Follow-up of new design of vacuum flange shielding

Slides:



Advertisements
Similar presentations
Microwave Instability : Importance of impedance model
Advertisements

TDI observations winter break 2012 Thanks to F. Loprete, E. Page, B. Henrist, B. Salvant.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
Very preliminary! E. Jensen, 29-May-08.  Present PS 10 MHz system:  10+1 cavities, 2 gaps/cavity, 10 kV/gap  2.7 … 10 MHz tuning range  longitudinal.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Shielding of the SPS Vacuum Flanges - Design Studies – Update Jose E. Varela and Jaime Perez 21 May 2015.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Dimensions, pressures and temperatures of cryogenic circuits for the SPL U. Wagner TE-CRG.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Longitudinal impedance of new RF fingers O. Berrig, C. Garion, B. Salvant.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Impedance of current TCP compared to new TCP with button.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Wakefield effect in ATF2 Kiyoshi Kubo
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
LCLS-II Optics Release: 26FEB16. What’s new in this release? new cathode-to-L0 (“GUNB”) layout ˃input Twiss from Feng Zhou’s 100 pC beam updated cryomodule.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
New Contributions to the SPS Longitudinal Impedance Model
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
1 st impedance working group meeting Christine Vollinger, Benoit Salvant Mandate Draft proposal for: Structure Procedures List of members Opening discussion.
ECR (SPS Flange Impedance Reduction) Follow up for IWG C. Vollinger 16/08/2016.
Follow up of Soft clamps production & testing Thomas Kaltenbacher & Christine Vollinger LIU-SPS, 26/05/2016 Thomas Kaltenbacher.
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
L. Gentini, A. Bertarelli, F. Carra
IT-4189 Supply and installation of a cryogenic distribution system
Brief Status SPS Prototype PSB Prototype Installed in LS1
Power coupler at DESY & for XFEL
BA6 – crab cavity activities in EYETS
Longitudinal impedance of the SPS
Wideband kickers Mechanical design and Fabrication
Impact of TIDVG problem on LSS5 dump design schedule
Update on HL-LHC triplet fingers
Fast Wire Scanner Prototype Mechanical Design
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Status of Vacuum Flange Shielding/ Comparison of RF-shielding Designs
S1-G Webex meeting Global Design Effort
Measurement of “new” SPS-WS
Hall C Down Stream Beam Pipe And Dump Interface Design
YEAR 7 DANCE.
Also on behalf of V. Senaj & L. Ducimetière
KEK injector cryomodule
THRILLER PROJECT!! Week 1: Week 2: Recap ideas from week 1. Week 1:
Discussion on the TDI impedance specifications
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Impedance working group update 21st August 2013
AIRnet Valves D83 to D158 What to order
Beam dynamics requirements after LS2
LHC Collimator – RF Contact Concept (180o wrap)
Impedance working group update 07th August 2013
Results on RF-Measurements on 3-Convolution HL-LHC fingers
Current impedance issues
Update on the SPS Impedance Model
Presentation transcript:

Follow-up of new design of vacuum flange shielding C. Vollinger, LIU BD WG meeting, 02-March-17 Christine Vollinger

RECAP from last meeting Braided RF-shield for SPS VF was presented in LIUBDWG meeting on 02-Feb-17 and in IWG meeting #7 on 17-Feb-17; Action items to be followed up… 02-Mar-2017; LIU-SPS Beam Dynamics Working Group Meeting Christine Vollinger

Action items to be followed up… (1/2) My understanding: “Pumping port style shield” were selected due to availability for EYETS installation. Due to difficulties with the sliding fingers (as observed for PP installation), they are not an option any more. (is this confirmed?) 2. In IWG, TE/VSC stated that similar design like “braided” shields was rejected about 6 years ago due to problems with individual strand breaking that could cause aperture reduction (if they bend in). See also next slide. Pending action item for TE/VSC to provide information about that study! 3. Time line for the shield decision; how can the information be provided, what exactly is required? RF-evaluation is completed. From impedance reduction point of view, the braided shields are superior. Input from TE/VSC needed! 4. Decision to be taken about the closing of the gasket gap. 02-Mar-2017; LIU-SPS Beam Dynamics Working Group Meeting Christine Vollinger

Action items to be followed up… (2/2) Meeting with TE/CRG expert where similar braid structures are routinely used: in-house experience with suppliers exist and a contact is provided to RF-group. Large variety of braids are nowadays available (see below), diamond size of braid opening can be “freely chosen”. Braids exist in all flexibility ranges (i.e. to allow lateral and longitudinal movements). No breaking was ever observed on the braids even with heavy duty movements (e.g. as bellows protectors). 02-Mar-2017; LIU-SPS Beam Dynamics Working Group Meeting Christine Vollinger

Many thanks! 02-Mar-2017; LIU-SPS Beam Dynamics Working Group Meeting Christine Vollinger