dose at the fence Residual radiation in SS31 (~3mSv/h 4 weeks after a machine stop) Working year of 2000 h. 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP T. Otto

Straight Section 31 in the PS (proposed actions) New MTE: real solution to reduce the losses  Need to contribute (money will be made available) Radiation monitoring of the office space to benchmark simulation results in 2006 (will be done) If radiation measurements confirm the simulations: Temporary relocation of the personnel (at least those at full time) Increase the earth shielding by 1.5 m. (TS/CE – 100-200 kCHF) Monitoring of the air activation in the tunnel required to benchmark the estimates for the air activation from the PS ring. Action: AB/ABP, AB/BT, AB/PO, AT/MEL, AT/VAC – 17 FTE + 6.2 MCHF 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

BLRWG@LII - G.Arduini - AB/ABP ECA4 Forbidden area in case of systematic loss – VERY UNLIKELY Particles in the beam gap between the two CNGS batches (0.7% of the beam): <0.1% lost on TPSG protection element in front of extraction septa After shielding upgrade (SD 2004-2006) for nominal CNGS operation  H. Vincke <1.5mSv/h <25mSv/h <7mSv/h 6 mSv/y limit for simple controlled area (3 muSv/h) for a working year with 2000 h Forbidden area (>100 mSv/h) in case of systematic full beam loss 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

ECA4 (proposed actions) Access to the gangways located in ECA4 (2 highest levels) closed with safety keys (being done) Measurements of the dose rates during CNGS commissioning and operation Abort gap measurement and cleaning (will be done)  Need to study phenomena leading to the population of the gap. 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP

Summary and Conclusions In 2006 strongest limitation for high intensity operation losses under the PS bridge  limit to ~2×1019 p.o.t. understanding of the cause of the loss Implications of LINAC4 installation in South Hall Environmental monitoring in TDC2/TCC2 and interlocking of the ventilation system to prevent accidental release of activated air is needed. Release of radioactive air in Meyrin needs to be kept under control and the different contributions fully identified New Multi-Turn Extraction only mean to reduce the losses in SS31. ECA4 access conditions might be reviewed at the end of the run supported by the radiation monitoring data. Here the major issues and upgrades requiring additional resources are listed. 10th April 2006 BLRWG@LII - G.Arduini - AB/ABP