Racks in BA6 SPS test stand Integration 5 October 2017.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

PAPER HOUSES Create a 3D House or Cabin.
Beginning to use the language of position. Four children stand in a row. Children discuss who is at the front/first in the row? Who is behind? Who is.
Prisms A prism is a solid that is the same shape all the way a long its length.
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
constructions A Straight Line constructions Task: Task: Construct a line XY of length 5.9 cm. X  Construct a line more than 5.9 cm long (about 8 cm).
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Surface Area and Volume Surface Area of Prisms.
Areas of Rectangles and Parallelograms
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Engineer Training Machine New Features TJ8300 / TJ8500 Machine New Features.
DO NOW V: 0 Date DO NOW Answer
J.Byrne Draw the outer shape of the room to sizes given. J.Byrne
Barriere O, Le Roux P
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Geometry Section 7.4 Special Right Triangles. 45°-45°-90° Triangle Formed by cutting a square in half. n n.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
GENERAL INFORMATION SEATING SEATING CHART Assigned seats With a SUB you stay seated Tardy – is not in the room Bathroom and Water before entering room.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
MS SERIES AT SERIES Valve Housing Cylinder Controlling Valve of Oil Flow - Needle valve is employed to maintain.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Update on the Laser Beam Line
How to set up your paper Fold your paper in half (hot dog style) Measuring from the top you will draw 4 lines at the following measurements: 1 st line.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
V. Bobillier1 Cable installation status.
C H A P T E R Resistance Training and Spotting Techniques.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Using Graphs to Show Information
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
A car travels north at 21 m/s for one half hour. It then travels south at 35 m/s for 10 minutes. The total distance the car has traveled and its displacement.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
Crab cavity test installation in SPS
Open NetSchool:  Title your next journal page “10% Rule Activity”  Read over the instruction slide and wait for instructions. February 22 nd No warm-up.
CC LLRF SM18 test plan and BA6 infrastructure
Proposition de routing des cables :
Plans towards CC in the LHC a US – centric perspective
Schedule CM SPS G.Vandoni.
IT-4189 Supply and installation of a cryogenic distribution system
BA6 – crab cavity activities in EYETS
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
Review on collimator movement with stepping motors
ASTR 110G Section M09 September 30th, 2010
nSW Alignment Installation
SPS CC: Final plan for interlocking of crab cavities in SPS
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Progress Charts.
GIS Portal Racks Project
ACS news Circulator TCU: control tests in progress All cavity racks
Review on collimator movement with stepping motors
Power cut 18kV cable for EMD404/E9 is heating
I C A L I C A L DFME follow-up issue. Page. OPEN POINTS
One point perspective.
LARP Phase II Secondary Rotatable Collimator
Contactor A contactor is an electrically controlled switch (relay) used for switching an electrical power circuit. A contactor is typically controlled.
Digestive System/Body Model
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Hardware integration and interfaces
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

Racks in BA6 SPS test stand Integration 5 October 2017

SPSEY___6001 Rack’s layout LLRF racks IOT racks IOT racks Crab-cavity services racks

Racks in BA6 – not Faraday cage Rack name Type Assignment Contact Supply Action BA6 RA   4224 SPS green (80cm) BE/RF/PM F.Killing CERN install from green rack’s row BA6 RA   4233 cut false floor, reinforce BA 6   RA   4716 standard (90cm) BE/ICS/AS N.Broca EXT displace the present ones to IOTS BA 6   RA   4717 BA 6   RA   4718 (BE/ICS/AS Fire Safety) M.Dole BA 6   RA   4719 BA 6   RA   4720 BA 6   RA   4721 TE/CRG C.Fluder OK BA 6   RA   4722 BA 6   RA   4723 BA 6   RA   4724 BA 6   RA   4725 EN/ACE/SU M.Sosin/T.Dijoud BA 6   RA   4726 Transfer table K.Artoos Racks in Faraday cage Rack label BA6 RA   4246 LLRF P.Baudrenghien DIR/ Installation BA6 RA   4247 “ BA6 RA   4248 Fiber BA6 RA   4249 Oasis BA6 RA   4250

Racks in BA6 – not Faraday cage Rack name Type Assignment Contact Supply Action BA6 RA   4224 SPS green (80cm) BE/RF/PM F.Killing CERN install from green rack’s row BA6 RA   4233 cut false floor, reinforce BA 6   RA   4716 standard (90cm) BE/ICS/AS N.Broca EXT displace the present ones to IOTS BA 6   RA   4717 BA 6   RA   4718 (BE/ICS/AS Fire Safety) M.Dole BA 6   RA   4719 BA 6   RA   4720 BA 6   RA   4721 TE/CRG C.Fluder OK BA 6   RA   4722 BA 6   RA   4723 BA 6   RA   4724 BA 6   RA   4725 EN/ACE/SU M.Sosin/T.Dijoud BA 6   RA   4726 Transfer table K.Artoos Racks in Faraday cage Rack label BA6 RA   4246 LLRF P.Baudrenghien DIR/ Installation BA6 RA   4247 “ BA6 RA   4248 Fiber BA6 RA   4249 Oasis BA6 RA   4250

Integration issues Corrections needed to SPSEY___6001 Racks IOT: front face aligned with the front face of the IOTs and not displaced as on the drawing. Racks for BE/ICS are longer by 10cm (standard length). Change of assignment Some work to do Racks BE/ICS (SPS Fire Safety and ODH): bar for earth to pass underneath the rack such that they can be installed or moved during a run later on. The 2 racks to be displaced to the IOTs will need to be freed from the earth bar. For 5 new standard racks, we need to cut the false floor plates, then reinforce to support the remaining shorter plates. Work will be seen on site with EN/EL, SMB/SE