Status of works on the Collaboration Contract between IHEP and FAIR

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
A.Levin, IHEP, Protvino, RussiaApril 27, nd PANDA Russia Workshop Status-report on the barrel mechanical design work. A.Levin Institute for High.
Presentation of HanKing
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Hybrid Integrated Circuit
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
1 e lectro m agnetic c alorimeter mechanics emc●mec Corrado Gragiulo, 13 Settembre 2011.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Results of short module and qualification strategy
Development of a low material endplate for LP1 and ILD Dan Peterson, Cornell At previous meetings, , showed the carbon fiber molded.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Full-scale trial results to qualify optimized manufacturing plan for ITER Toroidal Field coil winding pack in Japan Dummy double-pancake (DP) winding was.
Bill Raynor Naval Research Lab
Oleksiy Dolinskyy December 1st, 2014
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
7th Belle II VXD Workshop, Prague
LIU Wire Scanner Milestones June 2017
Complementary ISTC Projects #3888, 3889p
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Mechanics: (Tim).
SciFi option for neutrino target tracker
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Rod adaptors for module tests Module positioning studies
Report on Working Group # 2 The MU2E detector
The 11T cryo-assembly: summary of design and integration aspects
Preparations for test of
Status Brussels GANTRY
Status of the PANDA Solenoid Magnet Production in BINP
CMS Perugia Modules Production Review
Status of the PANDA Solenoid Magnet Production in BINP
Crab – RFD prototype: Fabrication Status Update
Presentation transcript:

Status of works on the Collaboration Contract between IHEP and FAIR Andrey Ryazantsev on behalf of the IHEP-Protvino group

Major milestones for the EMC Barrel Mechanics “Batch 1 of the Pre-Series Slice (PSS-B1) comprises 70 to 80% of the components for the full Pre-Series Slice while batch 2 (PSS-B2) comprises all remaining components to be delivered for the Pre-series Slice.”

Crystals support structure Super Module types #1 #2 #3 #4 #5 #6 #7 (1 module) (3 different modules in each) ( 2 different modules) Beam Proto 120 7(-) 6(-) 5(-) 4(-) 3(-) 2(-) 1(-) 1(+) 2(+) 3(+) 4(+) 5(+) 6(+) 7(+) 8(+) 9(+) 10(+) 11(+) 18 different types of the single carbon fiber alveoli units of 2×4 cells [2×3 cells for 11(+)] (5 units / module)

Single alveoli units production 10 of 18 different type molds are available: from 1(-) through 9(+) 9 of them - from 1(+) through 9(+) - have successfully passed the input acceptance tests at IHEP with the use of the CMM DEA Mistral; type 1(-) is being measured nowadays. Types 2(-) and 3(-) will be ready soon Several single alveoli units of each type from 1(+) through 9(+) were produced (only preliminary cut) and measured with the CMM. The results of the measurements showed a good compliance to the 3D tolerance model. Tools for the precise cutting of the single carbon alveoli units of type from 1(+) through 9(+) were produced, delivered and accepted; production of remaining types is in progress.

Alveoli packs production The assembly devices to glue alveoli packs and to assemble modules of type from 1(-) through 9(+) were produced and delivered to IHEP, 2(-) and 3(-) will be ready soon. Parts of the assembly device of type 8(+) that define geometry correctness of the alveoli packs were carefully measured with CMM. All dimensions are within tolerances. First alveoli pack of type 8(+) was produced. Rear inserts and intermediate plates of type from 1(-) through 3(-) and from 1(+) through 3(+) were delivered and passed the acceptance tests → ready to produce alveoli packs of type 1(+), 2(+) and 3(+). Rear inserts and intermediate plates of type from 4(+) through 9(+) and from 4(-) through 7(-) are expected to be ready at the end of October.

First alveoli pack of type 8(+) 5 single alveoli units were cut precisely with the use of the new cutting tool

First alveoli pack of type 8(+) 5 single alveoli units filled up with the “dummy crystals” and jointed with a glue are in the assembly device with rear inserts and intermediate plates

First alveoli pack of type 8(+) Assembly device is being placed in the oven

First alveoli pack of type 8(+)

Design of EMC Barrel slice (by Valery Ferapontov) Aluminum Support Beam Foam Back Cover Super-Modules Cooling System Side Covers

Pre-series support beam production Three experts from IHEP visited the manufacturing companies in Germany: -Hamburg, GLEICH Aluminiumwerk GmbH & Co/KG Kaltenkirchen -Jena, M&B GmbH Siegmar

Pre-series support beam production Five-axis machine in Jena with a base of 2.5×4.0 m

Pre-series support beam production Tender is required! In case of success, M&B GmbH Siegmar will produce the support beam from an aluminum blank provided by GLEICH Aluminiumwerk GmbH & Co/KG Kaltenkirchen . Expected time: 2 months for the tender procedure, 35 working days - production cycle, ~ 2 weeks for shipping and custom formalities.

Design of front inserts and optical fibers tracing (Suggested by V Design of front inserts and optical fibers tracing (Suggested by V. Ferapontov and A. Levin)

Design of front inserts and optical fibers tracing (Suggested by V Design of front inserts and optical fibers tracing (Suggested by V. Ferapontov and A. Levin) Currently !!! Under discussion with Philippe Rosier

EMC Barrel assembly (by Valery Ferapontov) Technological beam V. Ferapontov needs the technical drawing of the support structure for the pre-series slice assembly and tests to finalize design of the technological beam

Summary and open questions Design of the pre-series slice (uploaded in EDMS) is ready. Waiting for the official approval (Milestone M7 – Final design review for pre-series slice). Almost all technological tools for the alveoli production and modules assembly of all the types were designed, their production is in progress. More than 50% of them were delivered to IHEP, passed the acceptance tests and are currently in use. About 60 % from the volume of crystal support structure to be delivered in the batch 1 is ready. Design of front inserts and fibers tracing - need to solve the lack of space problem. Scenario of the slice assembly – need the revision of existing assembly tools .