Z. Andelkovic, W. Geithner, F. Herfurth, M. Lestinsky, G. Vorobyev

Slides:



Advertisements
Similar presentations
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Advertisements

 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Alexander Aleksandrov Oak Ridge National Laboratory
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
ApEx needs for CeC PoP Experiment December 11, 2015.
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning experience of SNS Ring By M. Plum ICFA mini-workshop on beam commissioning.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
ESS Front End diagnostic
ELENA installation progress F. Butin / ELENA collaboration.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
BEAM COMMISSIONING SOFTWARE AND DATABASE FOR J-PARC LINAC Hiroyuki Sako G. Shen, H. Sakaki, H. Takahashi, H. Yoshikawa, JAEA H. Ikeda, VIC C. K. Allen,
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Report Technical Director Storage-Ring-Installation Completed
LCLS Commissioning & Operations High Level Software
Preparation Phase of the FAIR Project
Operations Machine Simulator.
Beam Commissioning Adam Bartnik.
Report Technical Director Storage-Ring-Installation Completed
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
ESR Slow highly charged ions and antiprotons
A monitoring system for the beam-based feedbacks in the LHC
Expected hardware status and Priority of the commissioning task
Beam diagnostics from GSI
Status of HESR 18th March Gießen Dieter Prasuhn.
J-PARC main ring lattice An overview
Testing of SC Magnets Status - November 2010
ELENA installation and commissioning status
Performance of BI systems at HIE-ISOLDE
Installations up to Start of Commissioning
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
The LHC - Status Is COLD Is almost fully commissioned
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-BI Software for LINAC4
The ELENA BPM System. Status and Plans.
LINAC 4 source & LEBT measurement results
Coupling Correction at the Australian Synchrotron
Beam instrumentation for HIE-ISOLDE
INTRODUCTION AND OVERVIEW. Operators training.
LCLS Commissioning & Operations High Level Software
Laboratory Directed Research and Development (LDRD) Proposal
Patrick ALEXANDRE, 27, from France.
Energy Calibration of the SPS with Proton and Lead Ion Beams
Overview LINAC BOOSTER STORAGE RING 100 Mev Commissioned in 2008
High Level applications development status
Linac Diagnostics Commissioning Experience
(Beam) Commissioning Plan
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
ThomX – Commissioning Meeting – 25/01/2018
Proposal for a CESR Damping Ring Test Facility
LEIR e-cooler operational experience and needs
Presentation transcript:

Z. Andelkovic, W. Geithner, F. Herfurth, M. Lestinsky, G. Vorobyev First Experiences with Cryring@ESR Commissioning – What went well, what could be improved. S. Fedotova, Z. Andelkovic, W. Geithner, F. Herfurth, M. Lestinsky, G. Vorobyev

CRYRING@ESR commissioning Injection septum&bumper RFQ 300 keV/nucleon Ion source H2+ Main objective- „First turn“ October 18th – November 18th, 2016

CRYRING@ESR commissioning First-turn systems to be controlled/monitored HV power supplies RF-cavity ion source electrostatic optics inj. bumper&septum RFQ Diagnostics Magnets´ power supplies Screens Faraday cups BPMs Phase probes Schottky dipoles quadrupoles steerers inj. septum excl. el.cooler sextupoles

Control system used for the first turn CRYRING machine experts Java Apps LSA Servers Middleware Settings Mng Devices FESA explorer FESA, C++ Timing system

Results ! First Turn ! Inj.bumper BPMs 1st pass YRT1DF7 YR11DF injected beam shape 1st pass ! First Turn ! YR11DF

What went well during the beam time Reached main objective, learned, gained experience. Quick support from expert groups. Diagnostics applications: CUPID, Cry-Cup, CRY-Phase-probe. Control system changes on the fly: Diagnostics (LOBI) Controls (CSCO) System design (PBSP) Power supplies (LOEP) improving of GUIs appearance and functionality setting up of local workspaces developing of a handy script for saved data fixing FESA classes

What would allow us to be more efficient Pulsed operations. Spare electrodes insert. Permanent status monitoring. Ion source uptime: ParamModi easy to use: Scan application: Transparent and flexible timing: Monitoring of devices. Stepwise values input. Go back to a previous value. Scanning physics parameters. Easy properties configuration. Saving of scan templates. Flexible settings. Application showing timing model and events.

ParamModi and Scan application

Flexible and transparent timing HW Application for timing: settings and monitoring. injected beam shape 1st Turn

Future CRYRING@ESR Milestones Bakeout system test E-cooler test CRYRING@ESR: stored ions beam cooling Test of first experiment Ready for ESR beam 2018 May ´17 end ´17 Mar ´17 Jan ´17

CRYRING@ESR says: Thank you! Engineering Facility Assembly Ring RF Controls GSI/FAIR Expert Groups UNILAC RF Beam Diagnostics Power Supplies. Mechanical Design/Integration Vacuum Magnets