CHAPTER 5 TECHNICAL ANALYSIS.

Slides:



Advertisements
Similar presentations
TECHNICAL ANALYSIS.
Advertisements

 Meaning: Establishment of an industry at a particular place.  It refers to the choice of region and the selection of a particular site for setting.
MBA (Trimester) Term V Module Title : Project Finance and Management
Location Strategy and Layout Strategy
INDUSTRIAL & SYSTEMS ENGINEERING
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Islamic University of Gaza Faculty of Commerce Department of Economics Feasibility Studies and Projects’ Evaluation Prepared by Mohammed Othman 2014.
Setting up Enterprise NextEnd. Introduction Setting of an enterprise is a complex process. Various institutions and organizations are providing training.
Decision-Making. learning objectives the scope of decision-making the seven steps of the decision-making process relevant costs examples of practical.
Chemical Engineering Department
Operations Management
Project Planning and Capital Budgeting
Introduction Operations Management Intermediate Business Management.
Technical viability Part 3. introduction The possibility of implementing the proposed project in terms of engineering and technical through the study.
Introduction to Business 3e 9 Part III: Management Copyright © 2004 South-Western. All rights reserved. Improving Productivity and Quality.
Preparation of Project Report for Bank Finance. POINTS TO BE COVERED IN THE PROJECT REPORT  Techno Feasibility Report  Introduction  Executive Summary.
Studi Kelayakan (Feasibility Study)
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Course of MT- 362 Material Handling Lecture # 1. Course Outline.
The basic Legal Aspects of Public Private Partnerships (PPPs) by Alexander Lykourezos Lykourezos Law Offices 1 st ARAB-GREEK ECONOMIC FORUM Athens, September.
FOOD ENGINEERING DESIGN AND ECONOMICS
DO NOT COPY Chapter 6 SERVICES LOCATION AND DISTRIBUTION.
UNIT – III DESIGN OF PRODUCT, SERVICE AND WORK SYSTEMS.
Learning Objectives -To understand the need for flexibility - to know the different methods of production used by businesses. LEARNING OUTCOME -Define.
Project Management It is a specialized branch of management capable of differentiation from others based on a variety of factors which includes the organization.
ENTERING FOREIGN MARKETS FRANCHISING LICENSING EXPORTING MANAGEMENT CONTRACTS FOREIGN DIRECT INVESTEMENT.
Primary Objective First and foremost important objective of technical analysis is to see whether the project idea is feasible or not from technical point.
NS4054 Fall Term 2015 Fuels Paradise, Chapter 3 Potential Policy Responses to Energy Insecurity.
Dr. Mohamed Riyazh Khan DoMS
Understanding Financial Management
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Project Planning, Analysis and Management. Market viability What is market viability? The aim of this study is to measure the market and calculate as.
Contents Introduction Product. Production. Management. Production and Operations Management an Overview. Definition of Production Operations Management.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Slide 1 Material Handling Equipment Selection  2000 Rahul S. Deshpande Material Handling Equipment Selection.
Production Planning and control – ME 1009 Unit 1 Introduction.
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
Dr. R Bista Ms Gyan Laxmi Shrestha Basic Administration Project 2017
How to start an Industry
Purchasing Suppliers.
INTRODUCTION TO BUSINESS
Materials & Logistics Management
Introduction to HUMAN RESOURCE MANAGEMENT
The operations challenge
Feasibility Study for Thermoforming Production Plant
The Feasibility Study: something we already know
LIFE CYCLE OF A PRODUCTION SYSTEM
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Overview Chapter interested in the various policy responses during periods of heightened concern about energy security Need to have explicit framework.
Fundamentals of Information Systems, Sixth Edition
FEASIBILITY ANALYSIS, PROJECT REPORT AND BUSINESS PLAN
Setting up Enterprise End Next.
OPERATIONS PROCESSES.
MGT601 SME MANAGEMENT.
Developing Global Marketing Strategies
Communication and Consultation with Interested Parties by the RB
UNIT – OPERATION STRATEGY
Chapter 13: Systems Analysis and Design
QE 107: Workshop Technology Section 5: Manufacturing Organisation
Transfer of Medical Devices Manufacturing Technology
PROJECT REPORT PREPARATION
Factors Influencing Cost of Production
ART OF PREPARATION AND PRESENTATION OF PROJECT FEASIBILITY REPORTS
UNIT 1 B ROLE OF ENTREPRENEUR.
Of Financial Management Traditional View Modern View Objective of Financial Management Scope of Financial Management Relationship of Finance with other.
Inter company relations and purchasing policy
Dr. R Bista Ms Gyan Laxmi Shrestha Basic Administration Project 2017
Overview Chapter interested in the various policy responses during periods of heightened concern about energy security Need to have explicit framework.
MANAGEMENT SCOPE IN DIFFERENT AREAS
Presentation transcript:

CHAPTER 5 TECHNICAL ANALYSIS

Outline Manufacturing Process / Technology Technical Arrangements Materials and Inputs Product Mix Plant capacity Location and site Machineries and equipments Structures and Civil Works Environmental Aspects Project Charts and Layouts Project Implementation Schedule Need for Considering Alternatives

Manufacturing Process/Technology For manufacturing a product / service often two or more alternative technologies are available . The choice of technology is influenced by a variety of considerations: Choice of Technology The choice of technology is influenced by a variety of considerations Plant capacity Principal inputs Investment outlay and production cost Use by other units Product mix Latest developments Ease of absorption

Technical Arrangements   Satisfactory arrangements must be made to obtain the technical know-how needed for the proposed manufacturing process. When collaboration is sought, inter alia, the following aspects of the agreement must be worked out in detail. The nature of support to be provided by the collaborators during the designing of the project, selection and procurement of equipment, installation and erection of the plant, operation and maintenance of the plant, and training of project personnel Process and performance guarantees in terms of plant capacity, product quality, and consumption of raw materials and utilities. The price of technology in terms of one time licensing fee and periodic royalty fee. The continuing benefit of research and development work being done by the collaborator. The period of collaboration agreement

The assistance to be provided and the restrictions to be imposed by the collaborator with respect to exports. If the technical collaboration is backed by financial collaboration, the level of equity participation and the manner of sharing management control. Assignment of the agreement by either side in case of change of ownership. Termination of the agreement or other remedies when either party fails to meet its obligation Approach to be adopted in force majeure situations.

Material Inputs and Utilities An important aspect of technical analysis is concerned with defining the materials and utilities required, specifying their properties in some detail, and setting up their supply programme. Materials and utilities may be classified into four broad categories: Raw materials Processed industrial materials and components Auxiliary materials and factory supplies Utilities

Product Mix The choice of product mix is guided by market requirements. In the production of most of the items, variations in size and quality are aimed at satisfying a broad range of customers. While planning the production facilities of the firm, some flexibility with respect to the product mix must be sought.

Plant Capacity Plant capacity (also referred to as production capacity) refers to the volume or number of units that can be manufactured during a given period. Plant capacity may be defined in two ways: feasible normal capacity and nominal maximum capacity. Several factors have a bearing on the capacity decision: Technological requirement Input constraints Market conditions Resources of the firm Governmental policy

Location and Site Location refers to a broad area; site refers to a specific piece of land. The choice of location is influenced by a variety of considerations: Proximity to raw materials and markets Availability of infrastructure Labour situation Governmental policies Other factors

Machineries and Equipment The requirement of machineries and equipment is dependent on production technology and plant capacity. It is influenced by the type of project. For a process-oriented industry, like a petrochemical unit, machineries and equipments required should be such that the various stages are matched well. The choices of machineries and equipments for a manufacturing industry is somewhat wider.

Structures and Civil Works Structures and civil works may be divided into three categories: Site preparation and development Buildings and structures Outdoor works

Environmental Aspects The environmental aspects of projects have to be properly examined. The key issues that need to be considered in this respect are: What are the types of effluents and emissions generated ? What needs to be done for proper disposal of effluents and treatment of emissions ? Will the project be able to secure all environmental clearances and comply with all statutory requirements ?

Plant Layout The important considerations in preparing the plant layout are: Consistency with production technology Smooth flow of goods from one stage to another Proper utilisation of space Scope for expansion Minimisation of production cost Safety of personnel

Schedule of Project Implementation As part of technical analysis, a project implementation schedule is also usually prepared. For preparing the project implementation schedule the following information is required: List of all possible activities from project planning to commencement of production. The sequence in which various activities have to be performed. The time required for performing various activities. The resources normally required for performing various activities. The implications of putting more resources or less resources than are normally required.

The Need for Considering Alternatives There are alternative ways of transforming an idea into a concrete project. These alternatives may differ in one or more of the following aspects: Nature of project Production process Product quality Scale of operation and time phasing Location

Key Project Inter-linkages Financial Requirements Product / Service Demand Size Technology Location Selling Price Production Costs Financial Requirements Investment Outlay Profitability

SUMMARY For manufacturing a product/service often two or more alternative technologies are available. The choice of technology is influenced by a variety of considerations: plant capacity, principal inputs, investment outlay, production cost, use by other units, product mix, latest developments, and ease of absorption. Satisfactory arrangements have to be made to obtain the technical know-how needed for the proposed manufacturing process. An important aspect of technical analysis is concerned with defining the materials and inputs required, specifying their properties in some detail, and setting up their supply programme. Materials may be classified into four broad categories: (i) raw materials, (ii) processed industrial materials and components, (iii) auxiliary materials and factory supplies , and (iv) utilities. The acquisition of technology from some other enterprise may be by way of (i) technology licensing, (ii) outright purchase, or (iii) joint venture arrangement. Appropriate technology refers to those methods of production which are suitable to local economic, social, and cultural conditions. Several factors have a bearing on plant capacity decision: technological requirements, input constraint, investment cost, market conditions, resources of the firm, and governmental policy.

The choice of location is influenced by a variety of considerations: proximity to raw materials and markets, availability of infrastructure facilities, and other factors. Once a broad location is chosen, the attention needs to be focused on the selection of site – a specific piece of land where the project would be set up. The requirement of machinery and equipment is dependent on production technology and plant capacity. Further, it is influenced by the type of product. Structures and civil works may be divided into three categories : (i) site preparation and development, (ii) buildings and structures, and (iii) outdoor works. A project may cause environmental pollution in various ways. Hence the environmental aspects have to be properly examined. Once data is available on the principal dimensions of the project, project charts and layout may be prepared. The important charts and layout drawings are : (i) general functional layout, (ii) material flow diagrams, (iii) production line diagram, (iv) transport layout, (v) utility consumption layout, (vi) communication layout (vii) organisational layout, and (viii) plant layout. As part of technical analysis, a project implementation schedule is also prepared. The work schedule reflects the plan of work concerning installation as well as initial operation.

There are alternative ways of transforming an idea into a concrete project. These alternatives may differ in one or more of the following aspects: nature of project, production process, quality of products, scale of operation, time phasing, and location.