TDC Testing Status Edge Detector test for up to 7 hits per channel:

Slides:



Advertisements
Similar presentations
1 JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Advertisements

A Low-Power Wave Union TDC Implemented in FPGA
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago November 11, 2014 Board Review.
Introduction We propose a design of Level-1 trigger and readout chain for the upcoming J-Parc experiment that supports trigger rates in excess of 100 KHz.
MB, 9/8/041 Introduction to TDC-II and Address Map Mircea Bogdan (UC)
Mircea Bogdan, 5/21/041 Chicago TDC Design and Implementation Mircea Bogdan (UC)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
TDC for SeaQuest Wu, Jinyuan Fermilab Jan Jan. 2011, Wu Jinyuan, Fermilab TDC for SeaQuest 2 Introduction on FPGA TDC There are.
PROCStar III Performance Charactarization Instructor : Ina Rivkin Performed by: Idan Steinberg Evgeni Riaboy Semestrial Project Winter 2010.
Mircea Bogdan, NSS2007 Oct. 27-Nov.3, 2007 – Honolulu, Hawaii1 Custom 14-Bit, 125MHz ADC/Data Processing Module for the KL Experiment at J-Parc M. Bogdan,
1 Pulsar Design Mircea Bogdan Level 2 Pulsar - Production Readiness Review Friday, Nov.7, 2003.
11/5/2015Mircea Bogdan1 Annie’s Central Card Status Report - 9/18/2015 The University of Chicago.
9 th Workshop on Electronics for LHC Experiments 2 October 2003 P. Antonioli (INFN/Bologna) A 20 ps TDC readout module for the Alice Time of Flight system:
Status and Improvements of TDCB project TDAQ working group meeting Andrea Burato (INFN Pisa) On behalf of TDCB working group.
1 FADC Boards for JPARC-K Preliminary Proposal Mircea Bogdan November 16, 2006.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
PROCStar III Performance Charactarization Instructor : Ina Rivkin Performed by: Idan Steinberg Evgeni Riaboy Semestrial Project Winter 2010.
LHCb Outer Tracker Upgrade Actel FPGA based Architecture 117 januari 2013 Outline ◦ Front end box Architecture ◦ Actel TDC ◦ Data GBT interface ◦ Data.
Testing Setup Top dark box : Avalanche LED driver, 100ps pulse jitter, Fast response LED Triggering from generator Optical Fibre Bottom Box MCP, TORCH.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
St Petersbourg June  CAP COMET (Compressor for e tracking) Overview.
TDC status and to do 1. Status of TDC design 2. List of future activities.
Straw readout status Run 2016 Cover FW SRB FW.
Common Readout Unit (CRU) workshop CERN Mars 2016
"North American" Electronics
Novosibirsk, September, 2017
CLAS12 DAQ & Trigger Status
vXS fPGA-based Time to Digital Converter (vfTDC)
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
The Totem trigger architecture The LONEG firmware archtecture
14-BIT Custom ADC Board Rev. B
Cluster Block Status Report
HyperTransport™ Technology I/O Link
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
TDCB status Jacopo Pinzino, Stefano Venditti
The University of Chicago
90-30 DeviceNet configuration
Run experience Cover FW SRB FW DAQ and monitoring
QUARTIC TDC Development at Univ. of Alberta
MaPSA-Light Chip Test setup firmware Brown: M. Narain and others
14-BIT Custom ADC Board JParc-K Collaboration Meeting
Torsten Alt, Kjetil Ullaland, Matthias Richter, Ketil Røed, Johan Alme
Front-end electronic system for large area photomultipliers readout
7/10/2017 John Podczerwinski, Horatio Li
14BIT 125MHz ADC Board for JPARC-K Status Report Mircea Bogdan August 9, 2007 The University of Chicago.
LCLS Timing Outline Scope The order of things
Serial Communication Interface: Using 8251
Example of DAQ Trigger issues for the SoLID experiment
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Changes from TDC Rev.B to TDC-VME64
CC DEVELOPMENT PROGRESS and SCHEDULE
Status of GbE Peripheral Crate Controller
LHC Beam Loss Monitoring System
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
LCLS Timing Outline Scope The order of things
RPC Front End Electronics
Control requirements from sub-detectors Results of the ECS to front-end interface questionnaire André Augustinus 18 May 2000.
RPC FEE The discriminator boards TDC boards Cost schedule.
August 19th 2013 Alexandre Camsonne
ZDD status BESIII Collaboration Meeting, September 2012
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
The QUIET ADC Implementation
ASD-TDC joint test with MDT-CSM
Presentation transcript:

TDC Testing Status Edge Detector test for up to 7 hits per channel: The boards seem to work fine, some problems: - Last compilation has few timing warnings(XFT Block), unsure if is causes problems of not… have to fix that… - Sometimes… odd configuration problems …changed JTAG Chain from 4 devices to 2x2 devices on one board …have to look into that… - Some problems with the Test-clock/Backplane: no L1A at some buffers… CBLT32/64 transfers tested, using MVME2301(scope plots): - 416 Bytes(CBLT32) - 22.83 us on *AS line => 18.22 MB/s; - 416 Bytes(CBLT64) - 11.60 us on *AS line => 35.86 MB/s. To do: - Repeat the test with new Crate CPU? - Finish CBLT64 firmware (same number of Bytes for 32/64, etc.,…) - Write and perform CBLT64 multi-million, automated test (Sasha). Mircea Bogdan, 10/05/04

TDC Testing Status 3. LVDS Pulse tests using Altera Dev. Board as Test Pattern Generator. The "edge-detected" pulse widths and time intervals between pulses seem to be fine. See transcript (uncommented). 4. XFT Tests: new firmware seems to work fine (see Sasha). Prepared Board 4 and Board 5 for testing at Fermilab. Mircea Bogdan, 10/05/04