Report of the Capacity Buildung Sub-Committee

Slides:



Advertisements
Similar presentations
This project is funded by the EUAnd implemented by a consortium led by MWH Amman – 23 April 2012 RCBI ‘handover’ meeting Jordan.
Advertisements

IRCC June 2015 (Mexico City, Mexico) Report of the Capacity Buildung Sub-Committee Thomas Dehling CBSC Chair.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) ANNUAL REPORT 2014.
IRCC 5 Report Chair MACHC Dec Chair Report IRCC5 Report presented after consultation with the chair of the three working groups. The IRCC 5 report.
Captain Marc van der Donck Chair MACHC December 2015 Hydrographic Service Agenda item 2.2 IRCC 7 report.
MACHC Capacity Building Update Presented by UKHO.
CBSC-14 IHB Report Mustafa IPTES Director, IHO. Ratification of Protocol of Amendments on IHO Convention *47 of 48 approvals received. * Next IHC will.
South West Pacific Hydrographic Commission (SWPHC)
14th CBSC Conference 5.1C - EAtHC Report
MACHC Capacity Building Update
By Jens Peter Hartmann (MSDIWG Chair)
Arctic Regional Hydrographic Commission
Year One: Project implementation overview
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Capacity Building Sub Committee Meeting Report for MACHC
Update on Capacity Building Management System
Item 05.1F – Summary report on CB activities
EC-68 DOC 16.3 GOVERNANCE REVIEW
CBSC16 Goa, India, 30 May - 1 June 2018 IHO Secretariat Report
Entry into force of the Amendments to the IHO Convention and its supporting Basic Documents
OUTCOME OF THE COUNCIL October 2017 Monaco
By EAHC COORDINATOR Peter You
South West Pacific Hydrographic Commission (SWPHC)
Proposed IHO Work Programme for 2018
Update on the IHO CBSC 15 Peter YOU EAHC CB Coordinator
Report of the WWNWS-SC to IRCC 5
Outcomes from the IRCC-9
IRCC work is guided by the IHO Work Programme 3
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
South West Pacific Hydrographic Commission (SWPHC)
Strategic Plan Review Working Group
Report of the Strategic Plan Review Working Group Bruno Frachon
Inter-Regional Coordination Committee
Jung Hyun Kim Republic of Korea EAHC Capacity Building Coordinator
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Add Commission and date Sept 17, 2018
Hak Yoel (Peter) YOU Republic of Korea
IRCC 10 Outcomes Complete IRCC report available on the IHO website
BRIEF SUMMARY OF THOSE ITEMS FROM THE 2nd MEETING OF THE IHO COUNCIL
Worldwide ENC Database Working Group (WENDWG) Report
South West Pacific Hydrographic Commission (SWPHC)
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
CBSC 16 Chairman Report Goa, India, 29 May – 1 June 2018
International Hydrographic Organization
Agenda Item 5.2 Reference Document C2-5.2
MACHC Capacity Building Update
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
Satellite derived bathymetry (SDB) – Risk assessment
Council-2 Readout SWPHC February 13, 2019
Hydrographic Services and Standards Committee
Report on 9th TRDC-BOD Meeting
IRCC work is guided by the IHO Work Programme 3
East Asia Hydrographic Commission (EAHC) Three Year Work Plan
What is Capacity Building?
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
10: Capacity Building 10.1 Report in the IHO CBSC Meeting & Actions
Status Report of the SPRWG of the Council Future Strategic Plan
EAHC Report IRCC C Japan EAHC Chair
CBSC17 Genoa, Italy, May 2019 IHO Secretariat Report
Peter YOU EAHC CB Coordinator
CBSC 17 Chairman Report Genoa, Italy, 29 May – 31 May 2019
Eastern Atlantic Hydrographic Commission (EAtHC)
Status Report of the SPRWG of the Council
Council-2 Readout IRCC June 3, 2019
Southern African & Islands Hydrographic Commission (SAIHC) Report
Status Report of the SPRWG of the Council
BALTIC SEA HYDROGRAPHIC COMMISSION (BSHC)
Report and Proposal from IRCC
Aim of presentation CBSC was tasked to propose to the Council via IRCC to provide information on the minimum resources needed to support a sustainable.
Report and Proposal from IRCC
Presentation transcript:

Report of the Capacity Buildung Sub-Committee IRCC 9 12-14 June 2017 (Paramaribo, Suriname) Report of the Capacity Buildung Sub-Committee Thomas Dehling CBSC Chair

Contents Main developments and achievements in IHO CB Mayor challenges in IHO Capacity Building CB Management Contribution to Capacity Building CB Work Programme E-Learning Statistics and Performance Indicators Proposals

Main Developments and Achievements (1) IHO Capacity Building developing very successful. Strict use of IHO CB Strategy Clear structure of processes and smooth execution Almost reached the limit with the resources available To reach this development the following contributions have to be acknowledged especially: generous contribution from ROK generous contribution from Nippon Foundation

Main Developments and Achievements (2) To reach this development the following contributions have to be acknowledged especially (cont.): in-kind support from MS and Industry for CB execution work of the RHC CB Coordinators and Project Leaders contribution from France for EAtHC Definition Study work done by UK on CMEP, OECS and Commonwealth Seabed Mapping Programme work of NZ for the risk assessment and the PRNI Excellent support of Alberto Costa Neves

Main Developments and Achievements (3) CB Funds: regular contributions from IHO Budget increased Balance at the end of the year small E-learning, blended-learning and TFT initiatives. Several initiatives are ongoing, namely EAHC/Training Research and Development Center (TRDC), project on MSI in the EAtHC.

Major challenges (1) Capacity Building Assistance in the IHO Secretariat The successful operation and further enhancement is at risk or even impossible without additional Capacity Building Assistance Significant increase in the level of activities other competing IHO requirements/priorities Noted by EIHC-5 (Decision No.2) Report of WP 1 at Assembly1 (item 78-80).

Major challenges (2) Capacity Building Assistance in the IHO Secretariat (cont.) CBSC Secretary too much involved in administrative work and other tasks in the Secretariat. Time needed to assist the CBSC in the development of the CB and the realization of the CB Strategy.

Major challenges (3) Additional Capacity Building Assistance needs: Development of the CB Management System Integration with IHO GIS, CIS, document-system Validation of Student and Trainer Databases Process submissions and requests Maintenance of CB Publications Development of CB Procedures Assessment of the reports of the CB Activities Provide base knowledge available in the Secretariat to Technical Visit Team Leaders

Major challenges (4) Additional Capacity Building Assistance needs: Provide mentoring to CB Coordinators Development and maintenance of the CB at the IHO website Development of best practices and questions and answers guide Collate performance indicators and statistics Liaison with project partners Management of projects Knowledge in the cooperation with donor agencies Other clerical support in CB execution

Major challenges (5) Need of additional funds Available CB Funds provided are less than needed to even cover the expenses of projects with a higher priority. The number of submissions from the RHCs is stagnating due to the limited chances of getting funded. Member States can support the CB. Make use of national experts to get funds for projects.

Major challenges (6) Joint Capacity Building efforts with IMO The formerly very productive joint work with the IMO has ceased Joint CB meeting cancelled Disadvantageous that IMO ITCP does not provide cooperation with the IHO in CB A success of comprehensive projects will depend on a good cooperation between organizations

Major challenges (7) CB Coordinators. Necessary to nominate CB Coordinators permanently and allow participation in CBSC. SEPRHC still changes the CB Coordinator too often. Disadvantageous for the acceptance of projects and the allocation of CB funds. A cooperation with neighboring RHCs can improve the effectiveness of projects and thus also the chances to be funded.

CB Management The following CB Procedures have been adopted Procedure 10: Management Plan Procedure 11: Assessment of the Status of CB Phases Procedure 12: Certificate for the Completion of CB Activities

Contribution to CB Contribution from Republic of Korea Republic of Korea contributes significantly to the IHO CB Funding of students from IHO MS for the CAT A course at USM, Training for Trainer project, CAT B Module Course program held in Busan, ROK. Contribution of Japan through the Nippon Foundation (NF) IHO has implemented the NF-IHO Cartography, Hydrography and Related Training (NF-IHO CHART) Project, fully funded by the NF. Support from other MS and external support (i.e. Industry).

CB Work Programme 2005 - 2016

CB Work Programme 2017 and 2018 WP 2017 updated   IHO ROK Nippon Total Balance 2016 104 751,14 1 159,86 0,00 105 911,00 Income 2017 160 000,00 166 429,00 195 386,00 521 815,00 IHO Surplus 2017 191 000,00 2017 CBWP -460 564,70 -169 219,00 -195 386,00 -825 169,70 Balance 2017 -4 813,56 -1 630,14 -6 443,70 Not funded yet 100 000,00 WP 2017 updated WP 2018 adopted, expenditures roughly 700.000 €, Submissions sum up to 990.000 €

E-Learning Decision 16 on PRO-2 during Assembly1 to take into account e-learning in the IHO CB Strategy consider using e-learning in its Capacity Building activities E-learning is already an integral tool in the CB Strategy CBSC edited the CB Strategy to give it a more prominent visibility. Changes kept as a working document to submit a new version of the CB Strategy to the Council prior to A-2. Several e-learning initiatives ongoing in CB provision. e-learning platform for the delivery of MSI in Francophone Africa EAHC TRDC has been engaged in e-learning development as well.

Statistics and Performance Indicators Submission of projects from RHCs Year 2011 2012 2013 2014 2015 2016 2017 Submitted 14 31 28 29 30 33 32 Planned 21 Delivered 13,5 22 18 23 TBD CB-related Strategic Performance Indicators 4 and 5: Year 2011 2012 2013 2014 2015 2016 2017 SPI4 100% 97% 75% 93% SPI5 96% 73% 86% 82% 79% 88% TBD Statistics from the delivery of CB activities: no resources

Elections Chair Thomas Dehling, Germany has been re-elected Lamberto Lamberti, Italy has been elected as Vice-Chair The contribution of Olumide Omotoso, Nigeria as the former Vice-Chair of the CBSC has been acknowledged Olumide Omotoso has been assigned as the “CBSC Ambassador for Africa”.

Proposals (1/2) IRCC is invited to take note of the report; endorse the need of an urgent expansion of the IHO Secretariat support to CB and to request to the Council at its 1st Session to task the Secretary-General to ensure that the appropriate staff resources are provided to the CB-related activities. invite MS to investigate the possibilities of fund raising and engagement in CB via national organizations

Proposals (2/2) IRCC is invited to take action as seen appropriate to revitalize the cooperation between IHO and IMO to invite SEPRHC to install a permanent CB Coordinator and to ensure his or her participation in the CBSC meetings take any other actions as appropriate.