Analysis of Heading in Artificially Lifted Wells

Slides:



Advertisements
Similar presentations
E-petroleumservices.com 1 Business Benefits Delivered through True Valve Performance Yvonne Roberts Edinburgh Petroleum Services.
Advertisements

New Gas Lift Products & Technology
WELL PERFORMANCE ANALYSIS
Conductivity Testing of Unsaturated Soils A Presentation to the Case Western Reserve University May 6, 2004 By Andrew G. Heydinger Department of Civil.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering AguaRed.
Analysis of wind energy with pumped storage systems in autonomous islands George Caralis Mechanical Engineer NTUA National Technical University of Athens.
Linearizing ODEs of a PID Controller Anchored by: Rob Chockley and Scott Dombrowski.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
By: Gatut Widianoko Weatherford Artificial Lift Systems
Series-Parallel Combination Circuits
Objectives for Basic Gas Lift Seminar
Chemical Engineering 3P04
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Gas Lift Redesign in Dual Strings Completion
Fundamentals of Data Analysis Lecture 9 Management of data sets and improving the precision of measurement.
The Scientific Method. The Scientific Method The Scientific Method is a problem solving-strategy. *It is just a series of steps that can be used to solve.
Psy B07 Chapter 4Slide 1 SAMPLING DISTRIBUTIONS AND HYPOTHESIS TESTING.
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
Linear Buckling Analysis
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Copyright 2001 SIEP B.V. Online Analysis of Continuous-Flow Gas-Lift Wells Jim Hall – Shell Int’l E&P 10 February, 2004 ASME/API/ISO Gas-Lift Workshop.
PDVSA INTEVEP Accumulation Process and Phenomena in Chamber Lift Completions Sergio Caicedo ASME/API Gas-Lift Workshop Houston, Texas, Spring 2002.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
Background 1. Energy conservation equation If there is no friction.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
Wave Action Theory for Turning of Intake & Exhaust Manifold
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
DC bias circuit effects in CV measurements A.Chilingarov, D.Campbell Lancaster University, UK 9 th RD50 Workshop CERN,
Measuring and Increasing Profit
IPO GLV Throttling Mechanism with Inherent Reverse Flow Checking
Friction Investigating static and kinetic friction of a body on different surfaces.
Boyle’s law Verifying the relation between air pressure and volume measuring air pressure in a closed container. Objective The purpose of this activity.
Introduction to Off Design Simulations
Debugging Intermittent Issues
Agilent Technologies – Installation Training
CSC 421: Algorithm Design & Analysis
CSC 421: Algorithm Design & Analysis
Saudi Aramco – Course in Advanced Fluid PVT Behavior
Online Analysis of Continuous-Flow Gas-Lift Wells
ISO
Debugging Intermittent Issues
CSC 421: Algorithm Design & Analysis
QC checks on composition
GG 450 February 19, 2008 Magnetic Anomalies.
Fundamentals of Chemical Engineering - II
Control System Instrumentation
Active Control of Gas Lift Wells Simulation and Experimental Series
Introduction to Systems Analysis and Design
Free Surface Multiple Elimination
Three cylinders Three identical cylinders are sealed with identical pistons that are free to slide up and down the cylinder without friction. Each cylinder.
INFORMATION TECHNOLOGY PRESENTATION
Gas-Lift Breakout Sessions Fall 2003 Gas-Lift Workshop
CHAIR - JIM BENNETT EXXONMOBIL
Gas Condensate Blockage
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Gas Condensate Blockage
Working Under Pressure
CSC 421: Algorithm Design & Analysis
Computer Vision Lecture 19: Object Recognition III
2001 ASME/API Gas-Lift Workshop
QC checks on composition
Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.
Gas-Lift Valve Flow Performance
QC checks on composition
Presentation transcript:

Analysis of Heading in Artificially Lifted Wells Feb-6, 2002 ASME Gas-Lift Workshop Presented by: Efren Munoz Edinburgh Petroleum Services Americas Inc The idea of this paper is to share some experiences in actual prod-opt projects. Specifically wells exhibiting “heading”. In most fields these wells represent a very high percentage of the field and normally due to the difficulty to model them it is decided to work with stable wells first (show some results) and then work with the “problem” wells.

Introduction Heading creates inefficiency in a continuous gas lift installation This behavior can affect wells in the neighborhood when they share the flowline This needs attention from the operations view point as it generates less production of fluids and more consumption of gas for injection It has to be an important part of any production optimization study as “performance curves” assume perfectly “stable” production conditions This operation/equipment section must be done prior to implement any recommendation from a production optimization study First of all it is important to understand that heading happens and affects wells due to operating conditions when the equipment needs calibration and sometimes because the reservoir is depleting and the well can not keep the same productivity ie: continuous going to intermittent.

Heading Conditions This behavior is very common and it is difficult to model by conventional tools It is necessary to identify the cause in order to try and find the solution.

Modeling of gas-lift installations Are the conventional “steady state” software tools able to diagnose this phenomenon? Being a dynamic situation is the use of dynamic tools mandatory? The conventional steady-state assumes perfectly stable prod conditions, which is very ideal.

Conventional Modeling Procedure The following slides show a procedure using a “steady-state” tool with the ability to model “True Valve Performance” This is an “iterative” methodology and the engineer has to have very good understanding of valve performance, expertise becomes critical at this point The ability to model “true” or “real” gas-lift valves gives the engineers the power to simulate a more realistic situation. This is really a light in understanding non-ideal situations like heading for instance.

Conventional Steady State Analysis CHP= 1120 PSIA By conventional analysis this well would be injecting through the 2nd valve With this ability (true valve modeling) it is possible not only to identify the actual operating valve but also how the others are behaving ie: open or close for a given moment. This well has 4 valves and is injecting through the 2nd, but it is necessary the status of the others too. The Qgi measured on surface is 0.423 MMscf/d

True Valve Performance Modeling To this end the nodal theory is utilized, a “solution” node can be defined at any point within the system In this case the solution node is the valve, an “operating point” can then be defined at each gas-lift valve’s depth giving the engineers a light about valve’s behavior under bottom-hole conditions ie: injection pressure and gas volume This is just a brief introduction of AGVM (true valve performance modeling). It is based in the theory that in a nodal system the user can define a “solution” node where ever is needed.

What Do Valve Performance Curves Look Like ? Data From Valve Performance Clearing House Casing Pressure Note valve does not close at high Pcf 20/64ths Camco R-20 Ptro : 650 psig Typical plot of gas passing through an orifice/valve. Y-axis shows gas volume and X-axis shows casing pressure, there is a throttling region and a critical flow region. Throttling region

How True Valve Performance Data is Used? The main use of valve performance curves in a design software is for a more correct sizing calculation to be performed. Methodology consists of : With the selected valve as the solution node a series of operating point calculations are performed over a range of gas injection rates. This defines a production rate, flowing temperature, tubing and casing pressures at the selected valve for each gas injection rate. An appropriate (selected) correlation for valve performance is then used to determine the gas flow rate through the valve for each combination of tubing and casing pressure and temperature calculated above. Tubing pressure is plotted against gas injection rate for both the well and valve - intersection of the two curves implies compatibility between well and valve design

How True Valve Performance Data is Used? Here AGVM (true valve performance) is shown, where the “inflow” is defined by the available CHP and the “outflow” is defined by the bhfp at the valve’s depth.

True Valve Modeling (1) Using the true gas-valve modeling option, it can be seen that the first valve is also open at CHP= 1120 PSIA Through the first valve 0.269 MMscf/D are passing from the annular to the tubing

True Valve Modeling (2) According to the true valve modeling the second valve is open at CHP= 1120 PSIA Through valve number two 0.653 MMscf/D are being injected

True Valve Modeling (3) Valves number three and four are also open at CHP= 1120 PSIA, but tubing pressure is higher than casing pressure, which activates the check-valve closing them

Injection Gas Balance (valves 1 and 2) 1st VALVE = 0.269 MMSCF/D 2nd VALVE = 0.653 MMSCF/D TOTAL = 0.922 MMSCF/D CONCLUSION: If 0.423 MMSCF/D are injected from surface and both valves allow an injection rate of 0.922 MMSCF/D, then CHP can not be constant at 1120 PSIA, as a consequence CHP will decrease as this is equivalent to have a bigger port working

Sensitivity to Casing Head Pressure (1) Running a sensitivity to CHP, it is possible to see that at 1090 PSIA valve Nbr-1 is closed, a very similar situation happens with valve Nbr-2

Sensitivity to Casing Head Pressure (2) Running a CHP sensitivity it is observed that valve Nbr-2 closes when CHP goes to 1030 PSIA

Dynamic Gas-lift Simulation This dynamic application uses all the equations used by a steady-state gas-lift software but adds the time variable to the system Gas injection volume is a cumulative calculation in such a way that CHP will increase as more gas is being injected The reservoir node honors all the input data already used for the nodal analysis All the dynamic surface settings are translated into bottom-hole conditions using the selected vertical flow correlation, and… True gas-lift valve data is utilized to simulate the real behavior of the valves under bottom-holes conditions

Dynamic Simulation of True Valves 1st and 2nd Valves open at CHP=1095 psia Actual Qgi passing through 2nd valve Valves 3 and 4 open at this CHP but check-valve closed

Dynamic Simulation of Wellhead Conditions Simulating this phenomenon dynamically it is observed that both valves can be closed, but being a continuous injection design the 0.423 MMscf/d injection rate will force the CHP to go up again When CHP goes up again both valves are open and this cycle is repeated periodically This phenomenon is known as Well Heading due to a lack of control on the injection rate, a re-calibration of the gas-lift valves is necessary to remedy this situation

Redesign for the Same Well This redesign has been adjusted dynamically and valves positions verified in the steady state software Looks like there is enough CHP to operate through the deepest mandrel (actually an orifice has been simulated), the shallower valve is closed already, remember that here the software assumes that the unloading process is already finished

Operating Valve Conditions on Bottom An initial iteration would be to run a 10/64” orifice at the injection point, a much better control of the injection can be observed Looks like there is still so much WHP and lowering it would help the well, however this has to be “iterative” with the filed simulation from where WHP will be defined

Testing a tentative solution – Dynamic Simulation For one unloading valve and one 10/64” orifice at the injection point the well looks perfectly stable

Conclusions Heading means inefficiency and needs especial attention to the gas-lift equipment in continuous injection installations Gas-lift valves out of calibration can compromise the success of a production optimization effort Wells exhibiting heading are difficult to simulate with conventional steady state applications, but they can be diagnosed properly provided that “true valve performance” is available and there is a good understanding of valve performance Heading is a purely dynamic situation, a dynamic application for trouble-shooting and solution of the causes of this behavior will always give better results Heading does not mean that a well can not be optimized, it means that the well needs an extra work to ensure the proper operation of the down-hole equipment

Conclusions (cont) The steady-state model is still needed to feed the field model simulator Training becomes critical as tools become more advanced (more complex to use)

Conclusions (cont) Q: Are the conventional “steady state” software tools able to diagnose this phenomenon? A: Yes, provided that they can model “true valve performance” a proper diagnose can be found Q: Being a dynamic situation is the use of dynamic tools mandatory? A: Yes, the only way to understand the cause and try to find and test a solution is to “see” the system working under more realistic operating conditions

Thank you!