Collaboration Board Report

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Collaboration Board Summary Alan Bross MICE CM 26.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Collaboration Board Summary K. Long, 27 June, 2015.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Recommendation Revised Process for Nominating and Electing Library Trustees.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
MICE CM 30 Collaboration Board Summary. Agenda 1. Approval of minutesBooth 2. Spokeʼs remarks & EB reportBlondel 3. Strathclyde request to join MICEKevin.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE CM38 Alain Blondel CB report 1 Report from the MICE collaboration board.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
K. Long Imperial College London/STFC
MICE Hall Summer Workplan
Collaboration Board Summary
Project Manager’s Report + DC/MoM Report
MICE Project in the US: Completion of Efforts
MICE PM Report Progress with the Infrastructure A few problems
Completing the Step IV Programme
Report on EUCARD WP6: MICE Transnational Access (TA)
United Way of Benton & Lincoln Counties
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Presentation transcript:

Collaboration Board Report Chris Booth October 2017

Announcement Congratulations to Ken on his appointment as Director of the Centre for Clinical Applications of Particles, at Imperial College. All were pleased that he was happy to continue as Spokesperson, and no-one felt there was a conflict of interest which would impede him leading the collaboration.

Spokesperson/EB Report – Ken Long EB Activities: Personnel – E Overton’s responsibilities distributed. Thanks to S Boyd for operation & shift coordination. Tracker software rolling review almost complete; ToF software review initiated. Step IV Run plan revised for longer H2 filling; commission M2D end of this week. Will not complete all scattering measurements. About to make case to funding agencies to use cycle 2017/03. Collaboration confirmed support for this and commits to providing shifters & experts to allow operation.

Spokesperson’s Report continued Cooling Demo, Protvino: K Long visited in August. Operation of MICE there looks possible. Political considerations – wish for strong CERN commitment. Resources: E Overton (DAQ & Tracker DAQ) – cover by D. Rajaram, M. Uchida, P. Kyberd, D. Adey. SS support – thanks to US collaborators. LH2 – expert support from team at RAL. Papers: Several in progress, some still need lead authors.

Spokesperson’s Report continued Next International Review in March: To include “lessons learned”. Communicate thoughts, issues etc. to Ken. Future Collaboration Meetings: Week of 26th Feb – 2nd Mar 2018 Week of 25th – 29th Jun 2018 Week of 8th – 12th Oct 2018 Should the format be different, shorter plenary, more workshops?

Project Manager’s Report – C. Whyte Liquid H2 system: Safety approval obtained. Leaks fixed. Cooling slower than expected. Now “satisfyingly boring”. Trackers: Cryostat cold-heads refurbished. Recalibration in progress. Superconducting magnets: Smooth run-up for data taking. SSD M2 ramp-up on Thursday.

Project Manager’s Report continued Data taking: All shifts full (after visa problem!). Need more BLOCs. Effective data taking. Future schedule for H2, magnets & magnet experts presented. 2017/03 may be financed by underspend on DL electrical work plus sale of tetrodes to ISIS – but will require staffing discussion with PPD & TD.

Operations – P. Franchini Cycles 2017/01 and 2017/02 summarised: LH2 solenoid & flip modes. Alarms – A. Kurup identified & suppressed transient alarms. Alarms are now real! (But still some limits to adjust.) Tracker calibration – big improvement in on-line plots. Thanks to MOMs & BLOCs (but still BLOC slots to fill).

Next CB Chair Institutes polled for nominations. 6 names put forward. After some thought, 5 nominees decided not to stand. P. Kyberd stood unopposed, elected unanimously! Takes over at next CM.

Common Fund – P. Soler ’16-’17 census reported last CM: 57 members => £171K expected income. Division £135K cash + £36K in kind. South Korea’s payment due Jan. 2018. China & Switzerland payments outstanding. Question of Common Fund for next year to be discussed at next CM.

Funding Updates UK: Post-Doc nominally to end 30th June ’18; Students will continue to 2020. US: FNAL selling superconductor to fund people; Mississippi & IIT “no cost” extension to Sep. ’18. INFN: Experiment considered finished in 2017; 40-50% funding for extra year to dismantle etc.