Principal Investigator ESTCP Selection Meeting

Slides:



Advertisements
Similar presentations
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
(Insert Title of Project Here) Kickoff Meeting (Month Date, Year)
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Project Proposal Project ? Project Sponsor Project Manager Version
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Presented By: Thelma Ameyaw Security Management TEL2813 4/18/2008Thelma Ameyaw TEL2813.
What is a project? Project Management Institute definition
Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC) [Insert Project Name] Project Baseline Review (PBR) [Insert Date of PBR] 1.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
1 Framework Programme 7 Guide for Applicants
Literature Review and Parts of Proposal
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Research & Technology Implementation TxDOT RTI OFFICE.
Version, Date, POC Name 1 Purpose: Concisely state the scientific objective of the proposed basic research proposal. Product/Results: Identify the research.
NATIONAL INSTITUTES OF HEALTH CHALLENGE GRANT APPLICATIONS Dan Hoyt Survey, Statistics, and Psychometrics(SSP) Core Facility March 11, 2009.
Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Atlantic Innovation Fund Round VIII February 5, 2008.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
The Project Plan Plan Your Work, then Work Your Plan
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
A research proposal is a document written for the purpose of obtaining funding for a research project.
Objective: Develop hybrid biological semiconductors which are EMP resistant and whose electronic properties can be directly manipulated by environmental.
Stages of Research and Development
ITEC 275 Computer Networks – Switching, Routing, and WANs
Principal Investigator ESTCP Selection Meeting
Title of Project Lead Institution
CMGT 410 aid Education Begins/cmgt410aid.com
Chapter 3 Managing the Information Systems Project
Module 8: Effective Innovation Review and Selection Process
Managing the Project Lifecycle
Systems Analysis and Design in a Changing World, 4th Edition
CON 280: Source Selection and the Administration of Service Contracts
Software Configuration Management
Project Management Lifecycle Phases
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Chapter 3 Managing the Information Systems Project
STEP 7 - EXECUTION PHASE: MONITORING & CONTROLING
Name of Small Business location
Successful IT Projects By Darren Dalcher & Lindsey Brodie
Chapter 3 Managing the Information Systems Project
Project Management Process Groups
Recommendations for using this ‘framework’ template
Helene Skikos DG Education and Culture
Good practice in preparing an application
Natural Gas Innovation Fund Investment Intake Template Project Title Submitted By *Note: This template is intended as a guide on content; you may.
BUFFALO FUND: ACCELERATOR Full Proposal Presentation
Principal Investigator ESTCP Selection Meeting
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
SDTC Application For Funding
Executive Project Kickoff
Project Kick-off <Customer Name> <Project Name>
Chapter 3 Managing the Information Systems Project
Principal Investigator ESTCP Selection Meeting
Chapter 2 Managing the Information Systems Project
Natural Gas Innovation Fund Investment Intake Template
Radiopharmaceutical Production
(Insert Title of Project Here) Kickoff Meeting
M & E Plans and Frameworks
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

Principal Investigator ESTCP Selection Meeting TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE

Project Team List the PI and co-performer(s) names and organization(s). If you are executing your project with no co-performers, this slide is not required. 1 slide NOTE: This template provides recommendations as to the number of slides needed for each section of the brief. Regardless of the number of slides you ultimately use, plan that your brief will be no more than 30 minutes uninterrupted (not including your backup slides).

Problem Statement Clearly state the environmental problem the technology or methodology demonstration is addressing and its relevance and importance to DoD. Identify the current approach (if one exists) to this problem and its shortcomings. 1 slide

Technical Objectives Briefly describe the technical objective(s) of your demonstration project overall. 1 slide

Technology/Methodology Description Describe the technology or methodology in sufficient detail to provide an accurate and factual understanding of its theory, functionality, and operation. As appropriate, provide an overall schematic or flow diagram. Discuss how the technology or methodology is innovative. 2-3 slides

Technology/Methodology Maturity Provide evidence that the technology or methodology is mature enough for demonstration (include references and past funding history). Provide a brief description of any previous related demonstrations. Summarize data and studies justifying the expected performance. Discuss any additional development, design, field, or laboratory work that is required prior to demonstration. 2-3 slides

Technical Approach Provide a detailed overview of how the project will be conducted to address the technical objectives. Include a brief description of the proposed demonstration site(s), if known. If the site has not yet been selected, discuss required site characteristics for an optimal demonstration. Provide the performance objectives. Provide a broad overview of the test design. Discuss the scope of proposed demonstration and relate the planned data collection to the performance objectives. Include a description of the data analyses that will be conducted to determine whether the success criteria for the performance objectives have been met. 5-10 slides This section should be the focus of the presentation. Additional descriptors are included in the full proposal instructions for all sections.

Technical Risks Identify potential issues of concern and technical risks in taking the technology or methodology from the research phase to proposed scale of demonstration. Identify any assumptions that have been made that, if not realized, could impact the successful implementation of the project. Discuss how risks will be managed. If the demonstration is not at full scale, discuss any scale-up issues that will remain at the conclusion of a successful demonstration. 1 slide

Related Efforts Provide information on any relationship to other similar projects. Identify funding sources for these efforts. 1 slide

Expected DoD Benefit Describe the expected benefit in terms of environmental impact and/or reduced cost, as applicable. Assess the environmental benefit per site or implementation and the expected aggregate benefit for DoD. Provide realistic projections of the number of DoD sites or facilities where the technology or methodology can be deployed. Discuss how the information obtained from the demonstration will enable adoption of the technology or methodology throughout DoD. Estimate the expected return on investment (cost of implementation versus savings) and the time for payback. Discuss the life cycle cost and advantages over current approaches, if one exists. 1-2 slides

Schedule of Milestones Provide a project schedule with expected milestones and deliverables for the duration of the project in the form of a Gantt chart (example below). Ensure all required ESTCP deliverables are included, in accordance with the full proposal instructions. Tasks Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 1. Title 2. Title 3. Title 4. Title 5. Reporting * FR DP C&P DP – Demonstration Plan FR – Final Report C&P – Cost & Performance Report * Identify any decisions points.

Schedule of Milestones (continued) Explicitly identify any development, design, baseline characterization, field, laboratory, or treatability work that is required prior to demonstration. Estimate the time required for the demonstration. Include the planned initiation and completion dates for critical events, including but not limited to equipment installation, monitoring, fieldwork, data analysis, and other key activities as appropriate. Include expected submission dates to the ESTCP Office for the first draft and completed final document for Demonstration Plans and Final Reports. Cost and Performance Reports are due when the final version of the Final Report is submitted. Separate first draft and final submission dates by a two-month period to allow time for ESTCP review.

Technology Transition Describe the method by which the technology or methodology will be transitioned to end user(s) or commercialized. Specify how technology transfer methods will differ to reach appropriate audiences (i.e., regulators, consultants, etc.). Describe any proposed guidance documents that will assist in future implementation (i.e., guidance, design, and/or protocol documents). Explicitly identify potential first DoD users and follow-on implementation. Identify any DoD or service programs that are responsible for technology or methodology implementation or relevant requirements or regulations that will effect transition. If there are known institutional or regulatory barriers that will affect the transition, describe them in this section along with recommendations for addressing these barriers. 1-2 slides

Cost Estimate Provide a table that summarizes the requested ESTCP funds by performer by fiscal year. Cost should be listed in thousands of dollars ($K) and rounded to the nearest thousand. Performer FY18 ($K) FY19 ($K) FY20 ($K) Performer 1 75 100 Performer 2 Performer 3 50 Total 225 250 Grand Total 700

Project Leveraged Funding Provide a table that delineates all leveraged funding for the project for each fiscal year. This should include direct funding support and in-kind support. If a performer is providing support (for example, XYZ Co. is receiving ESTCP funds but also providing in-kind support), then that should be indicated. Performer FY18 ($K) FY19 ($K) FY20 ($K) Funding Source 1* 25 50 Funding Source 2* 75 65 Performer 3** 30 Total 130 145 Grand Total 420 * Direct Funding Support ** In-Kind Support

Backup Slides

ESTCP Review Comments Provide a summary of the ESTCP review comments and responses. Include any other support material.