Site Audit Scenario & Antenna Adjustment

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

An ISO 9001 certified We offer our services to a wide range of networks such as GSM, CDMA and UMTS networks We Sells SPY Cams & security Cameras We have.
1 Aligning and Peaking. 2 Introduction In this section we will use a signal level meter to align and peak a single-satellite ODU and a multiple-satellite.
Land Navigation Module 2 Using a Lensatic Compass.
Site Troubleshooting Guide
Radio Network Tuning and Optimization for Universal
Cellular telecom networks. Coaxial Antenna Line 2 Introduction Waterproofing kits HYPERCELL ® Products offer all passive components between BTS and antennas.
CDR Analysis & Investigation Basic Course - Presentation
Numbers
ATA - 42 Antenna & Zone Cost Summary Matt Fleming Part B of a two part presentation Part A Antenna & Zone Design Summary Part B Antenna & Zone.
Micro and Nano Characterization Facility
PowerPoint ® Presentation Chapter 3 Site Surveys and Preplanning Preliminary Assessment Safety Site Surveys Preparing Proposals Installation Planning.
Powered By G-2, Plot No. 29, Marudhar Vihar, Near Reliance Fresh, Khatipura Circle, Jaipur , Rajasthan, India Mobile No: ,
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Control Office Site A Site B Site C Site D Site E.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 Rover setting for Network RTK (GSM) Trimble 5700.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
- 0 - KPIs Weekly Report Mobily LTE Date10 /1/ 2013 ReporterCentral MS OPT Team Central _Riyadh_ Cluster 5_LTE.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Test 1: Co-channel interference at the mobile unit
If I was the Government of India, what is the one thing that I would do to make the nation energy efficient? Suggest one way in which Government of India.
Red Rocks Community College ENY 130 Fall 2009 Module 3: Solar Resource.
SAFETY FIRST LAST & ALWAYS Core Safety Values. Mechanical Lifting/Suspended Loads I will never place myself or others under a suspended load.
COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.
Puerto Rico Deployable Radar Network Design; Site Survey Sponsored by: NASA- TCESS-FAR J. M. Trabal (1), J. G. Colom (1), S. L. Cruz-Pol (1), S. M. Sekelsky.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Field Methods 2 When a GPS only won’t do: –Forestry canopies –Canyons (no reception or can’t reach) –Underwater –Small areas when you don’t have a sub-
Summary of SLS for RRM NTT DOCOMO
Dr. Hesham M. ELBADAWY, NTI, Egypt
Documentation.
Site Audit Scenario & Antenna Adjustment
IBTUF VIII – AUSTIN, TX Distributed Antenna Systems for Large Venues
Lift up antenna at least 40ft height above the ground.
PIPE SPOOL WELDING SYTEM – LIGHT VERSION
Small Engine Tool ID Part 1.
Single Site Acceptance Report for TIGO UMTS Project Phase II
Training: Wireless Site Surveys
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
CLUSTER CILEDUK CIPONDOH 1A
Drive Testing Basics 2013 March
SSA Improvement LTE Central Java.
IBTUF VIII – AUSTIN, TX Distributed Antenna Systems for Large Venues
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
NMSU SHOT II WORKSHOP Klipsch School of Electrical and Computer Engineering & Mechanical Engineering Department Jeremy Bruggemann Michelle Chavez Trevenor.
ADINA INSTITUTE OF SCIENCE AND TECHNOLOGY
برنامه‌ريزي منابع انساني
Solarize Your School.
What everyone should Know about map Contents!
Do not work at height without fall protection
How to Process an Interactive GPS Report Training Presentation
THANK YOU!.
RAN Functional Decomposition the options and interfaces…
SciQuest Update Purchasing and Distribution Services FAR
Thank you.
Thank you.
Compensation Administration Tool Additional Adjustments Page Changes
Advisors: Dr. Katz and Dr. Chang
PIPE SPOOL WLEDING SYTEM – HEAVY VERSION
Engine Part ID Part 2.
BIRDS-4 Computer Aided Drawing (CAD)
Presentation transcript:

Site Audit Scenario & Antenna Adjustment ERICSSON - 4G_LTE_XL ______________________________________________ Site Id : ------- Site Name : LTE_KARET PASAR BARU TIMUR (Audit Only) Auditor / Rigger Name : Hendro B Last Update : 18 Januari 2016 Site Audit Scenario & Antenna Adjustment

Site Audit Scenario -Antenna Physical Configuration Audit: Site Location Feeder isolation/tapping foto Antenna Height Antenna Type Antenna Orientation Antenna Location Mechanical Tilt Electrical Tilt -Tools and Equipment: Tilt meter, Camera, Altimeter, GPS, Compass - Views: Panoramic Views every 30 degrees

Site Name : LTE KARET PASAR BARU TIMUR Long / Lat : 106. / 06. Site Id : ------- Site Name : LTE KARET PASAR BARU TIMUR Long / Lat : 106. / 06. site id site name sec id Antenna hight Building High Type antenna Ant Direction Mec Tilt Elc tilt Before After -

BTS & GPS

Tower, Antenna & Building High

Panoramic View 0 – 90 30 60 90

Panoramic View 120 - 210 120 150 210 180

Panoramic View 120 - 210 240 270 300 330

RRU Sec1 Sec2 Sec3

Antenna Type Sec1 Sec2 Sec3

Antenna View & Azimuth Sec1 Sec2 Sec3 60 240 330

Mechanical Tilt Sec1 = 3 Sec2 = 1 Sec3 = 3

Jumper/Feeder Sec2 Sec1 Sec3

Electrical Tilt LTE Sec2 = 6 Sec1 = 6 Sec3 = 6

Electrical Tilt 3G Sec2 = 0 Sec1 = 7 Sec3 = 8

Electrical Tilt 2G Sec2 = 5 Sec1 = 6 Sec3 = 5

THANKS