DCPP Performance Based on NRC Performance Indicators

Slides:



Advertisements
Similar presentations
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Advertisements

Lesson 38 Shipboard Power
Patrick Walsh Nine Mile Point – Human Performance HPRTC Conference -June 10 Improving Administrative Procedure Use and Adherence.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – Safety approach Madrid, November Sophie EHSTER.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Stockholm, May Sophie.
Controlling Hazardous Energy
Source: NRC Flickr Gallery, Courtesy Entergy Nuclear UCS Backgrounder on Pilgrim’s January 27, 2015 Event February 3,
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
HPT Rev. 1 Page 1 of 22 TP-1 TVAN Technical Training Health Physics (RADCON) Initial Training Program Radiological Control Current Concerns and.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Prime Responsibility for Radiation Safety
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
The Reactor Oversight Process: Development and Results Tom Houghton Nuclear Energy Institute September 20, 2005.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
1 Safety factors for periodic safety review for research reactors Group A: SF1 – SF4.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Background and Diablo Canyon Initiatives
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Chapter 12 Branch Circuits and Feeders. Chapter 12 Branch Circuits and Feeders.
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
TURBINE CRANES NEA36 Turbine Crane.
NRC’s Component Design Bases Inspections
Compliance Report to ERCOT TAC February 2007
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and co-funded.
Flooding Walkdown Guidance
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
The D.C. Scout Battery Distribution System Ground Locator
NRC CM Pilot Inspections Methodology and Results
IEEE 383 Standard for Qualifying Electric Cables and Splices for Nuclear Facilities Preview SC-2 May 12, 2014 Robert Konnik.
“Regulatory Inspection and Enforcement by PNRA” Application Set
Indian Grid Code and Commissioning Test Procedure Dr
Configuration Management in a Risk-Informed Environment
Robert Kahler Branch Chief
Protective Relaying Conference
MIT Nuclear Reactor Laboratory
NRC Event Number – Event Date
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Version 1.0, May 2015 This material was.
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Control of Hazardous Energy
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
TRTR Briefing September 2013
Emergency Preparedness
Group 1 Best Group.
Version 1.0, May 2015 SHORT COURSE
Recent changes to the ani engineering rating factor
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

DCPP Performance Based on NRC Performance Indicators January 2016 - June 2016 Hossein Hamzehee Manager, Regulatory Services PG&E June 22, 2016

DCPP Performance Overview Diablo Canyon is rigorously inspected by the Nuclear Regulatory Commission (NRC). PG&E is committed to the highest safety standards and we continually re-evaluate our operations and emergency plans. We never stop examining our plans and take actions to ensure that we are ready to meet our mission to protect public health and safety.

DCPP Performance Summary January 2016 – June 2016 Summary: This presentation covers approximately 5 months of NRC inspections involving ~3000 hours of inspection time. DCPP met “Green” performance expectations for all NRC performance indicators. Eight very low-safety significant violations were identified since the last DCISC meeting in February 2016.

NRC Performance Indicators Unit 1 Unit 2 G Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System G Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent

Licensee Event Reports No new Licensee Event Reports (LER) were issued during January 2016 through June 2016. Supplemental information was provided to the NRC in February 2016 regarding a 2014 LER related to a Residual Heat Removal socket weld issue.

Safety Significance: What do colors mean? Safety significance characterizations are either Green (very low), White (low to moderate) Yellow (substantial) or Red (high). Green non-cited violations indicate very low safety significance, with no impact to public health and safety.

NRC Violations January 2016– June 2016 Eight non-cited violations since last DCISC public meeting All are Green – Very low safety significance with no impact to public health & safety Examples: Failure to evaluate the extent of condition of a nonsafety-related breaker, which was procured as safety-related, in accordance with plant procedure. (Cross-Cutting Aspect H.14 Conservative Bias) Failure to correct the lack of design verification of 460 Volt motors at maximum allowed frequency when powered from Emergency Diesel Generator. (Cross-Cutting Aspect P.2 Evaluation) Procedure Inadequacy identified in Emergency Operating Procedure for isolating a faulted steam generator. (Cross-Cutting Aspect H.1 Resources) DCPP overall performance is Green with respect to NRC Cross-Cutting aspects, except H.6 (Design Margins) which is White with 3 CCAs identified during recent Component Design Basis Inspection. 1. Non-Cited Violation (NCV) (Green) – Failure to verify design operational parameters associated with 125 VAC and 480 VAC equipment room ventilation systems. (No Cross-Cutting Aspect) Very low safety significance with no impact to public health & safety 2. NCV (Green) – Failure to evaluate the extent of condition of a nonsafety-related breaker, which was procured as safety-related, in accordance with plant procedure. (Cross-Cutting Aspect H.14 Conservative Bias) 3. NCV (Green) – Failure to ensure DC components acceptable up to max battery equalizing voltage. (Cross-Cutting Aspect H.6 Design Margins) 4. NCV (Green) – Failure to verify the design of the 230 kV preferred offsite power source bounds postulated events. (Cross-Cutting Aspect H.6 Design Margins) 5. NCV (Green) – Failure to include appropriate quantitative acceptance criteria to ensure that the load tap changer speed for standby startup transformer was adequate to restore vital bus voltages to the required level during design basis events. (Cross-Cutting Aspect H.6 Design Margins) 6. NCV (Green) – Failure to comply with manufacturers instruction for maximum trip current settings of instantaneous mag trip circuit breakers and motor control center motor starter cubicles. (No Cross-Cutting Aspect) 7. NCV (Green) – Failure to correct the lack of design verification of 460 Volt motors at maximum allowed frequency when powered from Emergency Diesel Generator. (Cross-Cutting Aspect P.2 Evaluation) 8. NCV (Green) – Procedure Inadequacy identified in Emergency Operating Procedure for isolating a faulted steam generator. (Cross-Cutting Aspect H.1 Resources )

DCPP Performance Summary January 2016- June 2016 The following Inspection Reports were Issued: 1st Quarter Integrated Inspection Report (2016-001, 4/26/16) Component Design Basis Inspection Report (2016-007, 4/21/16) NRC Licensed Operator Examination Report (2016-301, 6/7/16) DCPP performance was Green based on NRC performance indicators.

Thank You Hossein Hamzehee