Report to: Overhaul Plating 1 2017.

Slides:



Advertisements
Similar presentations
MAINTENANCE MANAGEMENT Module 9
Advertisements

Neo Hungary Kft. Project: Construction of the Production Facility in ISD Dunaferr, Dunaújváros, Hungary Beginning of the construction: June 2010 Finish.
Above Ground Storage Tanks &
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
A world leader of innovative bathroom products Maximize style. Maximize Savings. Save the Environment Installing the Replacement Seal on the Sydney Tank.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
16 Flat ledges on the open truss ceiling are sites where dust and dead insects can collect and fall onto exposed product. Solution: Clean these areas on.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
INTERIOR WALL FINISHES
Constellation House Condominium 2009 Annual Meeting of Unit Owners April 18 th, 2009.
A sad but true story of Dosti Flamingos. Very beautiful from the outside…
What do you think is made of iron? Iron does go rusty, it flakes away, which allows more iron to rust. Rust = Corrosion.
ANCIT WORKSHOP Torino, March 1998 Conversion to simple underground facility network under modern underground facility technologies Taishi Deguchi.
Introduction to a pit installation
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Roof and Ceiling Framing
Astor Theatre Renovations & FOTAA Visit May-September
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Wet Area Linings Part 3 – Flooring & Other Details M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.
Rubbish Hook SECTION: Tools and Equipment ISSUED: REVISED: ##-####
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
VELOPEX EXTRA - X Mk 1V Automatic dental X-ray film Processor
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
AHU-18 replacement and AHU-16 & 17 restoration
Floods in the Lab “In nature, floods are acts of God, but in the chemical laboratory, floods are preventable accidents that still happen.” – Bruce D. Pollard.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
Floors, walls, and ceilings: Materials must be smooth and durable for easier cleaning Must be regularly maintained 9-3 Interior Requirements for a Safe.
An Introduction to Cathodic Protection. The Problem Water and de-icing salts along the splash zone of the abutment walls to this roadbridge have caused.
Best waterproofing solutions for your home. The best way to be prepared for monsoon and winters is prepping and checking your plumbing system, roof.
Brownfield Site Visits An Assessment of Safety and Health Hazards Johanna Hollingsworth, MPH HCI-ATL, LLC. Germantown, MD May 7, 2008.
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Framing Vocabulary Stud: upright beams in the framework of a building
Unit 37: Fluid containment Dr
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Definition of Corrosion
Heating, Ventilating, and Air Conditioning
Design of a Commercial Shopping Center
(Business Professional)
ET 494: Senior Design Design of a New Hammond Head Start Center
LHC Civil Engineering Activities for YETS – LS2
Drain Problem Report Pearl Of Naithon 23th April
Calderglen High School
CHANNEL DISTRICT ACTION TEAM
Unit 37: Fluid containment Dr
The Important Aspects of Swimming Pool Maintenance
Potential sources of asbestos in buildings
Heating, Ventilating, and Air-Conditioning
Fuel Supply System Service
Minuteman Vocational Technical Regional High School Progress
Annex 5: Milestones Action Determine sticker label design / features
Progress Report 11/10/11.
Energy Transformations
Calderglen High School
November technical stop activities:
STEEL PLATES.
Far Experimental Hall - Hutches
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
BIOGAS PLANT.
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Report to: Overhaul Plating 1 2017

Overhaul Plating 1 - 2017 Background Base frame is corroded, already partially broken (Safety) Repetitive problems in Transporter 2 Unclean area below plating tank Water flooding to outside plating line Scope of Work Dismantle + Reinstall Plating tanks Replace Steel base tank with Concrete base tank + FRP coating Replace Transporter 2 Check and replace Mechanical and Electrical parts Construct water gutter and embankment Cleaning Plating area, Repainting + recoating Plating frame, Repainting inner wall Cleaning Scrubber and ducting Overhaul Cost Civil work IDR 167.460.000 (concrete base, gutter, embankment, floor coating) Machine Overhaul IDR 260.855.000 (Dismantle+reinstall, mechanical+electrical parts) Grand total IDR 428.315.000

Overhaul Plating 1 - 2017 General Schedule Activity Feb ruary March April May Jun Jul W1 W2 W3 W4 W5 W 2 W 3 W 4 W 1 Line checking Design base tank Quotation EA/PP/PO Move Production to Plating 6 Dismantling tanks Civil works Overhaull Instalation Trial running SOP Ramadhan month

Overhaul Plating 1 - 2017 Rust Base Tank Photos Overhaul Benefit Reduce line stop due to broken frame and other problem,also lengthen machine life time. Eliminate safety issues : broken frame leads to tank falling and acid chemical pour over the floor. Improve cleanliness and tidyness (2S). Additionalfloor leveling (slope), embankment and gutter to ensure the water on the floor can flow to the pit.