Overview of Beryllium Applications in ITER and Role of IBMC

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Standard 6: Clinical Handover
First Wall Heat Loads Mike Ulrickson November 15, 2014.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Protection Against Occupational Exposure
BRC Food Safety Quality Management System Training Guide
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Introduction to Software Quality Assurance (SQA)
History of Responsible Care® in the Gulf Alan J. Izzard Borouge VP Corporate HSE/ VC RC Committee.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Prime Responsibility for Radiation Safety
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
W coating of CFC tiles for the JET new wall - Task Agreement: JW6-TA-EP2-ILC-05 Manufacturing and testing of W-coated CFC tiles for installation in JET.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Certificate IV in Project Management Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Intervention for Chronic and Emergency Exposure Situations Developing a National Capability for Response Emergency Response Plans Lecture IAEA Post Graduate.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
2013/14.  The Joint Project Board has published the arrangements for the joint teaching of the PCMD cohort of students.  This aims to safeguard the.
IAEA International Atomic Energy Agency Radiation protection of the public IAEA Regional Training Course on Radiation Protection of patients for Radiographers,
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Aviation Ground Handling Trailblazer Assessment Activity consultation Aviation ground operative Aviation ground specialist Aviation operations manager.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Plan on how to work safely with Beryllium
SESSION 3 Policy Framework
Preliminary Assessment Tribal Emergency Response Preparedness
Overview of Beryllium Applications in ITER and Role of IBMC
World Health Organization
Summary Session 1 – Introduction to the ITER Project
ISO/IEC
Workshop on Beryllium Applications and Health & Safety
Maintenance Scheduling
REGULATORY REQUIREMENTS FOR HANDLING RADIOISOTOPE Mohd Abd Wahab Yusof (Dr) Malaysian Nuclear Agency.
Meeting Scope and Organization
ITER BERYLLIUM WORKER STATUS
11 ii. Develop a plan for aDSM
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Overview – Guide to Developing Safety Improvement Plan
MAINTENANCE PLANNING AND SCHEDULING
Overview of Beryllium Applications in ITER and Role of IBMC
Quality Management Systems – Requirements
Overview – Guide to Developing Safety Improvement Plan
ICAO AFI Plan African ANSP Presented by: ESAF Regional Office
Beryllium Management Activities at ITER
Roadmap to COR.
Regulatory Cooperation Forum (RCF) - Plenary 2018
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Overview of Beryllium Applications in ITER and Role of IBMC A. René Raffray and Russell Eaton Workshop on Beryllium Applications and Health & Safety Aspects for ITER ITER Organization June 28, 2017 The views and opinions expressed herein do not necessarily reflect those of the ITER Organization

Outline ITER Background and Status Beryllium Components - First Wall Panels Other Beryllium Components Beryllium Management

ITER – Blanket First Wall Panels (Be)

ITER Blanket Louis Nicolas Vauquelin The Blanket directly faces the plasma and covers an area of about 620 m2. Up to 736 MW of power to be removed for the Blanket. Inlet cooling water conditions: 4 MPa, 70 C (3140 kg/s) Blanket designed to be replaced by Remote Handling tools “Quality Class 1” component; this means it has to be manufactured according to the highest quality standard The Blanket First Wall is armored with Beryllium Louis Nicolas Vauquelin (Discovered beryllium in 1798)

ITER Blanket System Main functions: ~850 – 1240 mm Blanket Module Exhaust the majority of the plasma power. Contribute in providing neutron shielding to superconducting coils. Provide limiting surfaces that define the plasma boundary during startup and shutdown. Provide passage for and accommodate interface requirements of the plasma diagnostics ~850 – 1240 mm Blanket Module ~1240 – 2000 mm Blanket connections Pads Shield Block First Wall panel Electrical straps Blanket Manifolds Flexible cartridges 100% 50% 50% 10% 40% 50% 100%

Heat Flux on the ITER Blanket System Space shuttle (re-entry) 500 kW/m2 Summer sunny day 1 kW/m2 Facing the plasma  High heat Fluxes ITER Blanket 5,000 kW/m2

Beryllium Armour for First Wall Plasma-facing material (PFM) shall address plasma compatibility, tritium retention, and heat removal capability Beryllium is considered as PFM for the ITER First Wall since the beginning of the ITER Engineering Design Activity phase in 1994 for the following main reasons: Oxygen gettering capability Low atomic number Absence of chemical sputtering High thermal conductivity Current design: - Thickness of tiles 8-10 mm, Various tile sizes (e.g. 12x12 mm, 25x25mm, 50x50mm) Total amount of beryllium: Net weight ~12 tons Blanket module Normal heat flux panels designed to 2 MW/m² Enhanced heat flux panels designed to 4.7 MW/m²

Selection of Beryllium Grades for the ITER First Wall Beryllium grades differ with regard to the impurity levels, grain size, methods of production and thermo-mechanical treatments. Materials shall have appropriate and sufficiently characterized properties for all the foreseeable operating conditions during the scheduled lifetime (taking into account changes of material properties during manufacturing cycle and during operation). Material compositions shall follow As Low As Reasonably Achievable (ALARA) requirements on radiation protection (maximum uranium content is 0.0030 wt.% to limit the impurity content of alpha emitter radionuclides) . Source: https://materion.com/Products/Beryllium.aspx

Beryllium Grades and Qualification Program A qualification program was established to characterize beryllium grades: Composition requirements (BeO, U impurity, etc.). Main physical and mechanical properties Thermal performance (thermal shock, fatigue, VDE) The following beryllium materials have been qualified for ITER application: S-65 Vacuum Hot Pressed (VHP) from Materion Brush (USA) DSHG-200 from the Russian Federation TGP-56FW from the Russian Federation CN-G01 from China These grades have been selected based on excellent thermal fatigue and thermal shock behaviour, high ductility, low impurity content, and an available comprehensive data base (including neutron irradiation effects). More detail in article in Physica Scripta T145 (2011)

Blanket First Wall First Wall Semi-Prototype completed in EU, RF and CN Domestic Agencies Enhanced Heat Flux Panel prior to testing Enhanced Heat Flux Panel, tested at: 4.7 MW/m2 for 7500 cycles 5.9 MW/m2 for 1500 cycles Normal Heat Flux Panel, tested at: 2 MW/m2 for 7500 cycles 2.5 MW/m2 for 1500 cycles

Other ITER Components Using Beryllium ICRH Blanket FW About 12,000 kg TBM 100 – 200 kg of beryllium pebbles used as n-multiplier Faraday Shields - 40 kg of beryllium Diagnostic Systems RF Windows

ITER – Be Management

Managing Beryllium Activities at ITER Beryllium is classified as a carcinogenic in France. Therefore, measures, systems and actions shall be implemented to control exposures of workers and prevent any exposure to operators and the public. Safety is a permanent priority in the ITER Program. In accordance with Article 14 of the ITER Agreement, the ITER Organization shall observe French Legislation and regulations as regards (amongst others) health and safety at work. The initial step in managing beryllium was the formation of the ITER Beryllium Management Committee (IBMC) in 2015. The IBMC comprises stakeholders from both IO-CT and Domestic Agencies Typically 2 main meetings are planned/held each year while other dedicated meetings are called on an as needed basis to address specific issues. Objectives of the IBMC Overall supervision of the applicable legislation and regulations Identification of all activities involving beryllium Identification of best practice safety standards Prepare Incident responses procedures for onsite and offsite activities. Implementation and coordination of the activities

Managing Beryllium Activities at ITER Activities in progress: Generation of the Document Breakdown Structure. Production of procedures. Production of ITER Beryllium Management Plan (Beryllium Code of Practice). Production of guidance for IO staff visiting beryllium facilities. Identification of beryllium components and production of lifecycle documentation. Implementation of beryllium worker and follow up process. Development and implementation of beryllium training program. Technical activities: Understanding of typical surface contamination levels Cleaning techniques for First Wall components Storage/packaging conditions for beryllium components Smearing and analysis of beryllium components Beryllium awareness - Introduction to working with beryllium

IBMC Document Breakdown Structure

IBMC Activities – 2017 Focus Main Activities pursued in the first half of 2017. Setting up the ITER Beryllium Worker Capture Process and Training Program Preparation of this Workshop on Beryllium Applications and Health & Safety

ITER Beryllium Worker Training Program (1) Training program prepared. First training program delivered by a combination of UKAEA and IO colleagues at CCFE for 4 IO staff members. Approach taken to training considering the beryllium risk Phase 1 Beryllium activities - Offsite manufacturing follow up of beryllium component and material suppliers. Phase 2 Beryllium activities - Onsite non activated beryllium. First delivery of beryllium to site and non-active operations. Phase 3 Beryllium activities - Onsite activated beryllium. Beryllium will be treated as a radiological material. The training program will need to be revised prior to each of the phases 2 & 3 to take into account the development of local operating procedures.

ITER Beryllium Worker Training Program (2) The training comprises: Session 1 – A presentation on aspects of beryllium safety, including Health and Safety, external site visits to beryllium suppliers and general good beryllium practices taken from other external operational facilities. Session 2 – Respiratory mask fit test. Session 3 - Personal Air Sampler (PAS) training. Session 4 - A short multiple question assessment to confirm the transfer of knowledge from trainer to trainee, and a means by which to assess the suitability of the training program. Session 5 – Simulate entry/exit operation into/from a beryllium area to demonstrate the practices required to enter/exit and operate in these areas safely. Session 6 – Incident Response: simulate rescue of a beryllium worker in a beryllium area. (will not be introduced until phase 2) To obtain the status of ITER Beryllium Worker, the IO staff must have passed the medical examination and successfully completed the training Four first Beryllium Workers certified at IO More details in M. Gilardi’s presentation

Beryllium Support Contract Contract placed with UKAEA, includes: Cleaning of Be mock ups To find a standard efficient cleaning method Storage activities To confirm the optimal storage conditions and validate no evolution of surface contamination for FW storage Support to IBMC (code of practice/training) Priority to prepare the Be training program for IO Provision of PAS for IO/DA/Suppliers use 10 units purchased, IO staff will use when making visits to beryllium facilities Can be available to support DAs activities Smearing/analysis activities Can be available to support DAs activities, provision of smears, analysis of smears by CCFE Be audit/information exchange. Support to develop and carry out beryllium training for IO staff.

Beryllium Information Exchange First opportunity was with SWIP (Oct 2016) IO can support (via UKAEA specialists) beryllium-related meetings with other FW providers suppliers if requested. More details in Wang Pinghuai’s presentation.

Summary ITER will have several beryllium components, and in particular the First Wall panels with ~12 tons of Be. The IBMC was created to manage the safety aspects of beryllium. Substantial progress has been achieved in the last year and a half in terms of documentation, training, safety culture, enhanced visibility in the project. We would like to take this opportunity to discuss with experts in the beryllium area and we welcome your feedback. However, much work still needs to be done and we need a beryllium specialist to help us tackle the many tasks ahead.

ITER Project Associate (IPA) for Beryllium Activities A beryllium specialist is required to support the IO for ongoing beryllium activities offsite and in readiness for delivery of beryllium components to site. Experience in occupational hygiene and in beryllium management needed: to directly support the ITER Beryllium Management Committee (IBMC) activities in developing a beryllium safety program and ensuring its ongoing effectiveness to deliver the safe working environment demanded by all stakeholders; and to support the follow up of PAs on beryllium components (and in particular on the Blanket First Wall). More details at: http://www.iter.org/jobs/IPA (Ref. IPA/2017/023/TED) The IPA position is for one year and renewable up to four years. Please let us know if you know a good candidate who fits the bill. The indicated application deadline is July 14, 2017 but the posting can be extended if a good candidate does not apply by then. You can contact me if you are interested in obtaining more information on this.

Rain or shine or lightning storm, ITER is moving forward!