MIPI Changes October 2012.

Slides:



Advertisements
Similar presentations
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
Advertisements

Transmission Workstream – 6 th May 2010 National Grid EU Transparency Project Update Chris Shanley.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
POI to MIS Transition PR0066_01. 2 Project Details Purpose: Decommission the POI (Planning and Operation Information) site and move all identified documents.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
Market Information Provision Initiative Phase 2 Nolan Robertson Market Information Team Leader.
Transfer & Trades Special Transmission Workstream
New tariffs system in France GTE 23 rd October 2003 Jacques Laurelut.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MIPI European Transparency Project (ETP) 10 th September 2010.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Phase 3 Customer communications
Congestion Management
Transmission Workstream 6 January 2011
Moffat - Capacity System Entry Point
New transparency guidelines
EU Tariffs Code Update Based on Refined Draft as of 30th October
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
EU Implementation Programme
Transmission Planning Code – Draft Document
2009 TSO Transparency Gas Regional Initiative North-West
MIPI Energy – Daily Reports
CMP Transparency Requirements
Transmission Workstream, 6 August
Proposer: National Grid NTS Panel Date: 17th April 2014
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Richard Fairholme Transmission Workstream, 2nd October 2008
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Update on Exit Capacity Substitution and Revision
Enduring NTS Exit Capacity Arrangements - Update
Transmission Workgroup 6th March 2014
Transmission Planning Code Review
Mod 0621 Amendments to Gas Transmission Charging Regime
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
Modification 501 slides for Workgroup
DN Interruption & Charging
Long Term Non Firm Capacity Update
EURELECTRIC transparency requirements
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
Publication of UK Wholesale Gas Market Liquidity Data TR 1099/1100
Richard Fairholme Transmission Workstream 4th September 2008
Reinstatement of NTS Interruption
Transmission Workstream - EU 3rd Package Update
DAILY CAPACITY PUBLICATION
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Stefan Leedham Transmission Workstream 2nd November 2006
Market Information Provision Initiative (MIPI) Phase 2
Gemini Contingency Guidelines
Transmission Workstream 05 November 2009
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

MIPI Changes October 2012

Background NTS Exit Capacity regime moves from the “Transitional” to the “Enduring” period on 1st October 2012 New data items and reports are being added to MIPI in line with this change Some current data items and reports are being re-named or discontinued Publish gas transmission data as specified by the EU 3rd package obligation Publish obligated Exit data to the EU Transparency Platform Publish non-obligated Exit data 2

Data Item Explorer New Exit Capacity Data Items Availability Constraint Daily Price Each query can be broken down by Location New “Exit Capacity” node which contains data sent from GEMINI after 30th September 2012 3

Data Item Explorer Exit Capacity (prior to October 2012) Previous Type New Exit Capacity Node Exit Capacity (prior to October 2012) Capacity Trading Analysis (NORM26) Report Entry Capacity Trading Analysis Exit Capacity Trading Analysis* Existing “Exit Capacity” node is renamed to “Exit Capacity (prior to October 2012)” It contains Exit data that was in the Capacity Trading Analysis (NORM26) prior to October 2012 *Updated until 30th September 2012 4

Report Explorer Report Explorer New Exit Capacity Reports Availability Constraint Daily Price New Node New Reports New Reports accessed via Exit Capacity Publications New Exit node is named “Exit Capacity – Daily Reports” Existing “Capacity – Daily Reports” node is renamed to “Entry Capacity –Daily Reports” Reports decommissioned from 30th September 2012 (in Report Explorer): Exit Capacity Booked (NORD04a)* Future Exit Capacity Booked (NORD04b)* *data items accessible for a 5 year period in Data Item Explorer 5

Exit Capacity Publications New Reports include: Long Term Summary Firm Exit Capacity Assignments Firm Exit Capacity Transfers Firm Exit Capacity Buybacks – Forwards Firm Exit Capacity Buybacks – Options Existing Menu “Exit Capacity Application Publications” is renamed to “Exit Capacity Publications” 6

ENTSOG New Exit data sent from MIPI to ENTSOG Transparency Platform: Interconnector Exit Point Data Long Term Firm Capacity Scaleback Restoration Tariff Data Link to the ENTSOG platform: www.gas-roads.eu 7

Price Data Some additional non-obligated data items are included as they are considered to be consistent with Entry Capacity. These include: Day-Ahead, Within-Day and Off-Peak Price data Max/Min Prices Weighted Average prices (WAP) 8

Timeframe 22nd – 23rd September 2012: Menu structures to be implemented 1st October 2012: Capacity Exit data will go live and new menu structure will be available to use More detailed information on the new data items and lists will be published via the National Grid Operational data page prior to implementation

Web pages & Contacts Exit Capacity Applications/Auctions/Information 01926 654058 nts.exitcapacity@nationalgrid.com National Grid NTS exit capacity Web page http://www.nationalgrid.com/uk/Gas/OperationalInfo/excap/ Use of Data item explorer / Report explorer Sysop.centre.reporting@nationalgrid.com MIPI http://www.nationalgrid.com/uk/Gas/Data 10