Site Audit Scenario & Antenna Adjustment

Slides:



Advertisements
Similar presentations
Site Survey.
Advertisements

Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
An ISO 9001 certified We offer our services to a wide range of networks such as GSM, CDMA and UMTS networks We Sells SPY Cams & security Cameras We have.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
Land Navigation Module 2 Using a Lensatic Compass.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Radio Network Tuning and Optimization for Universal
CDR Analysis & Investigation Basic Course - Presentation
Numbers
To the Rescue…. Solutions Powered by Are you Ready? …. What happens when there is, NO cellular service NO radio service NO terrestrial services.
ATA - 42 Antenna & Zone Cost Summary Matt Fleming Part B of a two part presentation Part A Antenna & Zone Design Summary Part B Antenna & Zone.
PowerPoint ® Presentation Chapter 3 Site Surveys and Preplanning Preliminary Assessment Safety Site Surveys Preparing Proposals Installation Planning.
Powered By G-2, Plot No. 29, Marudhar Vihar, Near Reliance Fresh, Khatipura Circle, Jaipur , Rajasthan, India Mobile No: ,
Antenna Design Tools VE3KL
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Control Office Site A Site B Site C Site D Site E.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Antennas for GSM System Contents Base station antenna specification and meanings Antenna types and trends.
1 Rover setting for Network RTK (GSM) Trimble 5700.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Test 1: Co-channel interference at the mobile unit
If I was the Government of India, what is the one thing that I would do to make the nation energy efficient? Suggest one way in which Government of India.
Red Rocks Community College ENY 130 Fall 2009 Module 3: Solar Resource.
SAFETY FIRST LAST & ALWAYS Core Safety Values. Mechanical Lifting/Suspended Loads I will never place myself or others under a suspended load.
COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.
Prepared by: Scott Anvick Marc Fontana Gary Yee Christy Woo Ashok Khaturia Chris Doan Ralph Clouden James Pilkington 1 Cheeseman ESA ESCI 63 Updated PV.
Puerto Rico Deployable Radar Network Design; Site Survey Sponsored by: NASA- TCESS-FAR J. M. Trabal (1), J. G. Colom (1), S. L. Cruz-Pol (1), S. M. Sekelsky.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Field Methods 2 When a GPS only won’t do: –Forestry canopies –Canyons (no reception or can’t reach) –Underwater –Small areas when you don’t have a sub-
Summary of SLS for RRM NTT DOCOMO
Smart Repeater Phase 1 Trial
Documentation.
Site Audit Scenario & Antenna Adjustment
Lift up antenna at least 40ft height above the ground.
VC-A70H 4K Ultra HD PTZ Camera
Plan for the installation of the TAMU screen
Small Engine Tool ID Part 1.
Single Site Acceptance Report for TIGO UMTS Project Phase II
Training: Wireless Site Surveys
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
CLUSTER CILEDUK CIPONDOH 1A
SSA Improvement LTE Central Java.
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
NMSU SHOT II WORKSHOP Klipsch School of Electrical and Computer Engineering & Mechanical Engineering Department Jeremy Bruggemann Michelle Chavez Trevenor.
برنامه‌ريزي منابع انساني
Solarize Your School.
Do not work at height without fall protection
How to Process an Interactive GPS Report Training Presentation
Antenna Design Tools VE3KL
THANK YOU!.
Thank you.
Thank you.
Ants use the panoramic skyline as a visual cue during navigation
Where ideas are born, nurtured and grown!
WP2 – Operational Context & Scenario
Advisors: Dr. Katz and Dr. Chang
PIPE SPOOL WLEDING SYTEM – HEAVY VERSION
Engine Part ID Part 2.
BIRDS-4 Computer Aided Drawing (CAD)
Presentation transcript:

Site Audit Scenario & Antenna Adjustment ERICSSON - 4G_LTE_XL ______________________________________________ Site Id : ------- Site Name : LTE_Perintis_Kemerdekaan_Bogor Auditor / Rigger Name : Abdul Jabar patra Last Update : 5 Nov 2015 Site Audit Scenario & Antenna Adjustment

Site Audit Scenario -Antenna Physical Configuration Audit: Site Location Feeder isolation/tapping foto Antenna Height Antenna Type Antenna Orientation Antenna Location Mechanical Tilt Electrical Tilt -Tools and Equipment: Tilt meter, Camera, Altimeter, GPS, Compass - Views: Panoramic Views every 30 degrees

LTE_perintis_kemerdekaan_Bogor Site Id : ------- Site Name : LTE_Perintis_Kemerdekaan_Bogor Long / Lat : 106.78645 / 06.59126 Auditor / Rigger Name : Abdul Jabar patra Last Update : 5 Nov 2015 site id site name sec id Antenna hight Building High Type antenna Ant Direction Mec Tilt Elc tilt Before After - LTE_perintis_kemerdekaan_Bogor 1 11m 12m Tongyu TTB-809016/182017/182017DE-65P 70 11 6 2 220 7 3 320 5

Tower & GPS

BTS & Cable feadder

Buillding & Antenna High

Panoramic View 0 – 90 30 60 90

Panoramic View 120 - 210 120 150 210 180

Panoramic View 120 - 210 240 270 300 330

RRU Sec1 Sec2 Sec3

Antenna Type Sec1 Sec3 Sec2

Antenna View & Azimuth Before Sec1 Sec2 Sec3 70 220 320

Antenna View & Azimuth After Sec1 Sec2 Sec3 70 220 320

Mechanical Tilt Before Sec2 = 1 Sec3 = 0 Sec1 = 11

Mechanical Tilt After Sec2 = 1 Sec3 = 0 Sec1 = 11

Electrical Tilt Before Sec2 = 7 Sec3 = 7 Sec1 = 6

Electrical Tilt After Sec2 = 7 Sec3 = 5 Sec1 = 6

THANKS