Protective Crane Design

Slides:



Advertisements
Similar presentations
Suspension Systems - 1 Topics covered in this presentation:
Advertisements

Introduction The BAJAJ Nite Raider series Light Tower in 9 and 12 meter height is general purpose mobile light tower intended for remote and emergency.
The information in this presentation is for the
68 Chapter Drive Shaft and Transfer Case Technology.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Rescue 42.
Model RJ-3 System Package We offer a Res-Q-Jack™ Model RJ-3 3-point stabilization package system which includes: Qty. of (1) Jack Stand Kit with pins,
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 Presented by the St Paul Sail and Power Squadron.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Proof Coil Chain A welded link chain. Chain size is designated by the diameter of the steel used in making the links (e.g.. 3/16"-3/4"). Made from low.
MultiRail Horizontal Anchorage Device
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Hydraulic Log Splitter ET 493- Senior Design One Jordan Millet Ridge Bourgeois Marcus Millet Advisor: Dr. Junkun Ma Teacher: Dr. Cris Koutsourgeras.
Final Presentation Crew: Mike Lanteigne Wallace Barkhouse Scott Donahoe Blair MacKay Captain: Dr. Jimmy Chuang April 4 th 2012.
© 2012 Delmar, Cengage Learning General Shop Equipment Chapter 9.
Team MacGyver: Inspiration Dan, Jason L, Jason W, Sarah Back to the Future 2™: HoverboardTeanage Mutant Ninja Turtles™: Sewer Surfer.
Guardhouses and Security Booths
Manual Transmission Components and Operation
Modern Automotive Technology PowerPoint for by Russell Krick
Suspension System Fundamentals.
A PRESENTATION on “ SUSPENSION SYSTEM ”
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
Sustainable (Backpack) NIMS Interns: Dor Yisrael Ashur (UCSD) Aerospace Engineer Olmo Fabian Maldonado Gomez (UTSA) Electrical Engineer Week 5: WPM, Overview,
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Team Rock On Final Presentation ME 4182 Submitted 7/25/06 Yuki Miyasaka, Anthony Palladino, David Price, Whitney Price, Ricky Sandhu.
Design a forward-moving, back- ward moving, steerable, hand operated, electrically- controlled vehicle with materials available to you. Introduction Brief.
What do I have to do? Cause a motor to turn the center arm. attach motor to frame can redesign the center arm piece as needed use bushings or bearings.
Sophisticated Design Automatic Tailgate Final Presentation December 5, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon Ramey.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Chapter 22 Turning and Boring Processes (Review) EIN 3390 Manufacturing Processes Spring, 2011.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
© Goodheart-Willcox Co., Inc. Wheels and Tires Unit.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
GSE Towing and Recovery Vehicle Operations
Chapter 6: Hydraulic Cylinders and Cylinder Cushioning
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Nathaniel Watts, Justin Kibler, Angel Hambrecht, Maxine Laroche
Suspension Systems - 1 Topics covered in this presentation:
Light Microscope: Parts and Function
Hire Different Varieties of Lifting Gear in UK
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
SuperQuest Salem Arms – Best Practices.
Stringing your car to determine wheel alignment is decidedly old school, but it's also effective, efficient and cheap. Begin by placing your car in a level.
Escalator Installation
HYDRAULICS & PNEUMATICS
MACH 118: Lathe & Mill 1 Lathe Workholding.
Protective Crane Design
OBJECTIVES Discuss the advantages and disadvantages of drum brakes.
Rollabuggy Introduction Brief
Suspension System Introduction:
Seminar On Air Suspension
SAE Baja Frame Design Brandt Lamonte, Luke Blocker, Alexandria Williams, Kyle Richert Advisor: Ho-Hoon Lee.
Parts & Accessories.
SLAC RC Status Report US LHC Accelerator Research Program
Parts & Accessories.
Proof Coil Chain Rope and Chain-Chains, Lashing Straps, and Accessories Image: ChainProofCoil.jpg Height: 46.2 Width: 120 A welded link chain. Chain.
F&T Inc. OVERHEAD CRANE SAFETY.
Welding Jig Redesign CATIA Project
Pre – Trip Inspection Training
Lifting With Your SPYDERCRANE KBT 5.4
Protective Crane Design
Understanding Variable-Geometry Outriggers
Clamping and Boring Tools
P18250 ‘Smart Buoy’ Phase 7 Customer Update
Suspension Systems - 1 Topics covered in this presentation:
Suspension Systems - 2 Topics covered in this presentation:
Presentation transcript:

Protective Crane Design ET 493- Senior Design Fall 2016 Alexandria Williams Katelyn Cockrell Curtis Blank Jared Bush Zane Jacob Alex

Design Goal The purpose of our project is to design and fabricate a protective crane to be used for protection against falls and general purpose tasks. The crane needs to be fairly mobile for different terrains and to allow the user to move freely. The crane will need to be moved with ease and it will also have to allow extended movement while being used. Alex

Our Goals Use skills learned through this project to become a valuable asset to companies we work for in our future. Gain a full understanding of the crane design, planning, and the estimated cost of the fabrication of the crane. Design the crane with safety and cost in mind. Alex

Setup We will be using 3”x2”x1/4” steel tubing for the frame. Curtis The size of the trailer will be approximately 6’-8” by 10’.

Setup Curtis

Components There will be two six-foot tubing sections running across the middle of the trailer, three feet away from each other and intersecting with the two ten feet tubing sections running down the middle of the trailer. There will be eight jacks, two jacks mounted on each corner of the trailer, with tubing that slides out of the main frame. This will allow the jacks to extend out creating a larger workplace and more sturdy base. We will need a trailer axle with leaf spring mounts. We decided on a 1000 lb. axle since it will just have to support the weight of the crane and not any loads because the jacks will be handling that. Jared

Components cont. The trailer will have lights for towing which will require an electrical hookup to a vehicle. We will drill two holes in both the frame tubing and the tubing that slides in and out that the jacks will be attached to. The holes will be for when the smaller tubing is extended; you can insert two locking pins in the two holes. We decided to use two holes to reduce the amount of bending in the smaller tube. Also, one hole will be drilled through both pieces of tubing so that when it is retracted a pin can be inserted to prevent the smaller tubing from sliding out while towing. Jared

Setup The crane will be used as a relatively popular jib crane design. Zane The crane will include an electric winch, which will be powered by a set of batteries mounted to the trailer.

Components The electric winch will include a drum that has been redesigned to hold a polyester strap. The boom and pillar of the crane will be constructed of hollow cylindrical tubing and be extendable. The pillar will also have a pivoting base, to allow the user to turn the boom while in operation. The pivoting base will require some sort of bearing system, quite possibly ball bearings. In addition, the pillar will require a locking system to keep the boom from swinging while in use. The boom of the crane will be mounted to the pillar using adjustable brackets. Zane

Components cont. The pillar will be mounted to a track that will run in the middle of the trailer. At in the end of the boom, a smooth finished leader will be mounted to allow the strap to flow smoothly and keep it aligned with the boom itself. The leader will have to be designed from scratch, since nothing like it is available on the market today. Stainless steel will more than likely be used to construct it. Like the pivoting base, the leader will also require a bearing system. This will reduce friction and allow the leader to last longer and run smoother. Zane

Setup

Problem Constraints Finding an adequate way to adjust the stability jacks while they are under the truck. This may be solved by using jacks that can be adjusted from a distance. Finding an adequate way to adjust the height of the boom. This may be solved by possibly adding an internal hoist system. Finding an adequate way to adjust the angle of the boom, while it is in the air. This may be solved by adding a turnbuckle that connects the pillar to the boom. Katelyn

Responsibilities Curtis will be in charge of designing the frame of the trailer, which will also consist of the welding and structuring. Jared will be in charge of designing the axle of the trailer, designing/mounting of the extendable stability jacks, and the wiring for the lights on the trailer. Zane will design the drum and leader to accommodate the polyester strap. He will also design the bearing system for the pivoting base and the adjustable brackets that connect the pillar and boom. Katelyn

Responsibilities cont. Katelyn will be in charge of designing the extendable pillar and boom of the crane, while also designing the locking system for the pillar. She will also be responsible for figuring out a way to adjusting the height of the boom. Alexandria will be responsible for coming up with an adequate power supply and wiring for the winch, while also designing a track system for the pillar of the crane. Katelyn

Timeline September 18 – 30: Meet with advisor to get project approval October 1 -15: Created proposal/presentation Rough design of crane/trailer October 16- 30: Get estimates for materials Begin designing major components of crane/trailer October 31- November 14: Finish designing major components of Crane/trailer November 15 – 30: Start re-configuration of drum and design of Leader/sheave Create final proposal/presentation Jared

Questions? Alex