EPCOR White Rock Rate Application

Slides:



Advertisements
Similar presentations
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Advertisements

2010 Draft Municipal Budget
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
Fairview Township, York County May 28, 2015
Pasadena Water and Power Electric Rates Workshop: Cost of Service Analysis and Rate Proposals.
Development (Impact) Fee Program Changes to Comply with State Law Mayor and Council Study Session June 3, 2014.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
2006 Budget Challenges Additional Increases in Pension Contributions = +$451,200 Additional Assessment from RVSA = +$315,000 Increases in Fuel and Utility.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
2007 Budget Headlines Two Full Time positions reduced to Part Time One Part time position eliminated Effective collective bargaining negotiations – Total.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
2013 Business Planning Process. Business Planning Process Guidelines Budget Preparation Preparation of Business Plans Management Review Presentations.
1 Water Utility Regulation Straw Proposal October 13, 2015.
1 Public Hearing User Rate Adjustments April 8, 2008.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
Proposed Consolidation of Albury and Victorian Access Arrangements 10 November 2015.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Proposed 2013 Budget Highlights 1. Executive Summary Proposed City tax increase of 4% with an overall impact of 1.9% – Delivers on City’s Long Term Financial.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
City of Port Moody Draft Financial Plan Tuesday, February 26 th, 2013.
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Proposed Draft Financial Plan April 10, 2017
City of Petersburg Water and Wastewater Rates
PUBLIC MEETING 2017 Water and Sewer Budget December 13th, 2016.
Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
Developments in our water sector policy
Property Tax 101 Web: Direct:
Narragansett Electric Rate Classes
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
City of Petersburg Water and Sewer Rates April 26, 2011
Sewer Code Update (Title 13)
CAPITAL AND RATE SUPPORTED OPERATING BUDGETS
Joshua Basin Water District Draft Findings & Rate Scenarios
Utilities Department Wedgefield Water November 28, 2017.
Andy Mathews President, Treasurer Brad Smith Vice President
Joshua Basin Water District Revised Rate Recommendations
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Lebanon, Missouri Electric Department
FINAL 2018 Budget December 14, 2017 City Council Meeting 12/14/2017
Balancing the Operating Budget Ward Forum Presentation
BUDGET WORKSHOP February 15, 2017.
Work Session Follow UP Aug. 23, 2018.
Our Municipality’s Finances
2019 Water and Waste Water Rates
Town of Wrentham DPW Water Department
2018 Water/Wastewater Rate Study and Financial Forecast
Water Rates Public Hearing
Smart Meter Update Oregon Public Utility Commission
Presentation transcript:

EPCOR White Rock Rate Application Revenue Requirement Application 2011, 2012, 2013 DRAFT FOR PUBLIC COMMENT December 2010

Regulatory Process for Water Rates Water rates regulated by the Comptroller of Water Rights, who works for the Ministry of Natural Resource Operations Comptroller issued a decision for 2008 to 2010 rates in 2008 - Approved projected capital and operating costs - Deferral accounts for consumption, property taxes, interest and income taxes - Direction to remove capital costs for Arsenic Treatment project until study completed New regulatory application is required for the 2011 to 2013 period prior to the end of the year

2011-2013 Proposed Rates Key Drivers Maintain aging infrastructure Maintain reliability, fire flow requirements and water quality Cross-connection control program (water quality) Inflation Modest customer growth and consumption trends Increases partially offset by operational efficiencies Two Components to Rate Changes General increase to cover costs to provide water services Rate rider to refund customers for deferral account balances

2011-2013 Forecast Operating Costs Forecast annual increase in operating costs of 3% on average due to: Increase in labour costs due to additional work related to cross connection control program and 3% salary escalation Increase in utilities costs based upon BC Hydro power price forecast Increase in general and administrative costs  ($ millions) 2010 Decision 2011 Forecast 2012 Forecast 2013 Forecast Total Operating Costs $1.52 $1.61 $1.63 $1.67

2011-2013 Forecast Capital Expenditures Capital upgrades of $2.64m are required to maintain reliability and water quality, meet fire flow requirements and replace aging infrastructure. Rate Base Capital includes: Water main upgrades Wells (assessment and rehabilitation) Annual programs (meter replacements, hydrant replacements) Galvanized piping replacements No Cost Capital includes: New water service installations  ($ millions) 2011 Forecast 2012 Forecast 2013 Forecast Total Rate Base Capital $1.06 $1.17 $1.07 $3.30 No Cost Capital (0.21) (0.22) (0.23) (0.66) $0.85 $0.95 $0.84 $2.64

2011-2013 Proposed Rate Increases Current rates are insufficient to recover expected costs, therefore, a rate increase is required Rate increases smoothed over 3 year period Proposed monthly rates and rate riders are:   2010 2011 2012 2013 Minimum Charge $ 14.38 $ 15.18 $ 16.02 $ 16.91 Additional Charge $ 5.17 $ 5.47 $ 5.78 $ 6.09 Rate Rider $ 0.82 - $ 0.15 - $ 0.14 Total $ 20.37 $ 20.51 $ 21.66 $ 22.86 Change (Monthly) $ 0.14 $ 1.16 $ 1.20 Note: Based on average residential consumption of 25 m3 per month

Monthly Bill of a Residential Customer (Comparison of proposed 2011 rates with neighboring communities’ 2010 rates) Note: Based on average residential consumption of 25 m3 per month Source: Delta – Bylaw No. 5781 Surrey – www.surrey.ca Richmond – Bylaw No. 5637 Vancouver – vancouver.ca Langley – www.city.langley.bc.ca

Stakeholder Engagement & Regulatory Process - Consultation with Customers - Feedback Regulatory Process – Next Steps - EWR to file application mid-Dec 2010 - includes application for interim refundable rates effective Jan 1, 2011 - Public Notice of Application

QUESTIONS?