Excursions in Modern Mathematics Sixth Edition
Advertisements

Chapter 3: Planning and Scheduling Lesson Plan
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. Scheduling with Independent Tasks Notes 9 – Section 8.7.
Chapter 8: Scheduling “Science is organized knowledge. Wisdom is organized life.” -Immanuel Kant.
Critical Paths and Critical Paths Algorithm Notes 8 – Sections 8.5 & 8.6.
Graphs Graphs are the most general data structures we will study in this course. A graph is a more general version of connected nodes than the tree. Both.
Excursions in Modern Mathematics Sixth Edition
1 Excursions in Modern Mathematics Sixth Edition Peter Tannenbaum.
Connected Components, Directed Graphs, Topological Sort COMP171.
The Mathematics of Scheduling Chapter 8. How long does it take to build a house? It depends on Size of the house Type of construction Number of workers.
Connected Components, Directed Graphs, Topological Sort Lecture 25 COMP171 Fall 2006.
C o n f i d e n t i a l HOME NEXT Subject Name: Data Structure Using C Unit Title: Graphs.
Excursions in Modern Mathematics Sixth Edition
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 6 The Mathematics of Touring 6.1Hamilton Paths and Hamilton Circuits.
1 Excursions in Modern Mathematics Sixth Edition Peter Tannenbaum.
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 8 The Mathematics of Scheduling 8.1The Basic Elements of Scheduling.
Copyright © Cengage Learning. All rights reserved. CHAPTER 10 GRAPHS AND TREES.
1 Excursions in Modern Mathematics Sixth Edition Peter Tannenbaum.
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 8 The Mathematics of Scheduling 8.1The Basic Elements of Scheduling.
Spring 2015 Mathematics in Management Science Machine Scheduling Problem Statement of MSP Assumptions & Goals Priority Lists List Processing Algorithm.
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 8 The Mathematics of Scheduling 8.1The Basic Elements of Scheduling.
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 8 The Mathematics of Scheduling 8.1The Basic Elements of Scheduling.
Spring 2015 Mathematics in Management Science Critical Path Scheduling Critical Paths & Times Backflow Algorithm Critical Times PL Critical Path Algorithm.
10. Lecture WS 2006/07Bioinformatics III1 V10: Network Flows V10 follows closely chapter 12.1 in on „Flows and Cuts in Networks and Chapter 12.2 on “Solving.
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 7 The Mathematics of Networks 7.1Trees 7.2Spanning Trees 7.3 Kruskal’s.
EXCURSIONS IN MODERN MATHEMATICS SIXTH EDITION Peter Tannenbaum 1.
EXCURSIONS IN MODERN MATHEMATICS SIXTH EDITION Peter Tannenbaum 1.
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 5 The Mathematics of Getting Around 5.1Euler Circuit Problems 5.2What.
Graphs Upon completion you will be able to:
Excursions in Modern Mathematics, 7e: Copyright © 2010 Pearson Education, Inc. 8 The Mathematics of Scheduling 8.1The Basic Elements of Scheduling.
Planning and Scheduling.  A job can be made up of a number of smaller tasks that can be completed by a number of different “processors.”  The processors.
Critical Paths and Scheduling Tasks Circuits, Paths, and Schedules.
Subject Four Graphs Data Structures. What is a graph? A data structure that consists of a set of nodes (vertices) and a set of edges that relate the nodes.
Chapter 3: Planning and Scheduling. Planning and Scheduling - Topics Resolving Conflict via Coloring Bin Packing Scheduling Tasks Critical-Path Schedules.
Excursions in Modern Mathematics Sixth Edition
Excursions in Modern Mathematics Sixth Edition
8 The Mathematics of Scheduling
Excursions in Modern Mathematics Sixth Edition
Chapter 2 Sets and Functions.
Greedy Algorithms.
Excursions in Modern Mathematics Sixth Edition
8 The Mathematics of Scheduling
Graphs: Definitions and Basic Properties
Topological Sort In this topic, we will discuss: Motivations
Task Tables Draw a graph for the following task table.
CSNB 143 Discrete Mathematical Structures
V12: Network Flows V12 follows closely chapter 12.1 in
Depth-First Search.
Chapter 2: Business Efficiency Lesson Plan
Graphs Chapter 11 Objectives Upon completion you will be able to:
Scheduling Theory By Sarah Walker 12/4/2018.
Chapter 2: Business Efficiency Business Efficiency
Introduction to Vertex-Edge graphs (2 days)
Critical Path Method Farrokh Alemi, Ph.D.
Advanced Analysis of Algorithms
Excursions in Modern Mathematics Sixth Edition
Connected Components, Directed Graphs, Topological Sort
Planning and Scheduling
5 The Mathematics of Getting Around
Planning and Scheduling
Copyright © Cengage Learning. All rights reserved.
Thinking Mathematically
Copyright © Cengage Learning. All rights reserved.
GRAPHS Lecture 17 CS2110 Spring 2018.
Graphs.
Copyright © Cengage Learning. All rights reserved.
Warm Up – 3/27 - Thursday Write a priority list using the decreasing time algorithm. Do you see any problem with this?
Chapter 3: Planning and Scheduling Lesson Plan
5 The Mathematics of Getting Around
INTRODUCTION A graph G=(V,E) consists of a finite non empty set of vertices V , and a finite set of edges E which connect pairs of vertices .
Presentation transcript:

Excursions in Modern Mathematics Sixth Edition Peter Tannenbaum

Chapter 8 The Mathematics of Scheduling Directed Graphs and Critical Paths

The Mathematics of Scheduling Outline/learning Objectives To understand and use digraph terminology. To schedule a project on N processors using the priority-list model. To apply the backflow algorithm to find the critical path of a project.

The Mathematics of Scheduling Outline/learning Objectives To implement the decreasing-time and critical-path algorithm. To recognize optimal schedules and the difficulties faced in finding them.

The Mathematics of Scheduling 8.1 The Basic Elements of Scheduling

The Mathematics of Scheduling The Basic Elements of Scheduling The processors. Every job requires workers. We will use the term processors to describe the “worker” who carry out the work. For the purposes of our discussion, we will use N (where N  2) to represent the number of processors and P1, P2, P3, …PN to denote the processors themselves.

The Mathematics of Scheduling The Basic Elements of Scheduling The tasks. In every complex project there are individual pieces of work, often called “jobs” or “tasks”. We will define a task as an indivisible unit of work that cannot be broken up into smaller units. Thus, it is always carried out by a single processor. We will use capital letters A, B, C…, to represent the tasks.

The Mathematics of Scheduling The Basic Elements of Scheduling The tasks (continued). At a particular moment in time a task can be in one of four possible states: Completed In execution Ready Ineligible

The Mathematics of Scheduling The Basic Elements of Scheduling The processing times. The processing time for a given task X is the amount of time, without interruption, required by one processor to execute X. Thus, the notation X(5) tells us that the task called X has a processing time of 5 units (be it minutes, hours, days, or any other unit of time).

The Mathematics of Scheduling The Basic Elements of Scheduling The precedence relations. Precedence relations are formal restrictions on the order in which the tasks can be executed, much like those course prerequisites in the school catalog that tell you that you can’t take course Y until you have completed course X.

The Mathematics of Scheduling A precedence relation can be conveniently abbreviated by writing XY or described graphically in (a).

The Mathematics of Scheduling When a pair of tasks X and Y have no precedence requirements between them, we say that the tasks are independent. Graphically, we can tell if there are no arrows connecting them (b).

The Mathematics of Scheduling Two final comments about precedence relations are in order. First, precedence relations are transitive: If XY and YZ , then it must be true that XZ as shown in (c).

The Mathematics of Scheduling The second observation is that we cannot have a set of precedence relations that form a cycle as shown in (d). Clearly, this is logically impossible!

The Mathematics of Scheduling Repairing a Wreck Imagine you just wrecked your car. The garage is operated by two processors, P1 and P2. The repairs can be broken into four different tasks:

The Mathematics of Scheduling Repairing a Wreck (A) exterior body work (4 hours), (B) engine repairs (5 hours), (C) painting and exterior finish work (7 hours), and (D) repair transmission (3 hours). The only precedence relation A C .

The Mathematics of Scheduling Repairing a Wreck The schedule shown in (a) is very inefficient. All the short tasks are assigned one processor (P1) and all the long tasks to the other processor (P2).

The Mathematics of Scheduling Repairing a Wreck Under this schedule, the project finishing time (the duration of the project from the start of the first task to the completion of the last task) is 12 hours. We will use Fin to denote the finishing time, so we can write Fin = 12 hours.

The Mathematics of Scheduling Repairing a Wreck It looks better in schedule (b), but it violates the precedence relation A C (we cannot start task C until task A is completed).

The Mathematics of Scheduling Repairing a Wreck On the other hand, if we force P2 to be idle for one hour, waiting for the green light to start task C, we get a perfectly good schedule as shown in (c). Fin = 11 hours.

The Mathematics of Scheduling Repairing a Wreck Can we do better? No! The precedence relation A(4) C(7) implies that the 11 hours is a minimum barrier that we cannot break. Thus, the schedule in (c) is an optimal schedule and Fin = 11 hours is the optimal finishing time.

The Mathematics of Scheduling Repairing a Wreck From now on we will use Opt instead of Fin when we are referring to the optimal finishing time. Schedule (d) shows a different optimal schedule with finishing time Opt = 11 hours.

The Mathematics of Scheduling 8.2 Directed Graphs (DiGraphs)

The Mathematics of Scheduling A directed graph or digraph for short, is a graph in which the edges have a direction associated with them, typically indicated by an arrowhead. Digraphs are particularly useful when we want to describe asymmetric relationships (X related to Y does not imply that Y must be related to X).

The Mathematics of Scheduling The classic example of an asymmetric relationship is romantic love: Just because X is in love with Y, there is no guarantee that Y reciprocates that love. Given two individuals X and Y and some asymmetric relationship (say love), we have four possible scenarios:

The Mathematics of Scheduling Neither loves the other (a), X loves Y but Y does not love X (b), Y loves X but X does not love Y (c), and they love each other (d).

The Mathematics of Scheduling In a digraph, instead of talking about edges we talk about arcs. Every arc is defined by its starting and ending vertex. Thus, if we write XY, we are describing the arc in (b) as opposed to YX as shown in (c). A list of all the arcs is called the arc-set of a digraph A = {XY, YX}

The Mathematics of Scheduling Additional Terminology If XY is an arc in the digraph, we say that vertex X is incident to vertex Y, or equivalently, that Y is incident from X. The arc YZ is said to by adjacent to the arc XY if the starting point of YZ is the ending point of XY.

The Mathematics of Scheduling Additional Terminology In a digraph, a path from vertex X to vertex W consists of a sequence of arcs XY, YZ, ZU, …, VW such that each are is adjacent to the one before it and no arc appears more than once in the sequence. When the path starts and ends at the same vertex, we call it a cycle of the digraph.

The Mathematics of Scheduling Additional Terminology In a digraph, the notion of the degree of a vertex is replaced by the concepts of indegree and outdegree. The outdegree of X is the number of arcs that have X as their starting points (outgoing arcs); the indegree of X is the number of arcs that have X as their ending point (incoming arcs).

The Mathematics of Scheduling 8.3 Scheduling with Priority Lists

The Mathematics of Scheduling A priority list is a list of all the tasks prioritized in the order we prefer to execute them. If task X comes before task Y in the priority list, then X gets priority over Y. This means that when it comes to a choice between the two, X is executed ahead of Y. However, if X is not yet ready for execution, we skip over it and move on to the first ready task after X in the priority list.

The Mathematics of Scheduling The process of scheduling tasks using a priority list and following these basic rules is known as the priority-list model for scheduling. At any particular moment in time throughout a project, a processor can be either busy or idle and a task can be ineligible, ready, in execution, or completed. At each stage of the schedule we need to keep track of the status of each task.

The Mathematics of Scheduling One convenient recordkeeping strategy goes like this: On the priority list itself ready tasks are circled in red as shown in (a). When a ready task is picked up by a processor and goes into execution, put a single red slash through the red circle as shown in (b).

The Mathematics of Scheduling When a task that has been in execution is completed, put a second red slash through the circle as shown in (c). At this point, it is also important to check the project digraph to see if any new tasks have all of a sudden become eligible . Tasks that re ineligible remain unmarked as shown in (d).

The Mathematics of Scheduling 8.4 The Decreasing-Time Algorithm

The Mathematics of Scheduling One first attempt to find a good priority list is to do the longer jobs first and leave the shorter jobs for last. A priority list where the tasks are listed in decreasing order of processing times is called a decreasing-time priority list, and the process of creating a schedule using a decreasing-time priority list is called decreasing-time algorithm.

The Mathematics of Scheduling To use the decreasing-time algorithm we first prioritize the 15 tasks in a decreasing-time priority list: AD(8), AP(7), IW(7), AW(6), FW(6), AF(5), IF(5), ID(5), IP(4), HU(4), PU(3), PD(3), EU(2), IC (1)

The Mathematics of Scheduling Using the decreasing-time algorithm with N = 2 processors, we get the schedule shown above with project finishing time Fin = 42 hours.

The Mathematics of Scheduling 8.5 Critical Paths

The Mathematics of Scheduling Critical Paths and Critical Times For a given vertex X of a project digraph, the critical path for X is the path from X to END with longest processing time. (The processing time of a path is defined to be the sum of the processing times of all the vertices in the path.) When we add the processing times of all the tasks along the critical path for a vertex X, we get the critical time for X. (By definition, the critical time of END is 0.)

The Mathematics of Scheduling Critical Paths and Critical Times The path with longest processing time from START to END is called the critical path for the project, and the total processing time for this critical path is called the critical time for the project.

The Mathematics of Scheduling The Backflow Algorithm Step 1. Find the critical time for every vertex of the project digraph. This is done by starting at END and working backward toward START according to the following rule: critical time for X = processing time of X plus largest critical time among the vertices incident from X.

The Mathematics of Scheduling The Backflow Algorithm Step 1 (continued). The general idea is illustrated in the above figure. [To help with the recordkeeping, it is suggested that you write the critical time of the vertex in square brackets [ ] to distinguish it from the processing time in parentheses ( ).]

The Mathematics of Scheduling The Backflow Algorithm Step 2. Once we have the critical time for every vertex in the project digraph, critical paths are found by just following the path along largest critical times. In other words, the critical path for any vertex X (and that includes START) is obtained by starting at X and moving to the adjacent vertex with largest critical time, and from there to the adjacent vertex with largest critical time, and so on.

The Mathematics of Scheduling 8.6 The Critical- Path Algorithm

The Mathematics of Scheduling The concept of critical paths can be used to create very good schedules. The idea is to use critical times rather than processing times to prioritize the tasks. The priority list we obtain when we write the tasks in decreasing order of critical times (with ties broken randomly) is called the critical-time priority list, and the process of creating a schedule using the critical-time priority list is called the critical-path algorithm.

The Mathematics of Scheduling Critical-Path Algorithm Step 1 (Find critical times). Using the backflow algorithm, find the critical time for every task in the project. The critical times for each task are shown in red.

The Mathematics of Scheduling Critical-Path Algorithm Step 2 (Create priority list). Using the critical times obtained in Step 1, create the critical-time priority list. The critical-time priority list for the project is AP[34], AF[32], AW[28], IF[27], IW[22], AD[18], IP[15], PL[11], HU[11], ID[10], IC[7], FW[6], PU[5], PD[3], EU[2].

The Mathematics of Scheduling Critical-Path Algorithm Step 3 (Create schedule). Using the critical-time priority list obtained in Step 2, create the schedule. The timeline for the resulting schedule is given above. The project finishing time is Fin = 36 hours. This is a very good schedule, but it is not an optimal schedule.

The Mathematics of Scheduling Critical-Path Algorithm Step 3 (Continued). Using the critical-time priority list obtained in Step 2, create the schedule. The above figure shows the timeline for an optimal schedule with finishing time Opt = 35 hours.

The Mathematics of Scheduling 8.7 Scheduling with Independent Tasks

The Mathematics of Scheduling In this section, we will briefly discuss what happens to scheduling problems in the special case when there are no precedence relations to worry about. This situation arises whenever we are scheduling tasks that are all independent. There are no efficient optimal algorithms known for scheduling, even when the tasks are all independent.

The Mathematics of Scheduling In this case, we just assign the tasks to the processors as they become free in exactly the order given by the priority list. Second, without precedence relations, the critical-path time of a task equals its processing time. This means that the critical-time list and decreasing-time list are exactly the same list, and, therefore, the decreasing-time algorithm and the critical-path algorithm become one and the same.

The Mathematics of Scheduling The Relative Error If we know the optimal finishing time Opt, we can measure how “close” a particular schedule is being optimal using the concept of relative error. For a project with finishing time Fin, the relative error (denoted by ) is given by

The Mathematics of Scheduling Conclusion Precedence Relations Project Digraph Priority List Models Independent Tasks