Project Controls: As-Built S-Curves

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project Control: Control of Work and Cost Versus Time Part #4 May 29, 2014 Hide/Unhide Exercises?
Project Control: Developing the As-Planned S-Curves
3/20/2003CVEN Maxwell 1 PERT – Program Evaluation & Review Technique Module: PERT Modified: February 20, 2003.
Advanced Project Management - CPH
Project Management Techniques.
CS 501: Software Engineering Fall 2000 Lecture 4 Management I: Project Management.
1 Software Testing and Quality Assurance Lecture 15 - Planning for Testing (Chapter 3, A Practical Guide to Testing Object- Oriented Software)
Project Time Management
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Project Control: Developing the As-Built S-Curves Part #3 June 26, 2002 Hide/Unhide Exercises.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
COMP 208/214/215/216 Lecture 3 Planning. Planning is the key to a successful project It is doubly important when multiple people are involved Plans are.
Project monitoring and Control
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Project Control: Work and Cost Versus Schedule Module: April 22, 2003.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
Prof. Shrikant M. Harle.  Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty.
L5 Computing Team Project Final Presentation Guidelines.
Session VIII: Work Plan and Budget Plan
HCIS 410 AID Experience Tradition /hcis410aid.com
Project Management Business Management.
TOPIC-8B- PROJECT COST CONTROL
Starter: y = x + 1 B) y = x – 1.
Copyright All Rights Reserved by
By Wilmer Arellano Spring 2010
Project Planning & Scheduling
Project Communication, Tracking, and Reporting
Software project mgt. session # 3– lab manual.
Project Planning & Scheduling
Introduction to New Product Development (Portfolio)
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
2.2 | Use Planning Tools.
Business and Management Research
Project Estimating Overview
Science Fair Graph.
Monitoring and Reporting Project Progress
Overview: Understanding and Building a Schoolwide Assessment Plan
Project Implementation
Monitoring and Information Systems
Prepared by Lee Revere and John Large
Deliverables to Celebration
The Project Development Process:
COMP 208/214/215/216 Lecture 3 Planning.
Traditional Steps Leading To A Bid Document
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
MGT 605: CH 04 Defining the Project.
Critical Path Method Farrokh Alemi, Ph.D.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Activity on Node Approach to CPM Scheduling
Project Management Process Groups
Welcome W 15 Introduction to Engineering Design II (IE 202)
Team Project Review the background information and project teams on our course site Work with the engineers (4-5) and your PM team member(s) You have.
Study Skills for School Success! Session 3
* 2000/08/1307/16/96 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
P ROJECT M ANAGEMENT Skills.
Information System Analysis
PMI-SVC Scheduling Forum
Fine-Tuning your plan and obtaining approval
Identifying the Work to Be Done
Time Scheduling and Project management
Warm-Up Honors Algebra /11/19
Presentation transcript:

Project Controls: As-Built S-Curves Part 08-02 April 14, 2003 The As-Built S-Curves are revised and updated during the conduct of the construction phase of the project. The level of detail and accuracy should reflect the results of the project planning results. Optional Reading Assignment: Halpin 2, 6, 12, 14, Oberlender 9, CII Pub 5-6. Part # 3 should take about 30-45 minutes depending upon the length of the discussion. CVEN 349 - Maxwell 4/14/2003

Purpose Illustrate how to develop a set of As- Built S-Curves from field estimates developed during actual construction operations. Review the field construction process to the extent necessary to set the context. CVEN 349 - Maxwell 4/14/2003

Learning Objectives Be able to construct a schedule of work and cost versus elapsed time from a typical (but simplified) set of observed field data. Be able to plot and identify the As-Built S-Curves best representing these schedules. With respect to chart layout, be able to label all curves and axes. The first and second Learning Objectives make good Exam questions. Failure to accomplish the last objective during an exam will usually result in a wrong answer because of orientation problems. In any event, I count off for failure to do so. CVEN 349 - Maxwell 4/14/2003

Who Collects The As-Built Information And When Is It Collected? We are going to assume that it is collected by the Contractor’s Project Manager or Field Superintendent. We are going to assume that it is collected on a regular basis at the construction site. You should refer to the process diagram on the next page. CVEN 349 - Maxwell 4/14/2003

The Traditional Project Development Process If you are the design engineer, remember you can use this technique to control the design phase of the project. Progress data should be collected on a regular basis during construction. CVEN 349 - Maxwell 4/14/2003

Class Exercise: 08-02.1 As Individuals: At what point in the project is work accomplished measured? As Pairs: At what point in the project is cost information collected? As Teams: If you have a choice, is it better to collect cost and schedule information, toward the beginning, the middle, or toward the end of a project? You should start immediately and keep a running total according to work packages, etc. You should collect cost information by work package as in the step above. It is very important that the rate of work (slope) of the middle of the curve be at least as steep as originally planned. It is OK to stumble out of the gate but you had better make sure that you get caught up early. CVEN 349 - Maxwell 4/14/2003

Cost Incurred versus Work Actually Accomplished There are three elements: (1) Cost incurred to date and (2) Work actually completed, and (3) the schedule. There may be little relationship between cost and results. That is, the project may be incurring costs but there may be few results to show for it. Costs incurred are easy to measure; % complete (work accomplished) may be difficult to measure. Refer to CII Pub 6-5. It is in 08 Project Controls on the Web Remember that these three elements must be controlled as a whole. During planning there were some assumed relationships between them. In the construction phase cost and work are independent of each other to some extent. You can incur cost with no progress. But to make progress you have to incur cost. The CII publication is a public domain document and reflected the “state of the practice” when it was published. CVEN 349 - Maxwell 4/14/2003

There are Several Approaches Used to Collect the % Complete Units Method – easily measured pieces of work requiring about the same amount of effort. Incremental Milestones – any work item involving parts that must be handled in sequence. Start/Finish – any work item where a % complete is easy to measure or compute Opinion – any piece of work where other methods are too difficult. Cost Ratio – used only on administrative tasks active over the life of the project. Project Managers may any or all of these methods to measure work progress. You should illustrate with examples. This is covered in detail in the CII Publication. CVEN 349 - Maxwell 4/14/2003

Exercise Set #08-02.1 Think, Pair, Share on any or all of the topics on the previous slide. Have the students “brain storm” examples of each. To hold their interest, have the students turn in the results. CVEN 349 - Maxwell 4/14/2003

Example: Base Course Construction Unplanned events like rain and equipment breakdown will greatly affect progress. In these cases work may stop but some degree of costs may continue. Ask the students to describe a learning curve. The “learning curve” causes ramp-up and ramp-down which causes deviations from average. Equipment breakdowns, rain days, etc. will also have an effect on the final outcome.

What Does All This Imply? There may be no direct relationship between elapsed time, actual work and incurred cost. For example, at the end of day 8 you have actually spent 54% of the budget and completed 40% of the work. This illustrates a typical “check point” at the end of the eight day (or week, or month). The project is probably in trouble – 54% of the money is gone and 60% of the work remains. CVEN 349 - Maxwell 4/14/2003

Combine As-Planned and As-Built At the end of day 8 we are 8% (55-47) over budget and 7% ahead of schedule based upon elapsed time. This chart shows the relationship between the As-Planned and As-Built. Using these data you can determine projects status as shown on the next slide. CVEN 349 - Maxwell 4/14/2003

Combining the As-Built with the As-Planned. Planned Actual This slide shows a plot of the combined data. The “long” curves show the As-Planned schedule; the “short” lines the As-Built data. Note that the “work” lines are plotted against the double scale on the right side of the plot; the “cost” lines against the sclae on the left. CVEN 349 - Maxwell 4/14/2003

Class Exercise 08-02.2 Plot and Label the S-Curves for these data. AND Bring to class next time. Other Exercise data can be generated using the Excel Workbook. You should collect these exercises, if done in class. This will give you a heads-up on comprehension.

Reminder! Class Assessment Questions In 1 sentence what was the muddiest part of this module? In 1 sentence, what part of this module could be improved the most? CVEN 349 - Maxwell 4/14/2003