Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: A pen example: assembly and its components, adapted from Ref. [34]
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: Liaison graph of the pen, adapted from Ref. [34]
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: Transportation flows of the two assembly plans: (a) assembly plan I and (b) assembly plan II
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: AND/OR graph of the pen example
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: An example of an assembly plan
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: An example hyper AND/OR graph for the pen example
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: An instance of assembly plan with supplier assignment
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: Assembly plans of the pen
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: Laptop and the liaison graph, adapted from Ref. [35]
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: Precedence graph of the laptop, adapted from Ref. [35]
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: A part of the AND/OR graph of the laptop
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: The optimal assembly plan with supplier assignment
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: The material flow of the optimal assembly and supply chain plan
Date of download: 10/27/2017 Copyright © ASME. All rights reserved. From: Concurrent Design of Assembly Plans and Supply Chain Configurations Using AND/OR Graphs and Dynamic Programing J. Manuf. Sci. Eng. 2016;138(5):051011-051011-9. doi:10.1115/1.4032027 Figure Legend: The optimal assembly plan with supplier assignment: under supply chain with increased display price in country 2