ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Instrumentation Summary: Instrumentation QBPMs, Magnet Movers and Remote Shift Participation Justin May SLAC.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Status of the ATF Damping Ring BPM Upgrade Project Manfred Wendt for the ATF DR BPM collaboration.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
May 31, 2005Third Mini-Workshop on Nano Project at ATF (M. Ross) Plans for nanometer cavity BPM studies Energy Spectrometer evaluation (Hildreth) Integration.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ILC Beam Instrumentation – Introduction Remarks –
Expected hardware status and Priority of the commissioning task
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
ILC-Americas Regional Team Review
ATF/ATF2 Control System
ILC LLRF Status Ruben Carcagno, Brian Chase
ATF2 Magnet Power Supplies
ATF2 Mover Software 15 December 2008
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Tracker Software Status
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LCLS Undulator System Status and Schedule
Undulator Cavity BPM System Status
LCLS Undulator System Status and Schedule
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2 Juan Cruz, Justin May, Doug McCormick, Steve Molloy, Janice Nelson, Tonee Smith, John Wray (SLAC) Peter Prieto (FNAL)

Project Overview ATF RingBPM ATF2 Magnet Movers ATF2 Cavity BPMs TTF HOM BPM NanoBPM Nov. 27, 2006

ATF RingBPM Project Motivation: Toward this goal, three trips in FY07 From A. Wolski: ILC GDE RDB S3: Damping Rings R&D Coordination, VERY HIGH PRIORITY R&D OBJECTIVE 2.1.4.3 Demonstrate < 2 pm vertical emittance To achieve this: Instrumentation and Control Improve BPM resolution Beam Dynamics and Low Emittance Tuning Toward this goal, three trips in FY07 Feb. ‘07 - test FNAL Echotek system June ‘07 (?) - Expand BPM system, start emittance tuning Later - More low emittance tuning Nov. 27, 2006

ATF RingBPM Echotek RingBPM upgrade From last talk: Preliminary upgrade of BPM analog hardware for 20 bpms Partial success with SPEAR Echotek system Demonstrated significant improvement in BPM resolution (order 10-100xs) Machine studies incomplete Insert correct number/ units Nov. 27, 2006

ATF RingBPM Project Interest in Ring BPM upgrade increasing Fermi lab commitment increasing: 7 people and system for running four Echotek modules (8 BPMs) Manfred Wendt, Charlie Briegel, Sharon Lackey, Dennis Nicklaus, Peter Prieto, Ron Rechenmacher, Duane Voy Success during this trip will pave the way for more FNAL Echotek support. Perhaps 30 modules for May/June trip In that case we must provide approximately 40 more BPMs worth of electronics and low level RF support Nov. 27, 2006

Hardware (FNAL) Instrument 8 ATF Button BPM’s using graychip-based (Echotek) DDC Boards A timing board that locks to 714MHz ring clock and generates 729.145MHz LO for downmix boxes. It generates DDC triggers, synchs to 2.16Mz ATF turn marker MVME 5500 processor running under VXWORKS 6.1 2 Linux boxes with their own hub Nov. 27, 2006

Software (FNAL) VXWORKS 6.1 operating system with EPICS IOC to control DDC boards and present records for channel access ATF Control System is already programmed to read BPM values from CA Engineering Page running under LabView in a LINUX box to serve as diagnostics and debugging tool This provides an essential debugging facility that was lacking in Feb. ‘06 Nov. 27, 2006

Calibration Run with existing calibration setup on 3 BPMs Measure performance of analog hardware with beam Test SLAC-designed calibration hardware: Nov. 27, 2006

Goals for Feb. ‘07 Demonstrate system stability Hopefully leave 8 BPMs with upgraded electronics and readout in ATF control system Measure noise improvement from grounding work Test Calibration System Perform limited BBA (on 8 BPMs) and beam studies to confirm system performance Nov. 27, 2006

ATF2 Nov. 27, 2006

ATF2 Mover progress 10 crates (20 movers) arrived at KEK 4 radioactive movers shipping today Movers will require about 2 more small crates to complete shipment Four mover setup should ship to France by Dec. 1 Nov. 27, 2006

ATF2 Magnet movers Installation: Install magnet movers with magnets on pedestals (E Cubed) Install electronics in racks (SLAC) Install and label all cables. Connect to chassis. (SLAC/E Cubed) Terminate tunnel end of cables with SLAC supplied connectors. (SLAC) Set movers to midrange. Zero pots and LVDTs. (SLAC) Check out the motion of the movers using local PC camac control or PC base LabView stepper motor control if required. (SLAC) Check out control system software for coordinated motion X, Y, Roll. Use dial gauges to check for correct motion. ( SLAC or E Cubed) Set movers back to mid range and perform magnet alignment. (E Cubed) Movers ready for beam Nov. 27, 2006

ATF2 Magnet Movers SLAC to provide all electronics to operate movers Movers require space for 17 chassis taking a total of 55 rack units plus one CAMAC crate with 15 empty slots Optimum layout will require three racks loaded something like this Magnet mover chassis m a g o v r Magnet mover chassis 15 slots required for camac crate: 2 magnet mover modules 2 ADC modules 11 LVDT modules Magnet mover chassis Magnet mover chassis Magnet mover chassis Camac crate Magnet mover chassis Resistor chassis Dc power supply Resistor chassis Resistor chassis Dc power supply Resistor chassis Resistor chassis Resistor chassis Resistor chassis Resistor chassis Resistor chassis Nov. 27, 2006

ATF2 mover installation manpower requirements Effort required to complete installation during 2 week trip in FY08 (4 people minimum) Install electronics in racks 1/2 day Install 162 mover and LVDT cables and label. 2 people 3 1/2 days Terminate tunnel end of cables 2 people for 3 1/2 days Check out mover motion and LVDT read back. 2 people 2 days Check out coordinated motion using ATF control software and dial gauges. Two groups of 2 people 3 days Nov. 27, 2006

QBPM Downmix Electronics 95% delivered or ready for shipping Current installation estimate is 4 people (FY08) for ~3 weeks Development of first-pulse operation scheme Nov. 27, 2006

Nov. 27, 2006

Goals for Dec. trip (11/29 - 12/20) ATF2 Meetings: Determine physical location of racks, penetrations, cable plants, etc. Discuss installation of quad/BPM test setup Run ATF2 electronics on BINP “NanoBPM” setup First pass at running calibration system on a Pohang BPM Contribute to NanoBPM run Incorporate NanoGrid data into resolution measurements Evaluate long-term stability of system resolution Install quad Mover/BPM test setup electronics and cable plant Nov. 27, 2006

TTF ongoing work Trip in Jan. ‘07 Run Narrowband system as single bunch BPM Integrate system with DOOCS Develop simple, fast calibration scheme Extend BPM running to multi-bunch operation Evaluate narrowband system as phase monitor Wideband HOM mapping of cavity Nov. 27, 2006

Summary ATF RingBPM ATF2 Movers ATF2 QBPMs NanoBPM (Dec. ‘06) TTF HOM Exciting plans for installation of new FNAL Echotek system in Feb. ATF2 Movers Hardware in transit ATF2 QBPMs Hardware soon to be in transit Setup work in Dec. ‘06 NanoBPM (Dec. ‘06) Long term stability tests nanoGrid integration TTF HOM Lots of measurements in Jan. ’07 Nov. 27, 2006