Impact of TIDVG problem on LSS5 dump design schedule

Slides:



Advertisements
Similar presentations
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU-SPS RF Power upgrade | 09 December 2015.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Discussion and preliminary conclusions LIU-SPS dump review.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
SPS High Energy LSS5 Thermal contact & cooling aspects
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
MICE Spectrometer Solenoids Step IV running
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
Brief Status SPS Prototype PSB Prototype Installed in LS1
Proposal TDIS-TZM WP14 TDIS jaw validation testing
LIU Wire Scanner Milestones June 2017
Overview of the RFCC Module and 201-MHz Cavity Design
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Complementary ISTC Projects #3888, 3889p
Preliminary Y-chamber specifications – First draft
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the BI Work Package in the LIU-PSB frame
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Status with crucial LSS5 kicker transmission line cables
The 11T cryo-assembly: summary of design and integration aspects
Beam Wire Scanners (PS prototype and LIU series)
EYETS septa status Septa activities TE/ABT Thierry Masson
Planning Quality control - Manufacturing logbook Photos Conclusions
HIE-LINAC status report
Phase II Collimators : design status
LARP Rotatable Collimators for LHC Phase II Collimation
Hall C Dump Status Beam Resuscitation Review
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
Electron Beam Systems ETC and Methodology
East Hall under construction
n_TOF Target #3 Baseline Design
Presentation transcript:

Impact of TIDVG problem on LSS5 dump design schedule Marco Calviani, Etienne Carlier, Antonio Perillo Marcone LIU-SPS Coordination Meeting 08-06-2016

Strategy Use the design of TIDVG#4 (new LSS1 dump) as test bench for TIDVG#5 (new LSS5 dump) Common developments for both dumps TIDVG#4 will be installed in the machine in LSS1 during EYETS16-17 Profit of the outcome of TIDVG#5 preliminary design review held in 04/2016 for the design of TIDVG#4 Reduction of number of cooling feedthroughs Remove lengthy longitudinal welding of the dump copper core

TIDVG#4 new features that will profit to TIDVG#5 No more longitudinal welding. Dump block and copper core will be housed in a single extruded tube. Tube will act as vacuum chamber Tube feasibility confirmed Tube length is not a limiting factor Better separation between vacuum and cooling functions Improvement of cooling circuit Use of diffusion bounding technique (copper / inox) for improved heat exchange between cooling plate and cooling circuit Reduction of the number of cooling feedthroughs for cooling plates Cooling circuits will enter/exit the dump from the upstream or downstream ends

Impact on TIDVG#5 Development of a TIDVG#5 prototype on hold TIDVG#4 will be fully instrumented to measure cooling efficiency in order to serve as real prototype for the design of TIDVG#5 Cooling efficiency will be tested with beam Development of Thermal Conductivity and Cooling (TCC) test bench ongoing Study of thermal exchange efficiency between graphite / copper Will be useful for both dumps Lessons learned from TIDVG#4 problem to be retrofitted to TIDVG#5 project Diagnostic in case of dump failure Impact of external shielding on dump failure diagnostic to be evaluated

Summary Design of TIDVG#4 is progressing full speed with a positive impact on TIDVG#5 A lot of synergies present between design of TIDVG#4 and TIDVG#5 New concepts (mechanical assembly and cooling circuit) will be tested with beam. This will be invaluable for the final design of TIDVG#5 No visible impact of the TIDVG#5 planning for the time being. Strong feeling that, at the end, TIDVG#5 will profit of the TIDVG#3 problem Delivery of the full dump in 2019 for mock-up installation in BB5 is still the project baseline.