Safety Issues (TF, June 15, 2005)

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
Health and Safety - an update Ian Gillett Safety Director.
5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Organization and Safety Measures for the Installation of.
PETROSAFE Petroleum Safety & Environmental Services Company.
Permit to Work Procedure Document Number: KOC.SA.004
Even More SQA: Work Procedures
School of Engineering & Electronics Safety Presentation.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
International Instruments in Occupational Health and Safety.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
Health and Safety Policy
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Student Induction Sessions October 2008 John Luke Safety Department.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
1 29 June 2011EDMS CERN Greenhouse Gas Inventory – Detector Cooling 1.Background; 2.Status on regulatory requirements; 3.Inventory carried out.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
General Safety Training. Safety Requirements Employees must work safely and efficiently as they perform their campus duties. The employees’ responsibilities.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Fire Prevention Facilities of Building 1 Civil Engineering Department Safety Promotion Project.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Managing Smoke and Emissions. A new system for managing smoke and emissions in Victoria that will provide for coordinated: Investment Service delivery.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
1 Regulatory Reform (Fire Safety) Order 2005: An Insurer’s View Mark Newton Property Technical Manager Royal & Sunalliance Insurance.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Safety Aspects of Agricultural Mechanics
Fort Stanwix National Monument Energy Audit Contract
Some arrangements for personnel safety 1- Procedures for access
Cabling for LHCb Upgrade
Safety Systems for ALICE
NP Hall Visits Guides’ training
IAF TC Report to PAC TC Summary of progress (June 2017)
Electric Vehicles Safety Global Technical Regulation
Equipment simplified model SMR UR safety
Dielectric Oil Installations
East Area Renovation Project team #6 Launch safety agreement
M.Tavlet, H.Taureg - ALICE
A very first look at siting issues
Florida Building Commission Lightning Protection Workgroup
Robert Gomez-Reino Garrido
ASPEC November 2015 Incidents 0 incidents, 0 near misses
Two Safety Requirements :
Radiation Safety Information Management System (RASIMS)
Needed for Team A on -End
Presentation transcript:

Safety Issues (TF, June 15, 2005) INB requests : Radioactive sources : INB requests a list of sources to be used in ALICE Do you have more info concerning your sub-detector ? “Etude Dechets” INB requests that we do an assessment of the waste to be produced by exploitation/maintenance + dismantling Traceability INB requests that we trace the movement of our pieces of detector and equipment + “zonage” Note: The Technical Coordinator holds the overall responsibility for project management, except safety ! The GLIMOS holds responsibility for safety of the experiment by delegation from EP Div.leader. he reports to the DL, he acts on safety issues via the Tech.Coord., He is assisted by Safety Coordinators. Marc Tavlet - GLIMOS

Safety Issues (TF, June 15, 2005) Rack Protection against Fire (latest review requests) : Proper electrical protection (against shorts & over-consumption) of each PCB – who has that ? of each crate – who has that ? of each rack – The limit to 32A is not enough ! Temperature sensor efficient to detect loss of cooling (water) +/- efficient to detect electrical over-consumption not efficient to detect a smoldering fire Smoke detector The only sensor to detect a starting fire Note: The Technical Coordinator holds the overall responsibility for project management, except safety ! The GLIMOS holds responsibility for safety of the experiment by delegation from EP Div.leader. he reports to the DL, he acts on safety issues via the Tech.Coord., He is assisted by Safety Coordinators. Marc Tavlet - GLIMOS

Safety Issues (TF, June 15, 2005) Rack Protection against Fire (ctd) : Collective protection of the room by smoke detectors Fof the racks containing rack-mounted PCs Automatic fire extinguishing system Strongly recommended in racks with low accessibility (zone D) Fire-protection of cable trays ; Do we respect the requirements of IS-48 ? Wall plugging, fire resistance, Not overloaded, accessibility, routing, segregation, Earthing, proper tightening of cables, Protection (mechan. & electr.) of water cooled cables Note: The Technical Coordinator holds the overall responsibility for project management, except safety ! The GLIMOS holds responsibility for safety of the experiment by delegation from EP Div.leader. he reports to the DL, he acts on safety issues via the Tech.Coord., He is assisted by Safety Coordinators. Marc Tavlet - GLIMOS

Safety Issues (TF, June 15, 2005) Visiting Point-2 Many activities these times; Try to arrange visits after 6pm. Private visits discouraged so far. Only VIPs can use PM-25 Dedicated course for Alice guides under preparation; Only accredited guides will be allowed to take visitors at Point-2. Safety courses (induction, for (underground) access to be given by the GLIMOS this late afternoon Note: The Technical Coordinator holds the overall responsibility for project management, except safety ! The GLIMOS holds responsibility for safety of the experiment by delegation from EP Div.leader. he reports to the DL, he acts on safety issues via the Tech.Coord., He is assisted by Safety Coordinators. Marc Tavlet - GLIMOS

Safety Issues (TF, June 15, 2005) Access & Safety Procedure document Document updated, in the course of approval Access & Work Procedures at Point-2 see Sebastien’s part… !! 1 first-aid / team of 10 !! + plan your training needs, asap !! Code A2: Reporting of Accident & “Near Miss” We are asked by SC to promote the use of it. New ALICE Safety web pages Note: The Technical Coordinator holds the overall responsibility for project management, except safety ! The GLIMOS holds responsibility for safety of the experiment by delegation from EP Div.leader. he reports to the DL, he acts on safety issues via the Tech.Coord., He is assisted by Safety Coordinators. Marc Tavlet - GLIMOS

Safety Issues (TF, June 15, 2005) Publicity It is good to publish articles to show the progress of ALICE. It is NOT good to publish pictures where we show that safety rules are not respected ! SF6 According to estimates, Alice (mainly RPCs) will represent ~50% of emission of CERN (~1% of French industry) “The DSOC members felt that ALICE should be encouraged to think about how to recover and/or recuperate the SF6 gas.” Note: The Technical Coordinator holds the overall responsibility for project management, except safety ! The GLIMOS holds responsibility for safety of the experiment by delegation from EP Div.leader. he reports to the DL, he acts on safety issues via the Tech.Coord., He is assisted by Safety Coordinators. Marc Tavlet - GLIMOS