S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.
Advertisements

2000, Independent Electricity Market Operator All Rights Reserved 1.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Sharing of ISTS Charges & Losses Regulation
Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Settlement system of Bilateral transactions under Open Access
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Billing, Collection and Disbursement Procedures
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Open Access and Trading. Trading “Trading" means purchase of electricity for resale thereof” Any person is allowed to undertake trading in electricity.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
Presentation Outline Indian Electricity Market
Bulk Power Transmission System
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
Open Access In Interstate Transmission system
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
ISO Comparison – CAISO Alex Lee (ERCOT)
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
11/27/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
12/7/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
Unit-Specific Bid Limits based on Modified Generic Cost.
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Settlement system for Collective Transactions (Power Exchange)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access Power Purchase
Interstate Transmission system
Wind Management at MISO
FERC Standard Market Design Working Papers
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Operationalizing One Nation One Grid
Open Access.
The New Texas Wholesale/Retail Market
Scheduling of Collective Transactions Through Power Exchange
“ Open access / Power Exchange Regulations/experiences of SR ”
Congestion regulations
IN INTER-STATE TRANSMISSION
E-bidding for Short Term Open Access by – S
Settlement system under Open Access
Ahmad Elberry, Abdelghani Aljayyousi
OPEN ACCES IN INTER-STATE TRANSMISSION.
Presentation transcript:

Open Access

Open Access in ISTS: CERC OA Regulations 2008 Collective transactions : Both Buyers and Sellers of to bear transmission charges and absorb transmission losses Inter-Regional links -No Separate treatment. Emphasis on “Scheduling” rather than “Reservation” SLDC consent mandated along with application In case of Congestion for Advance Reservation, e-Bidding without Price Cap Exit Option provided with payment of up to 2 days open access charges.

- First Come First Serve - Day ahead - Contingency Open Access in ISTS CERC OA Regulations 2008 Products – Short term Access - Advance - First Come First Serve - Day ahead - Contingency

Deadline for issue of approval by Nodal RLDC Time lines for various Categories of Applications Sl. No. Type of Application Deadline for applying OA required for * Deadline for issue of approval by Nodal RLDC 1 Advance Application 10 days prior to close of Month-1 M2 25th of M1 5days close of Month-1 M3 Last day of M1 Last day of Month-1 M4 5th of M2 2 First Come First Serve FCFS for the same month M1 3 days before start of transaction FCFS 4 days before commencement 28th of M1 3 Day Ahead Day Ahead (Day-1 or 1500 hrs. of Day-3) D4 On D3After receipt of Power Exchange schedules for D-4 4 Contingency After 15hrs on Day-3 or 1.5 hours before start of OA Within 6 blocks before start of OA * M-1 : Month-1 (Current month), M-2- Next month and so on, D-1 Day-1 and so on

Time Line for Advance, FCFS, DA and Contingency Applications 1500hrs 1.5hrs 20 25 5 Deadline for submission of DA Applications for transactions on D0 Processing time for RLDCs Last Day for submission of Applications for transactions in M2, M3, M4 Deadline for submission of Contingency Applications for transactions during D0

Processing of Advance Applications for next 3 months 10/5/1 day (17.30hrs) prior in a month for 2nd/3rd/4th month Dead Line for Receipt of Application Request for Consent from other RLDCs Next Day to due date(12.00hrs) Issue of Consent by RLDC SAME DAY 20.00HRS Next day 12.00hrs Request Applicant for a revised Tr. Cap. Next day 12.00hrs WITHIN 5 DAYS No Check for any Tr. Congestion ? Yes Approval Still Tr. Congestion ? Next day 11.00hrs No Revised MW/Duration by Applicant Yes E-bidding 4th day after due date 3 working days after issue. Commence- ment of Tx. Approval Payment of STOA ch. WITHIN 5 DAYS

Processing of FCFS Applications for next month 5/4 day (17.30hrs) prior in a month for Dead Line for Receipt of Application Request for Consent from other RLDCs Next Day to due date(12.00hrs) Issue of Consent by RLDC SAME DAY 20.00HRS Next day 12.00hrs Approve Applcations received in a day on pro-rata Yes No Check margin is there ? WITHIN 5 DAYS No Any margin left ? Yes 4th day after due date 3 working days after issue. Commence- ment of Tx. Approve Applications Received in next day on pro-rata Payment of STOA ch.

REVISON OF SCHEDULE Only in case of “Advance Scheduling” or “First-Cum-First Served basis” minimum five (2) days notice (5days in 2008 Regn) Transmission Charges and Operating Charges for 2 days (5days in 2008 Regn) Margin Available – could be utilized for scheduling of other Open Access Transactions

CURTAILMENT IN CASE OF TRANSMISSION CONSTRAINTS Allocation/Reallocation of ISGS power Transmission constraint or to maintain grid security curtailed in the manner, which in the opinion of RLDC, would relieve transmission constraints/ enhance grid security Open Access Bilateral Transactions would generally be curtailed first followed by the Collective Transactions Rerouting allowed without curtailment refund of Transmission Charges for unused capacity

COMMERCIAL CONDITIONS All Payment related to Open Access ST Charges by Applicant to the Nodal RLDC within three working days from the date of acceptance Energy charges to be settled among the parties Losses adjusted in kind Application Fees (as per Para 7 of Regulation) non-refundable fee of Rupees five thousand (Rs.5000/-) only Transmission charges (Para 16 of Regulation) Intra-region (Rs.80/MWh) Adjacent Region (Rs. 160/MWh) Wheeling (Rs.240/MWh) STU charges – as specified by respective SERCs or Rs. 80/MWh Operating charges (as per Para 17 of Regulation) Rs. 2000/- per day each RLDCs/SLDCs involved

DISBURSAL OF PAYMENT Disburse the Open Access Charges 10th day of the next month Transmission Charges and Operating Charges – for State System Concerned STUs/SLDCs Refund due to curtailment 15th day of the next month Reconcile the Open Access Charges

OA laid Foundation for Market development STOA – SUCCESS STORY Developed in consultation with all stakeholders Applications Processed (Since Beginning) > 60,000 No. Volume (Approved Energy) (Since Beginning) > 190BUs Applications Approved > 95 % Refusal/Non-consent by SLDCs > 3 - 4 % Refusal due to system constraints < 0.5 % OA laid Foundation for Market development 12

Full utilisation of IR links for STOA STOA – SUCCESS STORY Robust Financial Settlement System Near Dispute free implementation Logistics/infrastructure -In-house Confidence Building & Dissemination of knowledge Full utilisation of IR links for STOA 13

ST charges under OA w.e.f 01.04.11, ST charges as per Point of Connection charge Both seller and buyer to bear losses in kind as per the applicable Zonal losses

Thank you