UK Feedback Feedback from Prof John Womersley, Chief Executive of Science and Technology Facilities Council (STFC), UK at the Cockcroft Institute Board.

Slides:



Advertisements
Similar presentations
Cockcroft Institute P. Goudket Cockcroft All Hands Meeting - March 2007 ILC Crab Cavity Collaboration Amplitude and Phase Control Development Cockcroft.
Advertisements

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Storage Rings for Charged Particles Kai Hock Cockcroft Institute and University of Liverpool Birmingham University, 24 February 2009.
Cockcroft Institute LC-ABD plenary April 2007 ILC Crab Cavity Collaboration Cockcroft Institute : –Richard Carter (Lancaster University) –Amos Dexter (Lancaster.
Interface between WPs inside FP7 HiLumi and WPs/Systems outside Lucio Rossi HL-LHC Project Coordinator CERN HiLumi/LARP collaboration Meeting 17 November.
Initiating the Crab System R&D Graeme Burt Lancaster University Philippe Goudket Daresbury Laboratory.
Nick Walker KEK-DESY meeting 7 th March 2005.
The Cockcroft Institute and its Manchester activities Roger Barlow School Research Lunch Friday July 2 nd 2010.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Ongoing & Planned BDS work Deepa Angal-Kalinin ASTeC Daresbury Laboratory (CCLRC)
Analysis and Control of Beam Dynamics in EMMA Kai Hock and Andy Wolski STFC PPRP Meeting, Glasgow, 24 June 2009.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
The Accelerator Group a rapid overview Roger Barlow Christmas Meeting Tuesday December 21 st 2010.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
Towards a Coordinated R&D Plan for ILC Damping Rings Impedance Issues Andy Wolski University of Liverpool and the Cockcroft Institute 28 September, 2006.
NON-SCALING FFAGs: questions needing answers Andy Wolski The Cockcroft Institute, and the University of Liverpool Department of Physics. BASROC-CONFORM.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
HL-LHC-UK G. Burt, Lancaster University 1. HiLumi-LHC UK HiLumi-LHC UK Superconductivity and Cryogenics Machine-detector interface Beam dynamics Crab.
EuCARD2  Third in a series of FP6/7 IAs on Accelerator R&D: Coordinated Accelerator Research in Europe(FP6) to coordinated by CEA - 22 partners.
TLEP and Relevant Accelerator Expertise UK the same tunnel could host an e + e - Higgs factory “TLEP” and a highest-luminosity highest-energy e-p/A collider.
Welcome !! to the CAoPAC Workshop Carsten P. Welsch.
CI 11 th December 2008 CI Structure. CI 11 th December 2008 RF at the CI Lancaster University Engineering Department Professor Richard Carter (Academic)
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
EMMA, BASROC, Hadron Therapy and ADSRs Roger Barlow STFC Cockcroft Review Feb 11 th 2009.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Manchester Accelerator Group Strategy Roger M. Jones, 11 th July 2011.
Roger M. Jones, 9 th July EPS Prize.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Potential Berkeley Lab interests in ELENA Construction Hardware: Low-level RF controls Schottky diagnostics H- ion source Beam physics: Cooling S2E Simulations.
The Design and Effects on the Electron Beam of the International Linear Collider Positron Source Helical Undulator Duncan Scott Magnetics and Radiation.
INTRODUCTION PASI 2015 Swapan Chattopadhyay. ACKNOWLEDGMENT Steve Geer Steve Holmes Ken Long Peter McIntosh Sergei Nagaitsev Vladimir Shiltsev Alexander.
Beam dynamics and linac optics studies for medical proton accelerators
JAI Fest Welcome! JAI Fest meeting 10 Dec 2015 Andrei Seryi John Adams Institute for Accelerator Science.
High Power Proton Accelerators: UK Vision & Capabilities John Thomason, STFC PASI, 11 November 2015.
Hosted at KIT (Karlsruhe Institute of Technology)
FCC-ee Interaction Region design
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
The Cockcroft Institute Education Programme
Thomas Schoerner-Sadenius DESY Hamburg, Germany
Accelerator R&D for Future Neutrino Projects
J. Alexander + Cornell accelerator group Cornell University
Installation of an Instrument on a CERN machine
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Accelerator Research and Innovation for European Science and Society
Perspective on future challenges for very high energy hadron colliders
@tarashears.
John Womersley Super-B Workshop Oxford May 2011
Welcome !! to the Conference on Beam Diagnostics
PLACET collimator studies
Developments on Proposed
The HL-LHC project: info day for industry
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
CLIC-ILC BDS & MDI work.
Future Collider Projects at CERN
FCC-hh Machine Detector Interface
HL-LHC General Meeting 2016 Introduction to Collaborations
STFC Contributions to the FCC Study
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
Andrei Seryi Materials for discussion TILC-08
CLIC damping rings working plan towards the CDR
List of IPAC19 papers with reference to HL-LHC
Presentation transcript:

POTENTIAL UK COMMUNITY INTEREST and ROLE in the FCC STUDIES Swapan Chattopadhyay

UK Feedback Feedback from Prof John Womersley, Chief Executive of Science and Technology Facilities Council (STFC), UK at the Cockcroft Institute Board meeting. Encouraged to engage with the UK community, STFC and its Accelerator Strategy Board in recognising the critical importance for UK in participating strongly in the FCC studies. Below is our current understanding of voluntary interest in contributions that may be possible towards the FCC from UK.

Cockcroft Institute Interest/Expertise MANCHESTER Rob Appleby: IR design, optics and detector integration, synchrotron radiation in the ring/IR, electron/proton ring optics, collimation, crab cavity dynamics Hywel Owen: Electron storage ring optics   Guoxing Xia: Collective instabilities in the ring (ion instability (fast ion instability), electron cloud, intrabeam scattering, beam induced wakefields) Roger Jones: Wake fields and impedance  LIVERPOOL Andy Wolski, David Newton: Proton and electron beam dynamics, Crab cavity dynamics Carsten Welsch: Beam Diagnostics LANCASTER Graeme Burt, Amos Dexter: RF and crab cavities engineering systems Ian Bailey: Positron Source ASTeC Deepa Angal-Kalinin, Bruno Muratori: Beam dynamics and beam-beam interactions Peter McIntosh: RF systems and Crab cavities Shrikant Pattalwar: Cryogenics, Collimation Oleg Malyashev, Reza valizadeh: Vacuum, coatings

Across UK Interest/Expertise JOHN ADAMS INSTITUTE Andrei Seryi (+): p-p only (not TLEP)  HUDDERSFIELD Roger Barlow (+): Collimation SOUTHAMPTON Cryogenics RHUL Stew Boogart: Diagnostics Steve Gibson: Ccollimation for protons and electrons

POSSIBLE WORK PACKAGES   Beam Dynamics (Instabilities, Beam-beam, e-cloud, Luminosity lifetime, Feedback systems) RF Systems (High power, Low level RF control, Accelerating and deflecting cavities) Lattices and Optics Beam Diagnostics and Instrumentation Machine Detector Interface (Collimation, Luminosity monitor, Energy monitor) Cryogenics Vacuum

HORIZON 2020   UK has established strong credibility and track record as: (i) the largest contributor to the EU FP-7 HI-Lumi LHC project after CERN; (ii) providing the Chair of the Collaboration Board; (iii) hosting official HL-LHC kick-0ff meeting. UK accelerator community intends to join CERN fully in the Horizon 2020 bid for FCC