Facility Concept Design and Study

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

The Advanced Technology Solar Telescope The ATST Project is funded by the National Science Foundation through the National Solar Observatory which is operated.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
BAYSIDE UNIVERSITY OF MASSACHUSETTS BOSTON MAIN CAMPUS UNIVERSITY OF MASSACHUSETTS BOSTON 1 Administration & Finance Facilities Department FY13 Budget.
31 October 2006 M. De La Peña Software Cross-Training Session LBT TCS - ECS 1 Enclosure Control System (ECS) Michele De La Peña.
Express Team University of New Mexico February 24, 2006.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
A Few Ways of Acquiring Telescope Time Telescope Committee Astronomical Society of New York October 23, 2009 Peter Wehinger Steward Observatory University.
Cornell Caltech Atacama Telescope Project Status Simon Radford 2005 October 10.
M. Karl Wood Mike Hightower New Mexico Water Sandia National Resources Research Laboratory Institute The New Tularosa National Desalination Research Facility:
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Observational Astronomy. Astronomy Primary Goal: Understanding the nature of the universe and its constituents Means: Equipment building, research, teaching.
2001 Winter Presentation. Site Location Site View.
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
December 2007Chile Observatories Earthquake Preparedness Workshop1 Atacama Large Millimeter/submillimeter Array ALMA Eduardo Donoso.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
North Pocono High School
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Structural Engineering and Earthquake Simulation Laboratory Experimental and Micromechanical Computational Study of Pile Foundations Subjected to Liquefaction-Induced.
{ Telescopes Jon Holtzman NMSU Astronomy.  Telescopes are light buckets: bigger buckets collect more light, and faint (far away) objects don’t produce.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Telescope Integration and Tests Tuesday Afternoon.
LMS11/26/01NIO Workshop on Wind Modeling Welcome and Introduction Larry Stepp.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
Recent status of the NANTEN2 and Nagoya project Hiroaki Yamamoto NANTEN2 project, Nagoya University NANTEN2 Adelaide Image: Pampa.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review CCAT Enclosure Nathan Loewen AMEC Dynamic Structures Ltd. 13 July 2005.
A Tour of the Largest Ground-Based Telescopes Being Developed
City of San Mateo 2016 Reach Code
Technical resources schedule
Energy Huntsville Opportunity Report August 2016
The GMT Project The Giant Magellan Telescope (GMT)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Alternative Dome Enclosure concept Maunakea Spectroscopic Explorer
Electronics and Controls
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
CBETA Technical Review
NUMERICAL SIMULATIONS OF AIRFLOW THROUGH 8m ENCLOSURES
Weather Data Summary.
1.3-GHz Cavity Vacuum Furnace at IB4
San Luis Potosi – New plant April 24th 2015
(Refer to Chapter 2 of the textbook)
Composite Mirror Applications, Inc
Operations Concept Simon Radford and Operations Committee
Integration & Commissioning
Fiscal Year 2017 Final Budget Workshop
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
CF Organization & Schedule
Atacama Large Millimeter Array
Building Construction
Meteo 003 Lab 3 Due Friday September 16th
Minuteman Vocational Technical Regional High School Progress
On-Site Facilities for Pre-production deployment
CF Scope, Management & Organization
OCP Engineering Workshop Hosted by Flex
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

Facility Concept Design and Study M3 Engineering & Technology Corporation Simon Radford, CCAT Deputy Project Manager José Terán U., M3 Architect M3PN05068 13,14 July 2005 Feasibility/Concept Study Mid Term Status Review

Presentation Summary M3 Engineering & Technology Corp. Scope of Work Mountain and Support Facility Requirements Observatory Concept: (Work in Progress) Support Facility Concept: (Work in Progress) Interface Requirements Schedule M3 Engineering & Technology Corporation

M3 Engineering & Technology Corp. Full Discipline Architectural and Engineering Firm Offices in Arizona, Mexico and Chile Specialize in Observatory Enclosures and Support Facilities Over 15 Years Experience in Telescope Observatory Design and Construction Projects in Arizona, California, Hawaii, New Mexico, Texas and Chile Design Experience of All Observatory Sizes and Dome Configurations M3 Engineering & Technology Corporation

Observatory Experience: Mount Graham International Observatory Location: Mount Graham, AZ Vatican Enclosure SMT Enclosure LBT Enclosure Site Infrastructure and Access Road M3 Engineering & Technology Corporation

Observatory Experience: Chile Magellan Observatories, Las Campánas SOAR Enclosure, Cerro Pachón GEMINI Support Facility, Cerro Pachón 2MASS, Cerro Tololo M3 Engineering & Technology Corporation

Current Observatory Projects ALMA AOS Site Infrastructure and Technical Support Facility, Chajnantor, Chile Discovery Channel Telescope Observatory, Happy Jack, Arizona SST Enclosure, White Sands Missile Range, New Mexico Mew Mexico Tech Interferometer Array, Magdalena Ridge, N.M. GMT Enclosure Concept Design and Cost Study ATST Enclosure Study, Haleakala Hawaii Tzec Maun Telescope Enclosure (RGT), Cloudcroft N.M. HOPE Observatory (RGT), Caribbean Islands M3 Engineering & Technology Corporation

Scope of Work Concept Design Study and Budget Estimate Mountain Facility Site Access Road Telescope Foundation Telescope Base Enclosure and Control Facility (Excluding Dome) Site Infrastructure and Improvements Support Facility, San Pedro de Atacama Administration and Dormitory Facilities M3 Engineering & Technology Corporation

Mountain Facility: Requirements Site Access Road Telescope Foundation Dome Foundation Control Building Local Control Room and Open Office Space Conference Room, Kitchenette, Toilet/Shower Computer and Backend Room Instrument Preparation Lab and Workshop Mechanical / Electrical Support Space Utility Building and Lay Down Yard Electric Power Generators and Transformers Chillers and Pumps Domestic and Fire Water Holding Tank and Pumps M3 Engineering & Technology Corporation

Mountain Facility: Environment Operational Conditions Altitude: 5000-5600 m (16,400-18,400 ft) Air Pressure: 495-545 kPa (7.2-7.9 psi) Wind Speed: < 10 m s -1 (33 ft s-1) with 15m s-1 (50 ft s-1) gusts Temperature: -25 to +20°C (-13 to +68°F) Relative Humidity: 0% to 95% Max. Ice Build-up: 25mm (1.0 in) or 22 kg m-2 (5psf) Depression Temp: -40°C (-40°F) Survival Conditions Wind Speed: < 65 m s -1 (215 ft s-1) gusts Temperature: -30 to +25°C (-22 to +77°F) Diurnal Temp. Variation: 30°C (54°F) Snow Load on Horiz. Surface: 100 kg m-2 (20psf) Additional Ice Build-up: 25mm (1.0 in) or 22 kg m-2 (5psf) M3 Engineering & Technology Corporation

Mountain Facility: Observing Level M3 Engineering & Technology Corporation

Mountain Facility: First Level Plan M3 Engineering & Technology Corporation

Mountain Facility: Second Level Plan M3 Engineering & Technology Corporation

Mountain Facility: Building Section M3 Engineering & Technology Corporation

Mountain Facility: Exterior M3 Engineering & Technology Corporation

Interface Requirements Telescope: Telescope Clearance Top of Pier Elevation Pier Dimensions and Performance Requirements Telescope Elevation Axis Hydrostatic Bearing System Access and Maintenance Electrical, Mechanical and Controls Interface M3 Engineering & Technology Corporation

Interface Requirements Dome: Base Radius and Total Loads Dome Crane Capacity and Reach Electrical and Mechanical Interface Center of Dome Elevation Maintenance Access Equipment and Reach M3 Engineering & Technology Corporation

Support Facility: Requirements Site Improvements and Infrastructure Electric Power Generators and Transformer Domestic Water and Sewage System Parking Support Facility Remote Control Room Offices Instrument Labs Workshops Warehouse Dormitories Cafeteria and Kitchen Mechanical and Electrical Support Space M3 Engineering & Technology Corporation

San Pedro Architecture Massive Adobe Wall Construction Straw Roof Wood Shade Structures Courtyard Spaces Within the Compound M3 Engineering & Technology Corporation

Support Facility: Site Plan M3 Engineering & Technology Corporation

Support Facility: Administration M3 Engineering & Technology Corporation

Support Facility: Dormitories M3 Engineering & Technology Corporation

Schedule Concept Design Study and Budget Estimate Award of Contract / Kickoff Meeting: May 2005 Progress Meetings: June-Sept. 2005 Pre-Final Report Review: October 2005 Final Report Integration: November 2005 Presentation of Results: January 2006 M3 Engineering & Technology Corporation