Micro Vertex Detector of PANDA Strip Detector

Slides:



Advertisements
Similar presentations
MVD A SSEMBLY T WO HALF FRAME DONE – D IMENSION T ESTED A NCILLARIES FOR F RAMES DONE – D IMENSION T ESTED F RAME A SSEMBLY & F INAL M ACHINING – MUST.
Advertisements

CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
MICRO VERTEX DETECTOR ZEUS experiment at DESY (HAMBURG) PROJECT SPECIFICATIONS : Design and production of a silicon Micro Vertex Detector (MVD) for the.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
The HCAL barrel absorber structure
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
ATHENA - Module Construction P. Riedler, J. Rochet.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
For the CMS Pixel detector
DT-LHCb coordination meeting 18 April 2016
GSI, for the CBM Collaboration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Update of MVD services and requests
Beam
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
WP9 ITS Mechanics and Cooling
Services Layout – Update
Integration issues at IHEP
CFD-Team Weekly Meeting - 8th March 2012
Adapting the via last Design
First of all we will remind some numbers:
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Work packages status in Torino and perspectives
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
For the CMS Pixel detector
Presentation transcript:

Micro Vertex Detector of PANDA Strip Detector PANDA Mechanics Meeting Vienna 2015.11.30

Work in Progress Design Manufacture Stave (prototype fixed) Arrangement of Service lines (goings on) Disc attachment and Structure (pixel/strip) (goings on,FEM Calculation) Manufacture Two Barrel (4) Staves with cooling modules as Prototype mechanical hybrid at IKV Disc Support for Readout electronics mechanical hybrid at IKV Manufacturing of Stave structure with Cooling jigs manufacturing Manufacturing of Disc support structure jigs manufacturing Quality controls New X-ray machine assembly at ZEA 1 Thermal hydraulic investigation and tests Hydraulic Test at ZEA 1 (Flow rate and temperature variation)Test rig upgrading: automatization (neu pump) Investigation of cooling pipes FEM Validation Disc deformation behaviour (Presentation from Dirk G.) Half shell deformation behaviour Vienna 20151130 ZEA 1

MVD Stave Barrel 4 Prototyp Mechanical Prototype Currently two pieces are laminated at IKV Aachen Top view Full equipped Prototype Bottom view Vienna 20151130 ZEA 1

MVD Strip Disc cooling module Currently two pieces are laminated at IKV Aachen CFRP Preprag Carbon foam Draft Cut outs for Chip positioning ? Better cooling Difficult to install the flexfoil with Chips Vienna 20151130 ZEA 1

MVD Strip Design Main Dimension 141 157 Frame Do/Di =282/274 mm Disc Do/Di =265/144 mm Barrel Do/Di =259/259 mm Vienna 20151130 ZEA 1

Hydraulic Tests U-Tube Type4 (fi 1.8mm *720 mm) Delta Pmax ~ 0,50 bar is to verify Vienna 20151130 ZEA 1

arrangement of the Cooling tubes MVD Strip Barrel arrangement of the Cooling tubes Arrangement of the cooling tubes in front of the MVD Advantage Lower pressure drop Less tubes over the GBT Disadvantage Less space for services lines at Pixel Barrel Vienna 20151130 ZEA 1

MVD Strip Barrel Service lines Draft Arrangement of the cooling tubes in front of the MVD Strip Barrel View from the outer part Vienna 20151130 ZEA 1

Draft Barrel 3 Service lines Arrangement of the cooling tubes and cables in front of the MVD Barrel 3 View from the inner part Draft Vienna 20151130 ZEA 1

Draft Barrel 4 Service lines Arrangement of the service lines in front of the MVD Barrel 4 View from the outer part Draft Vienna 20151130 ZEA 1

Outlook Design Manufacture implementation optimize the service lines, (support and connections points) Disc structure with cooling hybrid Tube and cable routing Manufacture implementation Manufacturing of father Stave hybrid structure with cooling Manufacturing of Stave structure with Cooling Manufacturing of further cooling modules Manufacturing of jigs for alinements Test hybrid of disc cooling module Development and manufacturing of disc support structure Development and manufacturing of jigs ( manufacturing, alinements, assembling) Manufacturing of Disc support structure Production controls Quality controls New X-ray machine assembly at ZEA 1 Hydraulic and Thermal investigation Test rig automatization Extended pressure drop investigation (until control panel) Thermal tests with complete Double-Stave (Pressure drop, leakage) Quality Control (Delamination, glue, leakage, pressure…) FEM Validation Thermal investigation (full equipped double stave) Mechanical deformation behaviour Vienna 20151130 ZEA 1