Production Considerations

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
1 System Eng. in DoD 13 October 2010 WORKFORCE COMPOSITION CPR PEO IEW&S Organizational Assessment VCSA Brief Date 2010 This briefing is UNCLASSIFIED/FOUO.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
Contracting (Product) Considerations
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
MNS - Mission need statement
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Technology Readiness Levels
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Lesson 9 Production and Deployment (P&D) Exercise Team #
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Lesson 9 Production and Deployment (P&D) Exercise Team #
ISA 201 Intermediate Information Systems Acquisition
Workshop Schedule Welcome and Workshop Overview
DAG CH 3 Figure 11: Weapon System Development Life Cycle
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, December 2015.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
Lockheed Martin Canada’s SMB Mentoring Program
AOFR: Assessment of Operational Field Readiness
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
The Department of Defense Acquisition Process
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Production Considerations CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA Production Considerations Production Activities Define/develop production concepts Evaluate necessary production quantities and rates Identify production risks/opportunities Assess ability to produce design concepts Identify production cost drivers Identify TMRR AS production risks/ opportunities Identify EMD AS production risks/opportunities Conduct production cost/performance trades Evaluate production concepts to meet quantity/rate expectations Document initial production approaches Demonstrate ability to produce subsystem and system prototypes Develop production cost model Identify long lead and critical supply chain risks and opportunities Assess production cost realism Identify P&D AS production risks/opportunities Finalize design & build specifications Plan for LRIP Conduct detailed production trades studies Develop production process control measures Assess production methods & industrial capability Demonstrate pilot production line Develop configuration management structure Develop production contracting strategy Assess/increase quality of build to drawings Complete as built design (S/W systems) Demonstrate/refine production processes Produce LRIP/FRP articles Execute SW deployments & upgrades Initiate exportable version production Develop potential second source production Evaluate/Monitor supply chain risks/opportunities Plan production shut down Produce system improvements Execute S/W deployments & upgrades Monitor production vulnerabilities ISR: normally the FRP/FD review and decision completes the action Documentation and Reviews Acquisition Strategy Draft CDD/CONOPs Initial SEP, PPP, TEMP & LCSP Draft System Performance Specification ASR System (Performance) specification CDD/OMS/MP/Use Cases SEP, PPP, TEMP & LCSP TR and MRL Assessments Initial interface control documents Quality and Manufacturing Plans IP Strategy SFR, PDR CPD System (Performance) and product specifications (initial system element specification) Interface control documents SEP, PPP, TEMP, & LCSP Quality and Manufacturing Plan Updates IP Strategy Update CDR, SVR/FCA, PRR System (Performance) and product specifications Drawing package PCA, ISR DMSMS Assessments Obsolescence studies/reports ECP Packages PIR

SFR: System Functional Review SVR/FCA: System Verification Review/ Functional Configuration Audit SRR: System Requirements Review S/W: Software TEMP: Test and Evaluation Master Plan TR: Technology Readiness TRR: Test Readiness Review LCSP: Life-Cycle Sustainment Plan LRIP: Low-Rate Initial Production MDD: Materiel Development Decision MRL: Manufacturing Readiness Levels OA: Operational assessment OMS/MP: Operational Mode Summary/Mission Profile OTRR: Operational Test Readiness Review PCA: Physical Configuration Audit PDR: Preliminary Design Review PIR: Post-implementation Review PPP: Program Protection Plan PRR: Production Readiness Review SEP: System Engineering Plan ASR: Alternative Systems Review CDD: Capability development document CDR: Critical Design Review CPD: Capability Production Document CONOPs: Concept of Operations EOA: Early Operational Assessment FOC: Final Operational Capability FOT&E: Follow-on Test & Evaluation ICD: Initial Capabilities Document IOC: Initial Operational Capability IOT&E: Initial operational test & evaluation ISR: In Service Review