Existing Facilities Construction Safety & Performance Evaluations

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Managing the Health and Safety of Contractors
Financial Policies Training: Payments to Individuals for Services (2.3.1) Effective Date: January 1, 2009.
Introduction and Overview.   PowerPoint  Civil Service chapter 10 rules  Planning and evaluation form  Performance notes  Request for review Handouts.
+ NON-UNIT EMPLOYEE EVALUATION PROCESS March 2010-April 2011 and January 2011-December 2011.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
PROCEDURES FOR SELECTING THE CONTRACTOR
People First Manual Timesheet Training Guide Section 1
NON-UNIT EMPLOYEE EVALUATION PROCESS
Created by CCTC HIPAA: Notice of Privacy Practices Policy in the Administrative Guide.
Tennessee Department of Education Compliance Training February 2012 Department of Exceptional Children.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Reviewing the 2015 AmeriCorps Applications & Conducting the Review AmeriCorps External Review.
Welcome to TCAP-Alt PA K-2 Scoring Training Section 1: Required Components: Is this Portfolio Scorable?
DPW/OPM Lease Process Improvement “LEAN”. LEAN Business Case The Goal of the leasing process is to implement the most economical and appropriate options.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Capability Cliff Notes Series PHEP Capability 3—Emergency Operations Coordination What Is It And How Will We Measure It? For sound, click on the megaphone.
Agenda Overview of Office for Historically Underutilized Businesses (HUB Office) Statewide Uniform Certification (SWUC) Program New HUB Reporting Requirements.
ADEPT 1 SAFE-T Judgments. SAFE-T 2 What are the stages of SAFE-T? Stage I: Preparation  Stage I: Preparation  Stage II: Collection.
The Jordan Performance Appraisal System (JPAS) is designed to help educators in their continuing efforts to provide high quality instruction to all students.
Tips on Routing and Contracts: An Intro for the Campus Research Coordinator Michelle Artmeier Director of Award Services Ron.
High Schools United with NASA to Create Hardware (HUNCH)
Purchasing and Contracting Procedures Processes and Procedures for Contracting at UO Presented by: Deanne Lahaie-Noll & Greg Shabram.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
An Introduction to Lodging Establishment Inspections.
How to Guide: Performance Feedbacks Learn how to complete, upload and publish Performance Feedback forms.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Chapter 4 Assessment.
Post-Secondary Transition
Processes and Procedures for Contracting at UO
Review, Revise and Amend from Procedures for State Board Policy 74
2012 Grade 3 Reading Student Portfolio
Contractor Evaluations
Inspector's Role and Responsibilities
Processes and Procedures for Contracting at UO
2017 Grade 3 Reading Student Portfolio
Administration of a FIDIC Contract - Project Control
Inspector's Role and Responsibilities
Welcome to the Nevada Test Administration Training and Q&A Session
Teacher Evaluation Process
BASIC IRRS TRAINING Lecture 17
Request for Proposal - Best Value
Inspector's Role and Responsibilities
Healthy Program Reporting
ECOMP For National Guard Technician Employees
Punch list / Close Out - Project Completion
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Outreach Training Program Requirements
Training Appendix for Adult Protective Services and Employment Supports June 2018.
Outreach Training Program Requirements
Facilities Maintenance Extension
Request for Proposal - Best Value
Equitable Services Sections 1117 and 8501 of the Elementary and Secondary Education Act (ESEA), as amended by the Every Student Succeeds Act (ESSA),
The handing over procedure:
Post-Secondary Transition
Implementing Equitable Services Requirements
Performance Achievement a quick reference guide to
* 07/16/96 How a Bill Becomes a Law *.
2013 Grade 3 Reading Student Portfolio
Financial and Administrative presentation on PARTICULATES project
* 07/16/96 How a Bill Becomes a Law *.
Presentation transcript:

Existing Facilities Construction Safety & Performance Evaluations In-Service Training Sept 2007

Contractor Evaluations Contractor evaluations are an important element of the construction management process. LAUSD requires contractors to be evaluated for both safety and contract performance for each formal contract. These evaluations are an important tool for managing the contactors prequalification status and their ability to participate in the LAUSD modernization program.

What we are going to discuss! Topics Covered What we are going to discuss! Who prepares contractor evaluations. Who receives evaluations. What happens with evaluations. When are they to be prepared.

Topics Covered Cont: The scoring system. Documentation required for 7 points or lower rating, as well as negative Safety scores. How to prepare forms Examples of documentation. 50% complete evaluation. Participation in hearings. Questions.

OAR Responsibility Fill out and coordinate completion of both Safety and Performance Evaluations Obtain approval signature of Regional Director on all LAUSD projects. Forward completed evaluations to FCC office within 30 days of Report of Completion

When are Evaluations to be prepared? Evaluations are normally done at the Final Inspection. This is the best time to complete them because all necessary evaluators are usually present: OAR Inspector of Record End User/CPM/Site Administrator, i.e. Principal, VP, Plant Manager Preliminary Evaluations appropriate in some circumstances (more on this later)

How to prepare forms OAR checks the box to indicate whether this is a “Preliminary” or “Final” Performance Evaluation. OAR completes his/her section of the Performance Evaluation, then OAR completes or coordinates completion of the Safety and Performance Evaluations by the others: IOR and End User (Site Administrator/Principal, or his/her designee)

Safety Evaluation Can be completed by any evaluator: OAR, IOR, or End User. There are 5 “Yes”/”No” questions. ANY “No” response results in disqualification to bid. All “No” responses require back-up documentation.

Safety Evaluation: Examples of documentation for “No” responses Meeting minutes Conversation records Photographs E-mails Phone records Written notices Incident reports

Performance Evaluations Who completes: OAR scores questions 1-9 IOR scores questions 10-14. If IOR was not necessary, can be done by OAR or CPM. End User scores questions 15-18, except for new construction. Then the OAR does this portion. All questions scored on a scale of 1-10, with 1 being lowest (worst performance) and 10 being best.

Performance Evaluations: Scoring Max score possible: 180. Passing score: 140 If total score is less than 140: Each question scored 7 or less must be backed up by documentation, similar to Safety Evaluation. Undocumented scores of 7 or less will be automatically changed to “8” Blank or “N/A” will be scored “10”

Preliminary Evaluations Should be done at any point in the contract if problems arise: substandard performance, unresolved issues, etc. Suggested no later than 50% completion to give contractor a chance to correct deficiencies. Final evaluations not necessary if the preliminary has the same scores as would be on the final.

Conclusion Both Safety and Performance Evaluations must be signed and dated by ALL evaluators. Signature of Regional Director comes after all other portions completed and signed. Performance Evaluation scores on all contracts are averaged together. If the average Performance score is less than 140, or ANY Safety score is failing, contractor may be disqualified to bid, so THESE ARE AN IMPORTANT COMPONENT OF THE CLOSE-OUT DOCUMENTS!