Propeller Guard Test Protocol

Slides:



Advertisements
Similar presentations
1 June 22, 2010 Sheila Gropp True-Up Update June 15, 2010 Posting Formula Rate Customer Meeting.
Advertisements

Florida State Board of Education Florida Information Resource Network (FIRN) Status Report March 18, 2003 Tallahassee, Florida Ruben Lopez Chief Technology.
Consolidated Annual Program Evaluation Report FY 2008 THECB 1/2009.
Elsevier |MC Strategies 2009 LMS Strategic Planning November 19, 2008.
The Effectiveness of Guards in Mitigating Propeller Strikes.
How to Profit from Leveraging Customer Life Cycle Segmentation Frameworks for Employee Life Cycle Management.
Algebra 7.3 Solving Linear Systems by Linear Combinations.
Click to add a subtitle 1 expect the best VITA Integration & Transformation Highlights Lemuel C. Stewart, Jr. CIO of the Commonwealth.
Phase Difference = Phase Difference = 0.05.
4.3 Application problems dealing with systems of linear equations.
Elements of Highway Design Highway Design SafetyEfficiency.
Common Core Implementation Update Supporting College- and Career-Readiness DATAG December 2012.
ComScore | AdEffx comScore offers a variety of solutions for advertisers to measure the effectiveness of not only their digital but cross media campaigns.
Division of School Effectiveness Office of Instructional Practices and Evaluations.
NCHPS Fall Meeting CFR Part 37 Update. Reference: IMPLEMENTATION GUIDANCE FOR 10 CFR PART 37 PHYSICAL PROTECTION OF BYPRODUCT MATERIAL CATEGORY.
Evaporative Emissions Standards & Regulations John Adey, Technical Director ABYC.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
Prepared, Not Scared: Second Step to Success Presented to Consumers Energy, Inc. by Michaelene M. Archer.
RICE Project Sebastian Arndt, Kjell Brunnström, Ulrich Engelke, Yasuhiro Inazumi.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
1 Student Assessment Update Research, Evaluation & Accountability Angela Marino Coordinator Research, Evaluation & Accountability.
ITCD Project List as of 8/27/ # PROJECT NAME PROJECT OVERVIEW Alignment to ITCD Strategic Goal(s) Expected Project Completion Projects Not Started.
Writing and Managing Content The Design of Sites: Patterns for Creating Winning Web Sites.
Paint Product Stewardship Initiative Update – May 2007 PSI National Product Stewardship Forum California Integrated Waste Management Board – Glenn Gallagher.
1 EPA Compliant Fuel Systems IBEX Oct 18, 2011 Sean Whelan P.E.
Happy Early Thanksgiving!. Updates: Quiz 10 grades are updated, new average: 76% Last quiz average: 78% Tools of the Light Trade assignment counts as.
OPTN OPTN/UNOS Ethics Committee Spring 2012 Regional Meeting Update Chair, Alexandra Glazier, MPH, JD Vice-Chair, Peter Reese, MD.
The Consumer Audience Part 2: Planning and Strategy Chapter 5.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
NETWORKING COMPONENTS Buddy Steele Assignment 3, Part 1 CECS-5460: Summer 2014.
Module C FDA Regulations Regulatory Documents Patricia E. Koziol 1Module C Final Version 10-apr-2010.
Adding SubtractingMultiplyingDividingMiscellaneous.
Engineering Design Process Brookville Intermediate School 7 th Grade.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
A FIRST LOOK: Information and Issues A FIRST LOOK: Information and Issues Recreational Boating Accident Reporting Manual (COMDTINST M ) Federal Register.
Virtual Business Challenge RETAIL ENVIRONMENT. Staffing, Selling & Customer Service The hiring and managing of employees is a crucial part of a store’s.
The Consumer Audience Part 2: Planning and Strategy Chapter 5.
Project Title/Research Question Name University and Department Add a picture of you!
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
RTWG Report to TAC January 6, 2010 Henry Durrwachter.
New gTLD Program Reviews and Related Work
AS9104/1 Interpretation Consistency Working Group
Lifesaving Equipment & Lifejacket Standards
PFDMA Progress Report by Dorothy Takashina, PFDMA Chair
CMSD Overview of Student Growth Measures
Algebra II 1.7: Solve Absolute Value Equations and Inequalities.

11.3 Solving Linear Systems by Adding or Subtracting
BACK SOLUTION:
Peninsula Clean Energy Board of Directors Meeting
10.7 Solving Quadratic Equations by Completing the Square
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Complying with New Regulations and Standards
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Objective - To subtract decimals.
CYCLE 2019 Application Process & Timeline
We secure the communication
PARCA Timeline.
Software Requirement and Specification
Adding with 9’s.
Adding with 10’s.
Science Fair Timeline 2016.
Adding ____ + 10.
Study for Wednesday’s unit 7 post test
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
IS 551 – Preliminary Schedule
Objectives Improve the in-store shopping experience
Information Sharing Policy Update March 25-26, 2014
Presentation transcript:

Propeller Guard Test Protocol Update John Adey, ABYC

Original Intent How do we evaluate “Guards” What does adding device to do Performance? Does a Device help/harm? Under what circumstances Is it useable under all boating activities?

Program Review Part 1 – Human Factors Part 2 – Boat Characteristics Part 3 – Device durability, practicality Early 2010 Sept. 2006 Sept. 2007 Oct. 2009 Oct. 2009 Early 2010 Timeline is how we are implementing the research, the Milligan-Tennant report listed it in this order. Could add boat protocol 3 and 4. Boat Protocol Boat Protocol II HF Protocol Durability, etc. Consolidated Testing Promulgate

What Will This Do? Create a 3 phase evaluation protocol. Allow Guard-Type units to be evaluated and graded on the 3 elements. Qualify/Disqualify the effectiveness of the solution under varying uses. Universal Safety/Marketing information to be conveyed to potential customers.

Can we have an ABYC Standard? Who Will Manage it? Can we have a USCG Stamp? Can we have an ABYC Standard?

-Possibly- What Will Consumers See? Results of Performance based on speed: Scored 5 out of 5 on Boats under 5mph Scored 2 out of 5 on Boats 5.1mph-15mph Scored .5 out of 5 on Boats 15.1 and up

-POSSIBLE- Results of Human Factors based on use 4 out of 5 on non-moving protection (boarding etc.) 3 out of 5 on 1-5mph 1 out of 5 on 5.1-15mph .5 out of 5 on 15.1 – 20 mph 0 out of 5 on 20.1mph and up.