LHeC Linac Configurations

Slides:



Advertisements
Similar presentations
Linac-LHC ep Collider Options F. Zimmermann, F. Bordry, H.-H. Braun, O.S. Bruning, H. Burkhardt, A. de Roeck, R. Garoby, T. Linnecar, K.-H. Mess, J. Osborne,
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Ring-Linac LHeC Frank Zimmermann, CERN, BE-ABPContributors: F. Bordry, H.-H. Braun, O.S. Brüning, H. Burkhardt, A. Eide, A. de Roeck, R. Garoby, B. Holzer,
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
LHeC : Linac-Ring Option Hans-H. Braun / CERN  General consideration  Proton ring issues  70 GeV  140 GeV  Polarisation and Positrons  Comparison.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
The Large Hadron electron Collider (LHeC) at the LHC F. Zimmermann, F. Bordry, H.-H. Braun, O.S. Brüning, H. Burkhardt, A. Eide, A. de Roeck, R. Garoby,
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
Brain Gestorme: Status of the LHeC Ring-Ring / Linac- Ring Basic Parameters I appologise to talk about things you already know...
LHeC Workshop Chavanne-de-Bogis, 20/21 January 2014 Herwig Schopper.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
Proposed machine parameters Andrei Seryi July 23, 2010.
Future Accelerators at the High Energy Frontier
Optimizing Cost and Minimizing Energy Loss for Race-Track LHeC Design Jake Skrabacz University of Notre Dame Univ. of Michigan CERN REU 2008 CERN AB-department.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Road beyond Standard Model At the energy frontier through synergy of hadron - hadron colliders (LHC, (V)HE-LHC?) lepton - hadron colliders (LHeC ??) lepton.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
Frank Zimmermann, CLIC “Away Day” 28 March 2006  x * Limitations and Improvements Paths Damping Rings Maxim Korostelev, Frank Zimmermann.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
Page 1 An lepton energy-recovery-linac scalable to TeV Vladimir N. Litvinenko Stony Brook University, Stony Brook, NY, USA Brookhaven National Laboratory,
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
2015 LHeC Coordination Group meeting 2 nd October 2015 Oliver Brüning, CERN1 ERL Demonstrator for LHeC: Critical issues -Choice of multi-turn ERL configuration.
Summary of the Accelerator Working Group 1st ECFA LHeC Workshop; 1-3 September 2008, Divonne 1 First discussions started at CERN at the end of last year.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz EIC14 Workshop, Jefferson Lab, March 20,
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
J. Osborne LHeC Linac-Ring Option Frank Zimmermann EucARD-AccNet-RFTech Workshop PSI, 2 December 2010.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 LHeC Workshop, Chavennes-de-Bogis, June 26, 2015 LHeC.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Photon-Photon Colliders ( Photon-Photon Colliders (  C) Mayda M. Velasco.
Open discussion for physics motivation, future designs, and possible paths for  colliders Mayda M. Velasco LCWS 2012 Oct. 25, 2012.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
Note presentation: Performance limitations of circular colliders: head-on collisions M. Koratzinos TLEP ACC meeting no. 8, 25/8/2014.
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
J. Osborne LHeC Linac Design Issues Frank Zimmermann 10 December 2010.
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
LHeC Sources Rinolfi CERN Thanks to:
ILC Power and Cooling VM Workshop
LHeC Linac-Ring Option
Civil Engineering for FCC-eh and LHeC
CLIC Civil Engineering Update
ILC - Upgrades Nick Walker – 100th meeting
CLIC Rebaselining at 380 GeV and Staging Considerations
CLIC Klystron-based Design
CLIC Civil Engineering Update
High Gradient Cavities: Cost and Operational Considerations
Update of CLIC accelerating structure design
Top-Up Injection for PEP-II and Applications to a Higgs Factory
An lepton energy-recovery-linac scalable to TeV Vladimir N
Cost Optimization Models for SRF Linacs
BDS civil construction Single IR upgrade scenarios discussion
CW Energy Recovery Linac for Next Generation of XFELs
MEIC Cost Estimate Overview
NLC 2001 Beam Delivery Layout
Barry Barish Paris ICHEP 24-July-10
CEPC Partial Double Ring Parameter Update
ERL Director’s Review Main Linac
Presentation transcript:

LHeC Linac Configurations Frank Zimmermann, CERN, BE-ABP Contributors: O. Brüning, Y.-P. Sun, F. Zimmermann, CERN, Geneva, Switzerland; A. Eide, LPNHE Paris, France; S. Chattopadhyay, J. Dainton, Cockcroft Inst., Warrington; M. Klein, U.Liverpool, United Kingdom; J. Skrabacz, U. Notre Dame, U.S.A.; V. Litvinenko, BNL, New York, U.S.A.; C. Adolphsen, SLAC, U.S.A. 2nd LHeC Design Meeting CERN, 16 February 2010       

3 post-Divonne options “least expensive” defined in a “5 experts” discussion on 16 October 2009: Max Klein, Chris Adolphsen, Oliver Brüning, John Osborne, Frank Zimmermann “least expensive”  60 GeV pulsed, 1.5 km long linac, arc radius 100-160 m with dogbone (3%-5% energy loss at 30 GeV), 31.5 MV/m, 4 access shafts; note that dogbone doubles the radius for the same energy loss!   “high luminosity” 60 GeV cw, 4 km long linac, arc radius 640 m (3% energy loss at 60 GeV), 13 MV/m, 6 access shafts “high energy”  140 GeV pulsed, 4 km long linac, arc radius 1000 m (3% energy loss at 70 GeV), 31.5 MV/m, 6 access shafts

tunnel circumference ~ 3 km ~100 m 1.5 km ~650 m 4.0 km tunnel circumference ~ 12-14 km ~1000 m tunnel circumference ~ 14 km ~4.0 km

example parameters Example LHeC-RR and RL parameters. Numbers for LHeC-RL high-luminosity option marked by `†' assume energy recovery with hER=90%; those with `‡’ refer to hER=0%.ILC and XFEL numbers are included for comparison. Note that optimization of the RR luminosity for different LHC beam assumptions leads to similar luminosity values of about 1033cm-2s-1 F.Z., PAC2009 & Divonne ‘09

(alternative) layouts from Chris Adolphsen, October 2009

from Chris Adolphsen’s excel file detailed parameters list

Some questions or comments (sent to Chris only last Saturday) The original plan was to keep the wall plug power constant equal to 100 MW. Chris’ option #3 cannot have the same wall plug power as option #1. Could he/we easily update the numbers and derive the luminosity expected, for each of the 3 cases, at 100 MW w-p power? (2) Which of the three configurations do the cost and power estimates of the file refer to ? Since ERL is mentioned, I assume it is for option #2. Estimated cost and power for all three scenarios? (3) Why do we need to have six access shafts for options #2 and #3? Why could we not just have two shafts, one on either side of the linac? For the LHC, the cryoplants are separated by 3-4 km. Which part is the bottleneck? (4) If the total fill factor for XFEL and ILC, computed over the full length of the linac, is much lower than the fill factor per optical cell, this must presumably be due to spare cavities and/or cells which do not accommodate cavities. Is there a recipe or guiding principle for the reason(s) and the magnitude of this reduction of the fill factor? (5) Which energy recovery efficiency has been assumed for scenario #2? (6) Should there perhaps a factor of "2 pi" instead of "4" for some of the length estimates in the excel file? (7) Consistency of arc radius definition? [2.1, 3.0 and 2.2% loss of E_max?]

synergy with Higgs factory? model: Higgs physics with a gamma gamma collider based on CLIC-1 -“CLICHÉ” D. Asner, H. Burkhardt, A. De Roeck, John R. Ellis, J. Gronberg, S. Heinemeyer, M. Schmitt, D. Schulte, M. Velasco, F. Zimmermann, Eur.Phys.J.C28:27-44,2003 gg Higgs factory based on two LHeC cw ERLs laser g

CLICHE LHeC CW ditto ditto ditto cw 4x1016/s (hER~0.9) [7 mA ] 7x1014/s ~300 mm ~5 mm ~0.5 mm ditto

summary work in progress parameters of 3 linac configurations to be further discussed with Chris + input from CERN cryo & RF experts for infrastructure requirements(?) goal: improved understanding & parameter convergence Higgs factory with ~1034 cm-2s-1 luminosity based on two LHeC cw ERLs