Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Dec
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
KEK status report S.Tanaka(KEK) 13 th DEPFET workshop 2013/06.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
Mechanics Status VXD Mechanics Meeting F.Buchsteiner (HEPHY Vienna) 07 September 2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Electronics Constraints
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
Service channels between Tracker and PP1
Service channels between Tracker and PP1
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Discussion items SVD mechanics session.
Very preliminary draft
T1 status (a selection from EDR presentations)
Integration issues at IHEP
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Radiation Laboratory Meeting
Average Monthly Temperature and Rainfall

Annex 5: Milestones Action Determine sticker label design / features
Module/Ladder Assembly
SVD Mechanics Group Organization & Work packages
Comments to the SVD4 structure
This Presentation Pack is brought to you by
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
SVD group organization, schedule, milestones
Presentation transcript:

Katsuro Nakamura Sep. 10, 2015 VXD meeting SVD Ladder Mount Katsuro Nakamura Sep. 10, 2015 VXD meeting

Ladder Mount Jigs Ladder-mount jig: Sato-san It will appear after Oct. B2GM, because he is busy for L6 assembly study. Keratherm-attachment jig: Sato-san first prototype by Oct. B2GM We have to check stress on ladder and safety in removing plastic covers of Keratherm.

Set-screw fixation Set-screw fixation tool: Florian Already developed. I will bring it to KEK and test the performance on the ladder mount table.

ORIGAMI cooling pipe ORIGAMI cooling pipe bending: Florian flat bent pipe ORIGAMI cooling pipe bending: Florian Ship flat bent pipes to KEK and PISA will try 3D bending in a couple of months. If it doesn’t work, backup solution is to mount the flat bent pipe. ORIGAMI cooling pipe attachment: Filippo and Florian Tested with the bent pipe after VXD meeting. brought to KEK by B2GM curvature jig idea of 3D bending jig ORIGAMI cooling pipe attachment tool made by Florian

Cabling/piping Cabling/piping: first idea by Suzuki-san and Katsuro Produce and test cable-strain-reliefs on Endflange Another cable-strain-reliefs on the CFRP cone or Endring prepare the first ide by the middle of Oct., and let’s discuss it on the Gemba meeting. Removal of plastic covers on hybrid cables Also labels should be moved. Cable test with a tester before cable connection The most dangerous part (ladder can be lifted up with the cable.) Some strain relief have to be implemented on EndFlange.

Ladder Mount Table Index plate 3D measurement system Considering cable routing, optimize index plate and fixation mechanism. by Oct. B2GM 3D measurement system change the stroke of movable stages. Division of half-structure Setup rails on table Division test Storages of half-structure (Toru) Above tasks are managed by Suzuki-san and Maki-san. After Oct. B2GM, we have to think about closed dry volume for CO2 cooling test. Thermography camera Holes for a lot of cables Division Tool Index Plate Coordinate Measurement System

Collision test Collision test with Class-C ladders Collisions of ladders on endring Collisions of adjoining ladders Collisions of different-layers ladders (Collisions during half-structures combining) We’d like to have ladder collision test on Oct. 27 (Wed.), just after BPAC. For the relevant members from all the sites, please arrange your flight and attend the test L3 and L5 assembly sites have to transport 2 class-C ladders to KEK. Container preparation Exportation procedure preparation

Ladder mount procedure We have to strongly keep in mind the following notices: The number of attachment parts should be as small as possible. Attachment procedure has large risk on ladders. The attachment procedure should be as easy as possible. Above are great lessons from experiences of SVD1 and SVD2 mounting. Steps including destructive risk in ladder mounting 1. Attachment of Ladder-mount adapter on H-shape 2. Attachment of ladder on the ladder-mount jig 3. Ladder mounting on Endring (3.5 Detachment of Ladder-mount adapter???) 4. Fixation of set-screws 5. Cable insertion 6. FOS insertion 7. Fixation of FOS clamp 8. Attachment of Keratherm on APV25 9. Remove of plastic cover on Keratherm 10 Detachment of a couple of FOS clamps 11. ORIGAMI cooling-pipe attachment 12. Fixation of cooling-pipe clamps 13. Attachment of the detached FOS clamps again KEK will try the above proposed procedure with the components by the end of Sep. to know how they are safe or what is risky steps. FOS clamp FOS clamp FOS clamp CO2 clamp The clamps and adapter cannot co-exist together in the current design Ladder-mount adapter

Class-C/D ladders for ladder mount test Two class-C ladders will be prepared for collision check during ladder mounting. interference between adjoining ladders and adjoining layers Preparation status of class-C ladders: L3: Already has two they have screw holes for mounting. L4: has one class-C ladder, and will produce another one L5: has one class-C ladder, and will produce another one L6: has one class-C ladder, and will produce another one If the H-shape doesn’t have screw holes for adapter, we will glue it on the H-shape. Moreover, it is useful to have class-D ladders for more realistic ladder mount test if they are not necessary on the assembly site. The number of class-D ladders L3: none L4: two L5: one without SLM L6: two or more

Total necessity days for ladder mounting 1st Layer 3: 6.0 days 1st Layer 4: 10.5 days 1st Layer 5: 12.0 days 1st Layer 6: 15.0 days Half-layer detachment: 1 day 2nd Layer 3: 7.5 days 2nd Layer 4: 10.5 days 2nd Layer 5: 12.0 days 2nd Layer 6: 15.0 days Total: 90.5 working days ~ 5 months (including contingency)

(We also need these ladders Assembly Schedule based on Tanaka-san’s slide on VXD meeting We have to share the VXD assembly table for assemblies of two VXD systems VXD for phase-2 and BEAST VXD for physics run (phase-3) Panel booth in B1 VXD assembly table start: 2016.Jul. start: 2016.Summer BEAST VXD assembly SVD ladder mount Sensors from each group Class-B ladders 2016:summer at latest (We also need these ladders for DESY beam test) end: 2016.Nov. start: 2017.Apr. 5 months test & storage Install BP, BG monitors and PXD end: 2016.Dec.-2017.Apr. start: 2016.Dec.-2017.Apr VXD assembly for physics run +Cosmic ray test This schedule is based on backward arrangement of tasks . Starting date is not shown in some blocks start: 2018.Apr. end: 2018.Jan Install end: 2018.Jun.

Status Endring gluing: 1st trial of Endring gluing has been done for both FWD/BWD with 1st half of FWD/BWD mockup Endring STYCAST 2850FT + Catalyst23LV Several issues were found from the 1st trial. Remedies for them were applied on jigs. They are now in production. Better jig flatness Controlled alignment with linear bushings 2nd trial of Endring gluing will be done after the production of the modified jigs finishes. FWD: the middle of Oct. or the begin of Nov. BWD: the middle of Dec. Outer cover gluing: 1st trial of outer cover gluing has been done. Araldite2015 2nd trial of outer cover gluing will be done after reproduction of the FWD-BWD support rod. The end of Nov. FWD-BWD support rod

Outer cover gluing We had an exercise of outer cover gluing. The final feature of VXD can be seen! lack of adhesive We had an exercise of outer cover gluing. Araldite2015 we found control of glue mount is an issue for the gluing.

Endring cooling pipe brazing at Welcon We would like to glue the end ring to the CFRP cones before the B2GM in February 2016 and start the preparation of the ladder mount. The brazing of CO2 tubes to the end rings should be finished earlier. I like to assign 3 months for the brazing and examination after the production We need to finish contract at beginning of October. We started discussion with Welcon. Sept. 2015 Oct. Nov. Dec. Jan. 2016 Feb. Contract and test production Jig production, Brazing, test, and delivery End ring gluing ~3 months

End ring T.Tsuboyama (KEK) Test brazing in March 2015 They made test pieces by using an hydrogen brazing oven. A copper based brazing solder (JIS Z3262). Process temperature: ~1100 oC. 3 samples were produced Two channels are made with 3 mm separation. The ∅1.7 mm tube from DESY is used. passed the flow test, leak test and pressure test successfully. Channel A Channel B End ring T.Tsuboyama (KEK) 16 April 2015

End ring T.Tsuboyama (KEK) Brazing oven at Welcon 18 meter The continuous hydrogen brazing oven used by Welcon. http://www.tokyobraze.co.jp/device/ http://www.tokyobraze.co.jp/wp-content/uploads/2013/06/2009_St.pdf End ring T.Tsuboyama (KEK) 16 April 2015

Schedule of SVD structure assembly 2015 Sep. Oct. Nov. Dec. 2016 Jan. Feb. Mar. Apr. May. Jun. Finalize SVD cartridge design and start production 2nd trial of Endring gluing (2nd half FWD mockup Endring) 22nd B2GM 2nd trial of outer cover gluing (beam test) 2nd trial of Endring gluing (2nd half BWD mockup Endring) CMM measurement for the glued FWD-BWD mockup Endring 23rd B2GM Endring gluing (FWD/BWD phase-3 Endring) DESY beam test CMM measurement for the glued FWD-BWD phase-3 Endring 3rd trial of outer cover gluing (phase-2) Outer cover gluing (phase-3) 24th B2GM

backup

Necessary days for Layer 3 mounting Ladder mounting: 1.5 days/ladder including EQA test (noise & calibration measurement) and coordinate measurement Left half: 3 ladders Right half: 4 ladders Thermal test: 1.5 days/half-layer

Necessary days for Layer 4, 5, and 6 mounting Ladder mounting: 1.5 days/ladder including EQA test (noise & calibration measurement) and coordinate measurement Layer 4: 5 ladders/half-layer Layer 5: 6 ladders/half-layer Layer 6: 8 ladders/half-layer Keratherm attachment + ORIGAMI cooling pipe attachment: 1.5 day/half-layer Thermal test: 1.5 days/half-layer

Others Outer cover attachment + Transportation of half-structure from the mount table to a strage: 1 day/half-structure