LHC Injection Kicker System: Cr2O3 Coating of Ceramic (Al2O3) Tube

Slides:



Advertisements
Similar presentations
Detectors and Accelerators
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
The Large Hadron Collider By Kathleen McKay. What is the LHC? The most powerful particle accelerator in the world. A synchrotron (ring-shaped particle.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Neil Collins Birmingham Masterclass Tuesday 24 April 2007 ATLAS and the LHC.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
LHC  Facts and figures  Experiments involved  Aims  How it works.
The CMS Muon Detector Thomas Hebbeker Aachen July 2001 Searching for New Physics with High Energy Muons.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
1 Some predictions and experiment prospects of the heavy ion physics at LHC C. Kobdaj, Y. Yan and K. Khosonthongkee School of Physics, Institute of Science.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
Particle Accelerators
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
An Introduction To Particle Accelerators A-Level Physics.
Cyclotrons accelerate charged particles and fire them into a bubble chamber.
What is the Higgs??? Prof Nick Evans University of Southampton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Search for a Z′ boson in the dimuon channel in p-p collisions at √s = 7TeV with CMS experiment at the Large Hadron Collider Search for a Z′ boson in the.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Anatomy of Accelerators Marty Peters Summer 2006.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Steve Playfer University of Edinburgh 15th Novemebr 2008 Large Hadron Collider at CERN.
LHC LARGE HADRON COLLIDER World’s largest and highest-energy particle accelerator. Built by the European Organization for Nuclear Research(CERN). To study.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
PPAC Jonathan Olson University of Iowa HCAL November 11-13, 2004.
SPSU M.Taborelli Results from MD week 45 Views of extracted liners and RF shields M. Taborelli for SPSU team.
ISIS – Rutherford Appleton Cockcroft -Walton LINAC Muons Neutrons Synchrotron.
CERN Large Hadron Collider
UK Neutrino Factory Conceptual Design
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
MKI Performance During 2016 and Plans for EYETS
contribution to the round table discussion
Introduction to CERN Activities
M.J. Barnes : Canadian Involvement with LHC
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
CLIC Damping ring beam transfer systems
Electron cloud & vacuum pressure observations: 2011 proton run
Introduction to CERN Activities
Frank Deppisch, Ralph Engel, Paolo Lipari, James Pinfold
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
Lecture 2 Live Feed – CERN Control Centre
MD Studies for LIU PS Injection
FCC Kicker Systems M.J. Barnes, T. Kramer CERN TE-ABT
Synchrotron Ring Schematic
The Large Hadron Collider
Parameters of the NF Target
Also on behalf of V. Senaj & L. Ducimetière
MKI Operational Experience and Future Plans
CSP Meeting CERN CERN Accelerators in th November 2010
Collimation for beta-beams
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC (SSC) Byung Yunn CASA.
Multi-Turn Extraction for PS2 Preliminary considerations
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Explanation of the Basic Principles and Goals
The Measurement of Forward Particle Production in LHC
Presentation transcript:

LHC Injection Kicker System: Cr2O3 Coating of Ceramic (Al2O3) Tube M.J. Barnes CERN TE-ABT M.J. Barnes 28/10/2016 - Polyteknik

Outline of Presentation CERN Accelerator Complex Beam Transfer – Kicker Magnets LHC Kicker Magnets – brief description Problems experienced with kicker magnets: SEY UFOs Heating (see talk by Lorena) Results of Cr2O3 coating Next steps M.J. Barnes 28/10/2016 - Polyteknik

CERN’s particle accelerators The Large Hadron Collider (LHC): Two beams of >1014 of protons each circulating around a 27 km ring at close to the speed of light, in opposite directions; Made to collide in 4 detectors (ALICE, ATLAS, CMS, LHCb); ~90 µs per rotation; At 7 TeV each proton has ~7500 times the mass of a stationary proton. 25 ns Bunch: presently up to 1.16x1011 protons per bunch. Up to 2808 bunches circulating per beam LHC Beam: Awake LHC 450+450GeV to 7+7TEV; SPS 25Gev to 450GeV PS 1.4GeV to 25GeV PSB to 50MeV to 1.4GeV Note: relative circumference of the rings…. Many different detectors have to be used, each providing a different piece of information to physicists. To understand such a complex system, one needs to observe the phenomenon from different points of view, using different instruments at the same time. LHC experiments ATLAS A Toroidal LHC Apparatus, general-purpose detector. 46 metres long, 25 metres in diameter, and weighs about 7,000 tonnes; CMS Compact Muon Solenoid, general-purpose detector. The complete detector is 21 metres long, 15 metres wide and 15 metres high. 4T magnetic field LHCb LHC-beauty. A specialized b-physics experiment, that is measuring the parameters of CP violation in the interactions of b-hadrons (heavy particles containing a bottom quark) ALICE A Large Ion Collider Experiment: optimized to study heavy-ion collisions. TOTEM Total Cross Section, Elastic Scattering and Diffraction Dissociation. The detector aims at measurement of total cross section, elastic scattering, and diffractive processes. LHCf LHC-forward, is intended to measure the energy and numbers of neutral pions (π0) produced by the collider. This will hopefully help explain the origin of ultra-high-energy cosmic rays. MoEDAL Monopole and Exotics Detector At the LHC LHC preaccelerators Linear accelerators for protons (Linac 2) and Lead (Linac 3) PS Proton Synchrotron SPS Super Proton Synchrotron Animation courtesy of Lorena Vega Cid M.J. Barnes 28/10/2016 - Polyteknik

Beam transfer between accelerators time kicker field intensity injected beam ‘boxcar’ stacking “n” Septum magnet Kicker magnet (installed in circulating beam) Focusing-quad Injected beam Circulating beam Defocusing-quad Field “free” region Thin septum blade Homogeneous field in septum Kicker field: fast rise/fall, good flat-top, high precision timing Beam injection, extraction, dump: M.J. Barnes 28/10/2016 - Polyteknik

LHC Injection Kicker Magnets LHC Transmission Line Kicker Magnet Ferrite yoke Magnet, in vacuum tank, with ceramic tube Ceramic tube Kicker Magnet Screen conductor in slot “Ground” on one end of outside of ceramic tube Ceramic capacitor High voltage is induced on the screen conductors during magnetic field rise and fall (~μs): varies between ~30 kV at the bottom to ~8 kV at the top. LHC Injection Kicker Magnets Baked out to 325°C to be compatible with ultra-high vacuum (~10-11 mbar in tank); 2.7m long magnet; ~3m long ceramic tube with 42 mm inside diameter, in 54 x 54 mm aperture of kicker. Ceramic tube is a “carrier” for conductors – to screen the ferrite yoke from the high intensity LHC beam; One end of each screen conductors is connected to ground, the other is capacitively coupled to ground; High vacuum pressure can result in electrical breakdown. M.J. Barnes 28/10/2016 - Polyteknik

Treatment of Ceramic (Al2O3) Requirements: No coating dust on surface Good adhesion (if coating) Good adhesion after bake out, in vacuum, up to 350°C High resistivity of at least 100 kΩ/□ SEY target value is less than 1.4 Potential Benefits: Reduce/eliminate pressure rise due to high intensity beam Reduced Electrical Breakdown (not yet demonstrated at CERN): Electron avalanche propagates along the surface of dielectric due to high secondary electron yield. M.J. Barnes 28/10/2016 - Polyteknik

UFO´s LS1 Cleaning Procedures: UFOs can lead to beam loss and dump. Plot courtesy of G. Papotti et. al, “Busting UFOs – part 1”, LMC 22/07/2015 UFOs can lead to beam loss and dump. 2015: 3621 UFOs at 6.5 TeV. Signal RS04 > 2∙10-4 Gy/s. T. Baer 2011: 7668 UFOs at 3.5 TeV. 2012: 3719 UFOs at 4 TeV. Grey areas around IRs are excluded from the analysis. LS1 Cleaning Procedures: Insert 4 screen wires; 4 x aller-retour with 10 bar nitrogen (no filter); Rotate tube & insert 4 screen wires; 4 x aller-retour with 10 bar nitrogen (no filter); Rotate tube & insert 4 screen wires; 4 x aller-retour with 10 bar nitrogen (no filter); Rotate tube & insert 4 screen wires; 4 x aller-retour with 10 bar nitrogen (no filter); Rotate tube & insert 4 screen wires; 4 x aller-retour with 10 bar nitrogen (no filter); Rotate tube & insert 4 screen wires; 4 x aller-retour with 10 bar nitrogen (no filter); 6 x aller-retour with 10 bar nitrogen (filter). 10 x aller-retour with 10 bar nitrogen (no filter); 6 x aller-retour with 10 bar nitrogen (filter). (New as of 27/8/2013): 20 x aller-retour with 10 bar nitrogen (no filter); Put new filter in place; 6 x aller-retour with 10 bar nitrogen (filter). Improved cleaning procedure for ceramic tubes implemented during Long Shutdown 1: MKIs have now virtually vanished from the UFO statistics at 6.5 TeV. M.J. Barnes 28/10/2016 - Polyteknik

Influence of SEY of Ceramic Tube The presence of the beam and high SEY, can result in “electron cloud”. Electron cloud results in a pressure rise and limits beam intensity. Hence the need to reduce the SEY of the inside of the ceramic tube (to ≤ 1.4) A new (in 2012) ceramic tube required ~250 hours, with 50 ns beam, to achieve a normalized pressure, in tank MKI8D, similar to the pre-replacement (~4E-24 mbar/p) level. M.J. Barnes 28/10/2016 - Polyteknik

Measured SEY of Cr2O3 samples Note: untreated ceramic has a SEY of ~10 SEY measurements courtesy of H. Neupert & E. Garcia-Tabares Valdivieso Cr2O3 coated side Cr2O3 coating significantly reduces the SEY of the ceramic. Although the Cr2O3 coating has a maximum SEY of > 1.4, it conditions to ≤ 1.4. M.J. Barnes 28/10/2016 - Polyteknik

Resistance/Square of 50nm Cr2O3 Measured resistance, between silver painted edges, of Al2O3 coated with 50 nm thick Cr2O3: ~360 MΩ  ~5 GΩ/□ (i.e. >> 100 kΩ/□). This sheet resistance is OK (good) for LHC injection kickers. 100 mm Next stage for 100mm x 100mm Al2O3 is to carry out high-voltage tests, under vacuum, on: Uncoated sample; Sample coated with 50 nm thick Cr2O3 to determine surface flashover rates, as a function of applied pulse voltage. M.J. Barnes 28/10/2016 - Polyteknik

Drawing courtesy of H. Neupert Next step: test in SPS accelerator Drawing courtesy of H. Neupert Two aluminium “liners” to be coated with 50 nm thick Cr2O3 and installed in the CERN SPS accelerator (early 2017) for testing with beam (SEY, conditioning time, vacuum compatibility). Liners are presently being manufactured and will be shipped to Polyteknik, for coating, mid-November. In parallel, a 60 mm x 60 mm Al2O3 sample, coated with 50 nm thick Cr2O3, is presently undergoing vacuum compatibility tests. M.J. Barnes 28/10/2016 - Polyteknik

Next steps: coating of ceramic tube Assuming that the tests on the samples and liners go well, next stage will be to apply 50 nm thick Cr2O3 to the inside of a ~3 m long, high purity, Al2O3 tube. Goal is to install an upgraded kicker magnet, together with ceramic tube (+… see Lorena’s talk), in the LHC, at start of 2018 (only opportunity prior to LS2). To achieve this goal, a coated ceramic tube would need to be delivered to CERN approx. May 2017…. Gives ~nine months operational experience, in LHC, prior to upgrading 12 injection kickers during LS2 (2019 - 2020). Other potential applications of Cr2O3 (e.g. high voltage electrical insulators). M.J. Barnes 28/10/2016 - Polyteknik