TE-MPE LS1 review Vision from EN-EL(CF)

Slides:



Advertisements
Similar presentations
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Advertisements

Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Upgrade, IST and Powering tests of the 13kA Energy Extraction system Bozhidar Panev – LS1 Review.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
TE-CRG Activities D. Delikaris, TE-CRG.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Mikhail Ovsienko TE-MPE-EE
Magnet activities in SPS during EYETS
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
CONS and HL-LHC day Analysis of needs from TE-EPC
CERN Construction Planning and Scheduling (LHC installation)
Beam Interlock System SPS CIBU Connection Review
Daniel Calcoen TE-MPE-EP
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
TE-MSC activities in SPS during LS2
EYETS LHC 2016/2017 Works EN/EL/CF
Looking back on 2014 and Perspectives for the MPE Group in 2015
EC Activities Status for the LIU
LIU–PLI report LIU SPS meeting.
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
YETS & LS2 Reminder G. Girardot 20 juin 2017.
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
J. Uythoven for the MPE-MI & MS Teams
1v0.
MPE main activities planned for LS2
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
the CERN Electrical network protection system
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Powering from short circuit tests up to nominal
TE-MSC activities in SPS during YETS
LS1 TE/MPE/EE CABLE ACTIVITIES
K. Foraz on behalf of OSS members
Magnet electrical and hydraulic (dis)connections for coating
GIS Portal Racks Project
Business opportunities related to CERN electrical network
Experimental Areas – LS2 planning
ILO Industrial Opportunities Days, 6-7 June 2019
SPS Injection BIS - Draft requirements
Presentation transcript:

TE-MPE LS1 review Vision from EN-EL(CF) Daniel RICCI Section Leader EN-EL-CF Acknowledgments to: Georgi GEORGIEV (Cabling) Consuelo GONCALVES PEREZ (Cabling) Gael GIRARDOT (Cabling) Antonio GONZALEZ PUERTAS (Optical Fibres) Guillaume GROS (Cabling) Jean-Claude GUILLAUME (Cabling) Simao MACHADO(Optical Fibres) 3rd June 2015

Collaboration between TE/MPE and EN/EL(CF) Power cabling (Direct Current) Including Water Cooled Cables (WCC) Signal cabling Copper Optical fibres (through a multi-user infrastructure) Mainly for machine interlocks 3 June 2015 TE-MPE LS1 review - D. RICCI

TE-MPE LS1 review - D. RICCI EN/EL-CF 3 June 2015 TE-MPE LS1 review - D. RICCI

TE-MPE LS1 review - D. RICCI Power cabling Main works requested on Water Cooled Cables LHC commissioning (during LS1) Preparation for SCT (Short Circuit Test) at LHC Pt. 6 and Pt. 8 - Conical connection resistance test 2000 mm2, 13 kA cables and tubes part of the RB, RQF, RQD circuits Additional SCT at LHC Pt. 2, including: Preparation (eg.: short circuit blocks mounting/dismantling, orientation) Resistance test, incl. WCC conical connections tightening Meyrin – Building 377 (Test area) Removal, procurement and re-installation of 2 x 2000 mm2 cross-section WCC Hose replacement, orientation and pressure test RB: bending dipole magnets for the arc RQF: focalising quadrupoles (arc) RQD: de-focalising quadrupoles (arc) 3 June 2015 TE-MPE LS1 review - D. RICCI

Conical connections LHC-P6L (UA63) Preparation for the voltage taps test 3 June 2015 TE-MPE LS1 review - D. RICCI

TE-MPE LS1 review - D. RICCI Feedback Well appreciated Good understanding/flexibility of TE/MPE in scheduling the works requested Working teams cohabitation : efficiency between two services during commissioning tests Availability of teams in case of additional test requested by EN-EL Very good flexibility of TE/MPE team in adapting the switch to 2 WCC polarity inversion (Pt. 3L) To improve Additional action for new SCT in pt 2  aim at more anticipation from TE-MPE WCC converters side: the manipulation by TE/MPE team during TE/MPE commissioning – to prevent water leakage Improve the protection against water projections of very sensitive equipment (to study) We agree in general with the remarks presented by TE/MPE during the Cabling review (cfr. B. Puccio on 17 Feb 2015) 3 June 2015 TE-MPE LS1 review - D. RICCI

Signal cabling (copper) Main requests during LS1: BIC: Beam Interlock Control VTAP IPQ: Individual Powered Quadrupole Works organised by EN/EL in multi-user, CERN-wide, cabling campaigns 3 June 2015 TE-MPE LS1 review - D. RICCI

Signal cabling for IPQ (UJ67) Installation campaign LHC6D-LS12 during LS1 3 June 2015 TE-MPE LS1 review - D. RICCI

TE-MPE LS1 review - D. RICCI Feedback Well appreciated Information (DIC, etc…) were very clear and given in time for EN/EL preparation Very good understanding of our cabling constraints (organization, cable deliveries, workload, etc…) Availability of the TE-MPE team in case of additional questions To improve Some problem (solved) of responsibilities of interlock cables between TE-MPE and TE-MSC on AD site. We agree in general with the remarks presented by TE/MPE during the Cabling review (cfr. B. Puccio on 17 Feb 2015) 3 June 2015 TE-MPE LS1 review - D. RICCI

Optical fibres for TE/MPE systems EN/EL-CF provides and maintains the optical fibre infrastructure for the systems managed by TE-MPE-EP (BIS and SMP) Optical fibre links for BIS system SMP: Safe Machine Parameters 3 June 2015 TE-MPE LS1 review - D. RICCI

Optical fibres for TE/MPE systems Main activities/collaborations during LS1: LHC Radiation sensitive optical fibres replacement campaign BIS system: 3 LHC underground optical fibre trunks were replaced (18 links affected) Good organization with TE/MPE-EP for previous measurements campaigns and final replacement of the fibres TE/MPE-EP tested and put in service again all the links R2E project BIS system - R2E P5: relocation of fibres in USC55  consolidated during LS1 Good anticipation with respect to the expected workload during LS1 3 June 2015 TE-MPE LS1 review - D. RICCI

Optical fibres for TE/MPE systems  Study of implementation of BIS system for Project SBLNF Good collaboration with TE/MPE-EP for establishment of a budget envelop for this project for the system BIS. Information received timely Optical fibre installations in SPS BIS system: Installation of spare fibre links between each BA SMP system : Fibre installation for SMP SPS between BA1 and CCR Nothing to report beside good collaboration and understanding the scheduling constraints during LS1 Troubleshooting requested by TE/MPE BIS system: repair of damaged fibre in BB4 BIS system: troubleshooting on one optical fibre link with a problem in the re- connection campaign UJ33 SMP system: troubleshooting on 2 optical fibre links in SX4 and TZ76. Both were ok, probably just a cleaning issue 3 June 2015 TE-MPE LS1 review - D. RICCI

TE-MPE LS1 review - D. RICCI Feedback Well appreciated Good that TE/MPE is equipped to do a first evaluation test of the optical fibre links in service  this common procedure allows optimising the EN-EL interventions for large fibres systems; To be maintained that EN-EL-CF is contacted to intervene systematically over the infrastructure if a malfunctioning is found by TE/MPE To improve EN/EL and TE/MPE shall work together to centralize the documentation of the optical fibre links for BIS and SMP and to keep it available and up-to-date. EN-EL-CF needs to register in a database (fibrotheque) all the optical fibre links related to BIS, SMP systems. A collaboration will be needed for LS2 EN-EL-CF would like to be kept involved in the definition of the fibre requirements for future development or upgrade projects. 3 June 2015 TE-MPE LS1 review - D. RICCI

TE-MPE LS1 review - D. RICCI Conclusions The collaboration between TE/MPE and EN/EL(CF) is very much satisfactory Very good mutual dialogue and understanding between the teams  essential to maintain for LS2 We greatly appreciated the understanding of the constraints on EN/EL side The job comprises 3 very different technologies (power, signal cabling and optical fibres) each one presenting specific challenges For 13 kA conical joints we agree with TE/MPE suggestions at the Cabling review to setup dedicated training for the teams involved All requested works/troubleshooting during LS1 were achieved with global very good quality Some unplanned works during LS1 could be absorbed also thank to the good flexibility of TE/MPE teams  an asset to be maintained for LS2 TE dep. (HDO, ABT, VSC) also contributed with resources (people) to help  a very positive experience on both sides to be definitely repeated in the future (cfr. Conclusion Cabling review) We identified specific points to improve, which are detailed in the slides EN-EL(CF) would already be very happy if we manage together to maintain the same way of working for LS2! 3 June 2015 TE-MPE LS1 review - D. RICCI

Thank you Ref. TE-MPE revue in Indico: https://indico.cern.ch/event/396125/ Ref. EN-EL-CF cabling revue in Indico: https://indico.cern.ch/event/348896/