MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
E. Todesco HL LHC LAYOUT FROM Interaction POINT TO SEPARATION DIPOLE E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
DOE Review, 7/15/2010GianLuca SabbiMagnet Systems - Progress and Plans Magnet Systems Summary Progress and Plans GianLuca Sabbi DOE Review of the LHC Accelerator.
Closing Session Report
CERN, 11th November 2011 Hi-lumi meeting
P. Ferracin on behalf of the MQXF collaboration
Plans towards CC in the LHC a US – centric perspective
SLHC –PP WP6 LHC IR Upgrade - Phase I.
11 T Dipole Integration & Plans M. Karppinen
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Nb3Sn IR Quadrupole Program
Optimization of Triplet Field Quality in Collision
Discussion session on day 1
MQXF Short Models Status and Plans
P. Ferracin and G. Ambrosio
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Paolo Ferracin, Giorgio Ambrosio
Large aperture IR Quadrupole (MQXF) development plan
New Magnets for the IR How far are we from the HL-LHC Target?
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
QXF schedule and milestones
EIC Accelerator Collaboration Meeting
Presentation transcript:

MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL Joseph Rasson, GianLuca Sabbi - LBNL

DOE Guidance on Project Planning Assume successful completion of the technology demonstration by LARP, according to agreed upon plans Focus on the next phase: development of final Quad design, short model and prototype Separate prototyping phase from construction: Prototype to be developed through LARP, with some organizational adjustments as needed and strong CERN involvement/contributions Construction project to be initiated at a later time, when HL-LHC specs are defined, technology demonstration is completed, and some proof of the final design is available Develop a credible plan (technical, schedule, resources, US/CERN responsibilities) compatible with installation during LS3

Project Planning Core group with members from US Labs and CERN CERN Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi BNL Mike Anerella, Peter Wanderer FNAL Giorgio Ambrosio, Mark Kaducak LBNL Joseph Rasson, GianLuca Sabbi Open meetings and documents posted on LARP server https://plone.uslarp.org/MagnetRD/TDWG/ Activities: Analyzed four cases (two apertures and half or full-length coils): Assess feasibility, critical milestones Contributions from US and CERN Conditions and preparations for realistic backup options

Choice of half-length vs. full length coils Test of a pre-series prototype of the IR Quad will be 2017-18: Need to define all interfaces, but HL-LHC TDR is in 2015-16 CERN resources are focused on LS1 in 2013-14 US resources are focused on technology demonstration in 2013-14 To install in 2022, significant commitments needed before prototype test For a factor of 2 length increase from LQ/LHQ, risk is too high A fall back option would require running a second option in parallel, but the schedule is already resource limited A simplified “fast track” 8 m model was considered but discarded For a new aperture, a short model program is needed For L > 4 m, new infrastructure is needed In the half-length coil scenario, we can confidently move forward based on 120mm aperture LHQ and 150 mm aperture short model

Implications of half vs. full-length coils Loss in performance (integrated gradient for given nominal gradient) Depends on the details of the design, range may be 5-15% Impact from a loss of effective length of ~50 cm seems acceptable Shorter units provide technical opportunities in several areas Materials cost are similar and in some case may be lower, but labor cost increases due to the higher number of coils Production schedule is kept the same by increasing the number of lines – several sets of 4 m infrastructure are already available Detailed analysis needed to estimate actual difference in cost How effort scales with length of coil: look at individual elements Larger production sample is intrinsically more robust and can be exploited in many ways: number of spares, sorting etc. Hybrid scenario with Q1/Q3 as half-length, Q2 as full length?

Short Model Development Plans Discussion focus #1: CERN and US contributions: Common tasks: conceptual design, magnet assembly and test LARP tasks: cable design/fabrication, structure fabrication CERN tasks: coil tooling and fabrication Discussion focus #2: time to first test First HQ was tested ~21 months after “phase 1” aperture decision Several performance issues – may or may not be related Our current schedule shows ~36 months (5/2012 to 5/2015) Reflects limited resource availability in 2012-14 Integration of CERN and LARP collaboration Establish organization, communication lines Address limited overlap of work schedules Fully incorporate HQ/LHQ experience

IR Quadrupole Development Plan