LAYERED AUDITS.

Slides:



Advertisements
Similar presentations
Checking & Corrective Action
Advertisements

Quality Improvement Level Up Program December 17, 2008.
Transition from Q1- 8th to Q1- 9th edition
ISO 9001 : 2000.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
Overview Lesson 10,11 - Software Quality Assurance
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Environmental Management Systems Refresher
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
FPSC Safety, LLC ISO AUDIT.
Fundamentals of ISO.
BRC Food Safety Quality Management System Training Guide
Introduction to ISO New and modified requirements.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Fast Response Governance Drill Deep and Wide Abel Acuña January 27 th 2010.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
BZUPAGES.COM Iram mumtaz Roll no Quality audit “An audit is a systematic and independent examination to determine whether quality activities and.
Internal Auditing ISO 9001:2015
TOTAL QUALITY MANAGEMENT
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
Layered Process Audits Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
QSB Quality System Basics & Q7 tools in practice
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Control Plan Training.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Software Quality Control and Quality Assurance: Introduction
APQP Five Phase Process
ISO 14001: 2004 Environmental Management Review Presentation
Chapter 11: Software Configuration Management
How to Implement an IG Manufacturing Quality Procedure System
Software and Systems Integration
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Safety Accountabilities
Fundamentals of ISO.
Software Requirements
DSQR Training Control Plans
UNIT-6 SOFTWARE QUALITY ASSURANCE
Global Supplier Quality Early Production Containment Training
Introduction In the first lesson we demonstrated the following:-
Presented By: Daniel J. Brown, CQA
Setting up an Internal Audit Program
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
  Aptiv Global Supplier Quality Early Production Containment Training.
Layered Process Audits
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Regulatory Oversight of HOF in Finland
UNIT-6 SOFTWARE QUALITY ASSURANCE
Chapter 11: Software Configuration Management
RISK REDUCTION PROCESS
QOS QOS Based on FORD’s Quality Operating System 9/19/99
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Chapter # 8 Quality Management Standards
How to conduct Effective Stage-1 Audit
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Global Supplier Quality Early Production Containment Training
Better with Augmented Reality
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Where Safety Strategy Meets Execution
QOS QOS Based on FORD’s Quality Operating System 9/19/99
Presentation transcript:

LAYERED AUDITS

- verify compliance to the documented process - instill discipline LAYERED AUDITS PURPOSE: To provide a system to: - verify compliance to the documented process - instill discipline - improve communication - improve overall quality SCOPE: Assembly Area Manufacturing Operations Shipping/Receiving Repair/Rework Area All Operations and other support functions RESPONSIBILITY: Single Ownership - Plant Manager Supported By - Quality Manager

REQUIREMENTS: Layered Audits shall be conducted for manufacturing and assembly of high risk items at a minimum of once per shift. Frequency of Layered Audits based on production volume or level of risk associated with process. Layered Audits supplement ongoing control plan and job instruction checks. A check list of high risk items to be verified during Layered Audits shall be established. Elements should be considered in developing the check list. (Example)

(Example) Elements

REQUIREMENTS (continued): Layered Audits results shall be recorded. Non-conformities shall be addressed immediately Reaction plan(s) for non-conformities detected during Layered Audits shall be documented and available for use. Corrective actions shall be documented. Results shall be summarized and reviewed by the manufacturing site leadership. Layered Audit documentation shall be compiled in the Lessons Learned (key strategy) database.

REQUIREMENTS (continued): Customer used features shall be identified, listed and checked in the manufacturing process with emphasis on: - Supplier pass through features - Mounting (holes, taps, etc.) - Electrical connections/connectors - Mounting surfaces - Clearances - Missing/wrong brackets - Incorrect parts - Others as identified by customer

REQUIREMENTS (continued): The following is an example of a Layered Audit with three levels of management involved in the process: - The manufacturing supervisor shall verify (daily) all quality documentation is completed by operators. - The manufacturing area manager shall verify (weekly) that supervisor verification is being completed. - Site leadership shall conduct layered audits at a frequency defined locally.

QUALITY ELEMENT: LAYERED AUDIT Example GMPT model REACTION (Special Cause Prevention (Common Cause) PFMEA RPN REDUCTION CUSTOMER CONCERNS External- PRR’s, etc Internal TEAMS Cross Functional Shainin AUDIT THE PROCESS 8 STEP Corrective Action P. F. M. E. A. Formal Line item document -Items Checked daily - Is the system working? CONTROL PLANS -12:15p.m. Report outs -Fast Response What’s critical to the process? AUDIT % COMPLIANCE JOB INSTRUCTIONS -Data Collection -Participation -Responsiveness -Integrity -Standardized Work RESULTS -Quality Improved -Quality Stabilized

LAYERED AUDIT MATRIX (Example)

(Example)

(Example)

(Example)

(Example)