Multinational Planning MNF SOP 18 After Action Review

Slides:



Advertisements
Similar presentations
Common Errors to avoid in IRB- 03 (VA) Applications.
Advertisements

Update for BKCASE Workshop VI Part V: Implementation Examples John Brackett, Aaron Chia, Heidi Davidz, Kevin Forsberg, Richard Freeman, Tom Hilburn, Alex.
UNCLASSIFIED 1 MNF SOP Workshop 20 – 24 June June 2011 Workshop Overview Brief UNCLASSIFIED.
Doctrine Development &TTP Publication Review
Crisis Action Planning Commander’s Guidance and Intent
29 Jul 2005 UNCLASSIFIED UNITY OF EFFORT – TEAMWORK - COOPERATION TEMPEST EXPRESS # 8 AFTER ACTION REVIEW (AAR)
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
After Action Review. 2 AGENDAAGENDA AAR ROEAAR ROE REVIEW GOALSREVIEW GOALS PARTICIPANT COMMENTSPARTICIPANT COMMENTS GOALS SCORE-CARDGOALS SCORE-CARD.
1 Multinational Planning Augmentation Team (MPAT) TE-6 Brief / Way Ahead March 2004 Enhancing Multinational Operations.
Oslo Guidelines Key concepts and principles. History… Oslo process began in 1992, with first guidelines first released in Following the increasing.
1 Multinational Planning Augmentation Team and Asia-Pacific Area Network (MPAT & APAN) in Asia and the Pacific 2 May 2007 COL John M Bratton, USA (Ret.)
Multinational Planning Augmentation Team (MPAT) Enhancing Multinational Operations Updated
1 MNF SOP CBRN-TIM MNF SOP CBRN-TIM 12 JUNE 2015.
UNCLASSIFIED 1 Toxic Industrial Material (TIM) Hazards & MNF SOP Consequence Management (CM) Annex 12 June 2007.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
National Incident Management System NIMS Revision Al Fluman, Acting Director Incident Management Systems Division (IMSD), National Integration Center.
ARF Strategic Guidance Technical Working Group: Current Status of Initiative ASEAN Regional Forum Statement on disaster management and Emergency Response.
Multinational Coordination Center
UNCLASSIFIED 1 MPAT TEMPEST EXPRESS-14 Staff Planning Workshop Phase I - Introduction 4 March 2008.
FUTURE MPAT ACTIVITIES. Future MPAT Activities Summary u Time Window 22 July – 10 Aug 01 - Concept and SOP Development Workshop #5 – Location: TBD u Time.
UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 01 May 2010 What is MPAT?
MNF SOP 18 After Action Review (AAR) 8-12 June 2015
Group 5 : Rules of Engagement and CTF Operational Standards of Conduct MNF SOP 18 After Action Review (AAR) 8 June 2015 Format.
UNCLASSIFIED 1 Multinational Coordination Center (MNCC) MPAT TEMPEST EXPRESS (TE) April 2015 Nouméa, New Caledonia.
UNCLASSIFIED 1 “ Southeast Asia Disaster Management Cooperation” Indonesia, June June 2007.
UNCLASSIFIED 1 Gema Bhakti 2015 Lane 4: MNCC Operations Overview 14 September September 2015.
MPAT SECRETARIAT Multinational Force Crisis Action Planning Overview COALITION/COMBINED TASK FORCE TRAINING.
Framework for Effective Multinational OPs Multinational Planning Augmentation Team (MPAT) MNF SOP WORKSHOP JTF to CTF Transition Guide (Annex)
UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 18 September 2009 What is MPAT?
Multinational Planning Augmentation Team (MPAT TE-3) Staff Planning Workshop Multinational Planning Augmentation Team (MPAT TE-3) Staff Planning Workshop.
TX SET Update to RMS Wednesday, May 9, Elimination of the Drop to AREP o RULEMAKING TO AMEND COMMISSION SUBSTANTIVE RULES CONSISTENT WITH §25.43,
UNCLASSIFIED 1 UNCLASSIFIED Concept of Operations Brief 05 July 05 MPAT TEMPEST EXPRESS-8 HAWAII JULY 2005.
UNCLASSIFIED 1 MPAT TEMPEST EXPRESS -15 Staff Planning Workshop Overview 28 July – 1 August Jul 08.
Center of Excellence PEACE OPERATIONS COMMAND & CONTROL AND COMMAND & CONTROL AND TRANSITION ISSUES Lt Col (R) John Derick Osman Center of Excellence in.
MID-TERM CONSULTATION
Standing Operating Procedures
process and procedures for assessments
MULTINATIONAL FORCES STANDING OPERATING PROCEDURES (MNF SOP)
Texas Education Agency Student Assessment Division
Ergonomics Design Process – 21 Review Overview of Changes for Vehicle/GPS New book being published Last revision was 2013 Collaboration during product.
MID-TERM CONSULTATION
Workshop Administrative Information
US Kickoff brief to Frameworks Convergence Meeting
Multinational Planning Augmentation Team (MPAT)
MPAT TEMPEST EXPRESS 30 Staff Planning Workshop Introduction
Receipt of Mission (MDMP)
Standing Operating Procedures
MNF SOP Working Group Interagency Out Brief
Moving from ISO 9001:2008 to ISO 9001:2015.
Doctrine Development & TTP Publication Review Mr. Nielsen TTGL N3A2
MNF SOP ver. 3.1 & MNF SOP Extracts
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
Workshop Administrative Information
ECTS Implementation Discussion in small groups on the question:
Updating Items in Scorebook Navigator
Humanitarian Assistance
Plan Security for a Command Post (CP)
Doctrine Development & TTP Publication Review Mr. Nielsen TTGL N3A2
2018 Athletic Director Workshop
Working Group Out-Briefs
Revising the Sphere Handbook:
US Kickoff brief to Frameworks Convergence Meeting
After Action Review (AAR) Plan
Updated July 10, 2015 for July Training
Standing Operating Procedures
Multinational Planning Augmentation Team (MPAT)
Multinational Planning Interagency Coordination
MNCC and Humanitarian Coordination Venues:
Self-Assessment Facilitators Guide Review and Resource Update
Family Guide: Understanding Transition Team Members’ Responsibilities
Presentation transcript:

Multinational Planning MNF SOP 18 After Action Review Augmentation Team - MPAT - Good morning/afternoon/evening. My name is . I am from the US PACIFIC COMMAND’s Operations Directorate (J3), Training and Exercise Division. (I am representing the multinational planning augmentation team (MPAT) Secretariat.) I would like to say a few words about the MPAT program. MNF SOP 18 After Action Review 12 June 2015

Group 6 : Glossary, Acronyms, References MNF SOP 18 After Action Review (AAR) 12 June 2015 Group 6 : Glossary, Acronyms, References

Broad Actions Completed MAJOR primary action performed: Reviewed Volume 4 of MNF SOP in it’s entirety. Glossary (Part E, Ch. 1 of Volume 4) Screened 43 pages of glossary definitions and revised, clarified, or added terminology. Integrated definitions found in main body of MNF SOP Abbreviations and Acronyms ((Part E, Ch. 2 of Volume 4) Added, deleted, or revised 11 pages of abbreviations and acronyms References (Part E, Ch. 3 of Volume 4) Updated or added country-specific references to section as provided

Broad Actions Completed MAJOR secondary actions performed: Enabled the transition of the MNF SOP towards a focus on Mulitinational forces instead of Coalition/Combined armed forces through changes in terminology, definitions and acronyms Reviewed all documents from other groups

Refinement / Changes Made (Major Processes / Themes Revised) Integrated terminology completely from below sections: Part B – Chapter 2 – Annex B - Appendix 5 – Tab A: Liaison Activities, Definitions (page B-2-B-5-A) Part C – Chapter 9 – Annex D - Appendix 4: Glossary (page C-9-D-4) Part C – Chapter 9 – Annex K – Appendix 2: Engineering Glossary (page C-9-K-2) Part D – Chapter 1 - Annex C : Humanitarian Assistance and Disaster Relief - Appendix 1: Definitions (page D-1-C-1) Part D – Chapter 1 - Annex C – Appendix 6 – Tab A: Key Terminology and Definitions (page D-1-C-6) Part D – Chapter 1 - Annex C – Appendix 6 – Tab B: Acronyms (page D-1-C-19) Recommend removal of these sections from MNF SOP.

Refinement / Changes Made (Major Processes / Themes Revised) Fully replaced the term Coalition/Combined with Multinational in Volume 4. Streamlined definition of Multinational Coordination Center and removed redundant definitions/ acronyms Removed Enemy Prisoner of War (EPW) Removed Use and Non-use of Force Removed Civilian Internee (CI) Removed Rules for Use of Force (RUF)

Issues / Recommended Future Actions (Major Ones) Create share file/network to facilitate transfer of and review of recommended verbiage. Participating Nations should bring current references list with them prior to MNF SOP workshop to facilitate updating. Recommendations Fully replace the term Coalition/Combined with Multinational in the MNF SOP. Use Vol. 4 as the guide Review entire MNF SOP for terminology, acronyms and abbreviation not found in Vol.4. – Use Vol. 4 as the guide. Review Reports Matrix (draft Ch.4) and integrate into Vol. 4 if required.

Workgroup Closing Remarks Acronyms to Add: ZA OMG LMAO LOL ROTFL Consider future use of emoticons : ) : ( : D >:/

Workgroup Closing Remarks Glossary Term: Whisky Tango Foxtrot (WTF) – “An expression of incredulity or disbelief while simultaneously requesting clarification.”

Questions