UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Load Management System
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE.
Business Models and Scaling Up Successes Maintaining Interoperability By Open-Standards Design in The Power Distribution For Smarter Grid Khalid W. Darwish,
Supervisory Systems.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Real Time Systems Group 1 Date: 06\04\2005 Key No. C-DAC/RTSG/2005.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
NLDC 1 SCADA-Functions Author, Vineeta Agarwal Place PSTI, Bangalore Date
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.
SOUTHERN REGIONAL LOAD DESPATCH CENTER POWERGRID, BANGALORE Data Acquisition & Communication Abhimanyu Gartia Chief Manager,SCADA-IT SRLDC.
Load Despatching Facilities in India SLDC AP WRLDC NLDC Main NRLDC Sub LDC CSub LDC W VSAT Commn PG FO Comn Sub LDC V NLDC Backup SRLDCERLDCNERLDC SLDC.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
NORTHERN REGIONAL LOAD DISPATCH CENTER 12 th June 2004 Director DOE MD BPC Advisor DOE Royal Govt of Bhutan WELCOMES POWER GRID CORPORATION OF INDIA LTD.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1 st June 2004 Shri P. M. Sayeed Hon’ble Minister of Power Govt. of India WELCOMES POWER GRID CORPORATION OF INDIA.
WELCOME TO CIGRE MEMBERS
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
NERC Lessons Learned Summary LLs Published in September 2015.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
DEFINITION OF COMMUNICATION & DATA AQUSITION EXPERTISE SARVANI TELECOM.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
ENERGY CONSERVATION IN SR - A CASE STUDY
Phase Angle Limitations
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
ULDC SCHEME.
Automatización y control de sistemas de distribución
How SCADA Systems Work?.
Presented by: LADWP November 14, 2017
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Chapter 9 Internetworking
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Peter Erning, PSP-T11, Power Gen 2010
Overview Key diagram of 220 KV Sub station, Ablowal Cables
Module 4 Smart Grid Implementation Issues
DEC System Voltage Planning - June 2018
“RENEWABLE GENERATION PLANT COMMUNICATIONS”
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Solar Energy Commercialization
Presentation transcript:

UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION AN OVERVIEW

Unified Grid Operation National Level NLDC Regional Level ERLDC WRLDC NRLDC SRLDC NERLDC 5 Nos. State HQ Level 32 Nos. SLDC Group / Distt Level 51 Nos. SUB LDC Plant / Sub- Station Level 1160 Nos. RTU

Hierarchy of The ULDC Scheme in Southern Region DIRECTLY REPORTING 24 RTUs RLDC,Bangalore 14 RTUs SCC, Pondy CPCC 30 RTUs 87 RTUs 101 RTUs 64RTUs Hyderabad Kalamassery Chennai Bangalore Andhra Kerala Tamilnadu Karnataka Bangalore Hyderabad Kalam’erry Chennai Lingusugur Cuddapah Kannur Erode Warangal Trivandrum Madurai Hubli UNIFIEDUNIFIED Vijayawada

Karnataka Andhra Pradesh UT of Pondy Kerala Tamilnadu Information Flow to Control Centres Ramagundam Karnataka Warangal Satellite Ghanapur HYDERABAD Vijayawada Andhra Pradesh Hubli Davangeree MW Link Chinkampalli Bangalore FO Link State owneed Link CHENNAI Sub-LDC SLDC Pondy Kannur-B Erode RCLDC UT of Pondy Kerala KALAMASSERY Tamilnadu Madurai Vydyuthi Bhavanam

Communication Channel for Information flow RLDC Wide Band Commn SLDC SLDC Wide Band Commn (MW / FO) Sub-LDC Sub-LDC Wide Band / PLCC Commn RTU RTU RTU

EXISTING MICROWAVE LINK HINDUPUR EXISTING MICROWAVE LINK

COMPLEXITY OF MONITORING Annual Inter-Regional Integrated Opn of Ten Power Utilities Annual Inter-Regional Energy Transfer ≈10,000MU Generators –Hydro, Thermal,Gas/IPP 422 nos. 30,000 POINTS Active Power, Reactive Power, Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position, Isolator Position etc Transmission Network 400/220kV ≈ 40700 Ckm Installed Capacity ≈32800 MW Transformation Capacity ≈ 45000 MVA Transformers (220kV and above) 480 nos. Dynamic Grid Conditions

Scan Cycles All the analog data are scanned every 10/12 seconds Status information are reported by exception All status information are scanned for integrity check every 10 minutes The SOE datas are time stamped at 1 ms resolution Time synchronisation is done every 10 minutes

SRLDC ARCHITECTURE SLDC WORK STATION1 WORK STATION2 WORK STATION3 WORK STATION4 WORK STATION5 LAN 2 LAN 1 SLDC FEP1 FEP2 ROUTER 1 . ROUTER 2 . SCADA/ AGC SERVER DATA SERVER . BACKUP SERVER . EMS SERVER A EMS SERVER B BACK UP EMS . RAID

RSCC, BANGALORE CONTROL CENTRE WS01 WS02 WS03 WS04 WS05 WORK STATIONS DUAL LAN FRONT END PROCESSORS Switch WS06 WS07 DTS SYSTEM AP-07 AP-08 FEP-1 FEP-2 DTS SERVER DTS SERVER AP-03 BACKUP SERVER APPLICATION PROCESSOR RAID PNA:POWER NETWORK ANALYSIS COPS: COMPREHENSIVE OPERATION PLANNING AND SCHEDULING ICCP: INTER CONTROL CENTRE COMMUNICATION PROTOCOL RAID:- REDUNDANT ARRAY OF INDEPENDENT DISKS AP-01 AP-02 AP-04 AP-05 AP-06 SCADA AGC DATA SERVER PNA/ICCP SERVER COPS SERVER BACKUP SERVER

FUNCTIONS OF SCADA DATA ACQUISITION. PROCESSING OF ACQUIRED DATA. LIMIT / STATUS MONITORING & ALARMING. NETWORK STATUS PROCESSOR. SEQUENCE OF EVENT RECORDING. INFORMATION STORAGE & RETRIEVAL. DATA EXCHANGE SUPERVISORY CONTROL.

Energy Management Systems / (EMS) Supervisory Control And Data Acquisition Systems (SCADA) HIERARCHICAL LEVEL Regional LDC EMS/SCADA State LDC EMS/SCADA Sub-LDC SCADA Remote Terminal Units RTU RTU RTU RTU RTU

EMS FUNCTIONS PRE DISPATCH FUNCTIONS REAL TIME DISPATCH FUNCTIONS REAL TIME NETWORK ANALYSIS POST DISPATCH FUNCTIONS

THANK YOU

Implementation through – Unified Approach Achieved co-ordinated and phased implementation Established the facilities within same time frame Compatibility of equipment system Standardisation of Hardware and software with resulting economy in cost Optimisation of maintenance/spares of equipments

PRE-DISPATCH FUNCTIONS LOAD FORECASTING HYDRO-THERMAL COORDINATION HYDRO SCHEDULING UNIT COMMITMENT INTERCHANGE SCHEDULING INTERCHANGE TRANSACTION EVALUATION INFLOW FORECASTING CURRENT OPERATING PLAN

REAL TIME DISPATCH FUNCTIONS OPERATION MONITOR AUTOMATIC GENERATION CONTROL ECONOMIC DISPATCH RESERVE MONITOR LOAD SHEDDING SUPPORT PRODUCTION COST MONITORING

REAL-TIME NETWORK ANALYSIS FUNCTIONS NETWORK TOPOLOGY BUS-LOAD FORECAST STATE ESTIMATION EXTERNAL MODEL LOSS SENSITIVITY REAL-TIME CONTINGENCY ANALYSIS OPTIMUM POWER FLOW

POST-DISPATCH FUNCTIONS POST DISTURBANCE ANALYSIS --DISTURBANCE DATA COLLECTION --SEQUENCE OF EVENTS DATA