MC ’04-’05 objectives                                                       

Slides:



Advertisements
Similar presentations
Status reports/Discussion items S. DellAgnello DC geometry review DC wire sag measurements P. de SimoneDC s-t relations with new sag model S. Miscetti.
Advertisements

Status reports Trigger simulationM. Palutan, B. Sciascia DC GeometryA. Antonelli, S. Dell’Agnello DC wire sag measurementS. Dell’Agnello, C. Forti DC s-t.
Wing Attack - Plan R or How I learned to stop worrying and love the Monte Carlo 06/06/06.
Status report on EMC simulation... Part 3 The plan is to:  SURVEY the existing situation over the runs - Validation of plots using  and.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s M. Palutan et al.Trigger simulation parameters S. GiovannellaGEANFI.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
Notes on offline data handling M. Moulson Frascati, 29 March 2006.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
Status reports M. Antonelli ISR and f decay simulation S. Dell’AgnelloDC geometry review P. de SimoneDC s-t relations with new sag model A. AntonelliDC.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
Offline/MC status report M. Moulson 6th KLOE Physics Workshop Sabaudia, May 2006.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Annual Meeting 2005/05/29.
Offline meeting  Status of MC/Datarec  Priorities for the future LNF, Sep
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
CBM ECAL simulation status Prokudin Mikhail ITEP.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Status of the TOF February 22, 2001 Straight-line tracking What have we learned?
1 QuickSim - brief introduction - Akiya Miyamoto KEK 22 June 2005 GLD meeting See also.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
STAR Simulation. Status and plans V. Perevoztchikov Brookhaven National Laboratory,USA.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
BESIII offline software group Status of BESIII Event Reconstruction System.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
ΜTPC Reconstruction Status Report (…mostly a late night / weekend project … ) D. A. Jensen March 1, 2007.
MC/OFFLINE meeting  Status  Request by Ke2 group  aob LNF
11 Sep 2007Tracking - Paul Dauncey1 Tracking Code Paul Dauncey, Imperial College London.
1 MC Production and Reconstruction Summary and Plans Valeria Bartsch, Fabrizio Salvatore, A.-M. Magnan, and Nigel Watson.
Susanna Costanza - Pavia Group PANDA C.M., Stockholm – June 14, 2010
Preliminary Analysis of the New Focusing DIRC Prototype Beam Data
April12 DST calibration status
Parameterization of EMC response for
Update on Trigger simulation
Update on the false-dead DC wire problem
FSC status and plans Pavel Semenov IHEP, Protvino
Salvatore Fiore Università di Roma “La Sapienza”
Offline Software A. Dobbs CM43 30th October 2015.
Large scale MC production II
Cross section of the process
Tracking results from Au+Au test Beam
Charles F. Maguire Vanderbilt University
TOF CALIBRATION DATABASE
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Issues with Simulating High Luminosities in ATLAS
Kevin Burkett Harvard University June 12, 2001
KLOE General Meeting - LNF March,
DC monitoring - calibration - simulation - corrections
p0 life time analysis: general method, updates and preliminary result
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
First physics from the ALICE electromagnetic calorimeters
Silicon Tracking with GENFIT
Linear Collider Simulation Tools
Pentaquark Searches and DsJ Studies in BaBar
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Missing B-tracks in L1 trigger
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Presentation transcript:

MC ’04-’05 objectives                                                       

MC ’04-’05 production test proposal Get the ball rolling! Platform for testing items nominally done or near completion Additional items to inserted in a second production test Features: 100 pb–1 of 2004-2005 all_phys card at LSF = 0.2 Standard scripts and offline machinery Results written to tape library MCDST's produced. Delete files after study to make way for 2nd test or real production Timescale: 01-Sep-05 Built-in realism regarding August: treat this as firm deadline

Items for production test: Summary Status New IR geometry Ready EmC energy response ? EmC timing resolution adjustments Work New cluster efficiency parameters Nuclear interactions/regeneration New secondary decay generators LSB (background) insertion SQZ (compession) fix Cell/cluster index fix

MC work 1/9: Geometry and IR Simulation of new IR Geometry added to MC, new card IRTY added (CB) Status: Ready for production test New card to specify beam-crossing angle Add BCAN card (TS) to GEANFI Official production: Angle calculated from HepDB values Private production: No way to specify (fixed at 0.0125 rad) Status: Not necessary for production test Good idea to add ASAP for individual users

MC work 2/9: EmC energy response Attenuation lengths in endcap modules Short/central modules have different attenuation lengths; these were reversed in MC Status: Simulation fixed (CB), ready for production test Calorimeter energy scale calibration: Disable extra y-dependent attenuation factor for endcaps in CLUADJUST module Need further studies: y-dependence of endcap response, overall energy scale Status: Futher work requires following items: Fix attenutation lengths, extra factor in CLUADJUST SQZ fixed so MCEL cluster energies can be re-read Can results of a production test be used for further tuning?

MC work 3/9: EmC clusters EmC time resolution Common smearing in simulation (140 ps) zeroed (CB, done) Add common smearing at T0_SMEAR level (MM) Add cluster smearing in EMCSIMUADJ or other module (MM) Status: Above items need to be completed. Testing requires a few pb–1 f  p+p-p0 (CG) Can be done with output from production test? Cluster efficiency New parameters for cluster efficiency curves to be put into EMCSIMUADJ and tested (MP, TS) Status: Parameters exist, need to be inserted Would be nice to have for production test

MC work 4/9: Generators f  p+p-p0 generator FN has a new generator that uses the matrix-element approach. GEANFI interface not yet done, critical for testing. Need to add sQED FSR amplitudes. Status: Needs work, probably not needed for first production test Secondary generators KS  p+p-e+e- generator (CG) added (CB) with BR = 4.7 × 10–5 p0  e+e- decay generator added with BR = 6 × 10–6 (CB) p  en decay generator added with BR = 1.23 × 10–4 (CB) Status: Above items can be looked at in production test Probably require dedicated testing as well KS  p0e+e- generator (FB, VP) still needs to be interfaced

MC work 5/9: Nuclear interactions GEANFI nuclear interactions/regeneration code Original CASK0 code restored as CASK0C, except that regeneration is disabled (CB) CASK0B is called for interactions in calorimeter CASK0C is called elsewhere (e.g., DC walls and beam pipe, where regeneration is handled separately) Status: Testing requires several 10's of pb–1 Can probably be handled in production test Do we plan any work for charged kaons?

MC work 6/9: Trigger Comprehensive data-quality control for trigger Done up to run 36904 (MP, BS) Bad runs flagged and/or reconstructed files deleted (MM, BS) Other work on trigger Simulation of time smearing in high-jitter/bad RF period Adjustment of DC threshold simulation DISH maps Status: Nice to incorporate any/all of above in production test.

MC work 7/9: DC response DC tracking resolution: s-t relations Various volunteers: AA, PDS, MM, TS Status: No work on solution underway yet DC tracking resolution: multiple scattering off DC wires SK interested in working on this problem Status: Studies beginning, will not condition production test Correlated noise in DC for charged kaons Volunteers: EDL, PDS + charged kaon group Simulation of dE/dx response Status: VP has A_C module ready, can incorporate in test?

MC work 8/9: Background LSB insertion code Code exists, tested standalone (MM) Work on scripting to be done (MM) Status: Necessary for production test Fixes to CELE structure Need to add a new field to CELE structure with original CELE index into bank. Need to modify FILLCSPSMC_CEKA to use this index (MM) Status: Necessary for production test

MC work 9/9: Technical issues SQZ library Packing parameters different in GEANFI and KBK modules Certain MC truth values wrongly scaled or offset on re-reading MCEL energies (scale ×5) Particle TOF (e.g., K+) (offset +100 ns) Unclear why a problem (packing parameters stored in I-banks) Workaround module FIXIS exists (MM) Status: Necessary for production test

Items for production test: Reprise Status New IR geometry Ready EmC energy response ? EmC timing resolution adjustments Work New cluster efficiency parameters Nuclear interactions/regeneration New secondary decay generators LSB (background) insertion SQZ (compession) fix Cell/cluster index fix