Responsive and Adoptive Shelter for Earthquake Affected Communities – RASEAC e'sDk lkl8t ;d'bfosf] nflu pTt/bfoL tyf cg's'n cfjf; sfo{qmd Working.

Slides:



Advertisements
Similar presentations
Child Protection Units
Advertisements

How to Use the Bayanihang Eskwela Checklist G-Watch Ateneo School of Government joint government-citizen action for good governance.
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
 Low Cost Housing is a new concept which deals with effective budgeting and following of techniques which help in reducing the cost construction through.
Reconstruction of Earthquake Damaged Rural Houses (REDRH)
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
IOM Pakistan- One Room Shelter Program. The Program  The IOM ORS program is a shelter assistance program aimed at providing permanent shelter to the.
By Satish Girotra Implementation of school infrastructure.
Resiliency of Public Services in Social Sectors Kenichi Yokoyama, ADB Country Director, Nepal.
NOT FOR PUBLIC DISTRIBUTION HABITAT FOR HUMANITY’S Santo Development – Léogâne, Haiti.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
Participatory Audit and Planning (PAP) Process A tool for monitoring and ensuring “Decentralized planning’’ in utilization of Hospital Management Committee.
Civil Works, SSA, Assam Every School Beautiful Every Child In School Every Child Learning A xom Sarba Siksha Abhijan Mission.
Presented By: DUDBC Assessment Group.  To access the damage induced by the 2068/6/1 Taplejung Earthquake.  To evaluate the overall approximate cost.
Vanuatu Shelter Cluster meeting 18 th June 2015 PWD offices– Port Vila.
Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.
ALL4NEPAL – Update No4. So what can we do Global Partnership Making a Difference RT NEPAL.
NABUUR GAMAULI CONSTRUCTION OF TWO ROOMS’ BUILDING.
PRESENTATION ON CIVIL WORKS
Community and Health emergency Management Dr: Khawla Al-Hoti Family physician. Director of health services, Quriyat Willayt MRCGP,ARAB BOARD, Diploma in.
Shelter Cluster Vanuatu Meeting 16 July 2015 PWD Offices, Port-Vila.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
South Sudan Emergency Response 2014 Robust Shelter Construction.
Madhya Pradesh Chief Minister Rural Housing Mission.
Khulanathi “grow with us” Children’s home Khulanathi “ Grow with us”
Indira Awaas Yojana Ministry of Rural Development, Government of India.
UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.
AFFORDABLE HOUSING & MUCH MORE
Support the Earthquake Affected population to meet their relief and early recovery need in Rasuwa District Aug 2015 – Apr 2016 Funded By.
UNCLASSIFIED 1 TEMPEST EXPRESS 28 Government of Nepal Working Group Issues, Findings and Recommendations Report March 2016 Kathmandu, Nepal.
Jordan suggested list of occupations / Construction Sector As of a request from ETF, Jordan technical team has built the list of proposed occupations to.
Biosand Filter Start-up and Scale-up Household Water Treatment Planning Session, April 19, 2009 Ministry of Rural Rehabilitation and Development, Kabul,
Rural Access Programme Development through access (4C) Quality Management Plan Presentation for CPD Training Ramesh Khatakho Engineering Officer, Kalikot.
Introduction to Elevations
Construction Methodology for Suramadu Approach Bridge
PROJECT IMPLEMENTATION AND SUPERVISION. INTRODUCTION project planning usually seems to be a long process because implementation is the ultimate expectation.
The Mobilization Intervention Community Empowerment Methodology You can provide: inspiration, stimulation, information, encouragement; training; organizing.
Pradhan Mantri Awaas Yojana (Gramin)
Metal Work in Masonry Module
every one deserves a decent place to live.
1,000 Year Flood Lessons Learned After A State Disaster Norma J
Development Partners Roundtable
Reconstruction Skills Project
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Construction prodecure of Building
Module 4A - Introduction to Implementation
Wrong installation of window frame Wrong installation of window frame.
Manila Shelter Cluster Meeting 5pm - January 20th, 2014
NRA/HRRP GORKHA Coordination Meeting
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
BUILDING CONSTRUCTION 1
Progress Charts.
WELCOME.
Introduction to Elevations
DO’s and DON’Ts of toilet construction
Construction Management
Dry Stone Masonry Construction
CRVS Legal Framework Review Fiji Islands
Housing Recovery and Reconstruction Platform- Nepal (HRRP)-Rasuwa
Oman Experience on Telecommunications Emergency Plan
Standards-Based Reporting
Shelter Working Group Meeting Core / Transitional Shelter
Repair and reconstruction project (Technical support) Gatlang Rasuwa
4TH CAPITALIZATION MEETING 22 – 24 NOVEMBER 2016
DO’s and DON’Ts of toilet construction
Project Tracking Results
DO’s and DON’Ts of toilet construction
Portfolio Committee June 2009
EASTERN CAPE HOUSING DELIVERY
Hermenegildo Cardoso Rente Cruz Vermelha De Timor Leste (CVTL)
Presentation transcript:

Responsive and Adoptive Shelter for Earthquake Affected Communities – RASEAC e'sDk lkl8t ;d'bfosf] nflu pTt/bfoL tyf cg's'n cfjf; sfo{qmd Working VDCs- Yarsa & Ramche Supporting Organizations Disaster Emergency Committee Islamic Relief Worldwide The Lutheran World Federation Nepal Implementing Organization BATAS Foundation

Program Activities: WASH/DRR Livelihood Shelter

Program Activities 3. Shelter Training to Masons on Earthquake Resilient House Construction (2 events; 60 Beneficiaries; Ramche & Yarsa)- Completed Training on ICS for Smoke Free Houses (1 event; 40 Beneficiaries- Ramche) Completed Community Orientation and Awareness- On Progress

Awareness Raising to community Shelter…………….. Contd. Support for Construction of Earthquake Resilient Permanent Houses (Target 151 HHs) Awareness Raising to community Support to construct in any design of Buildings approved by DUDBC/GOs.) Technical & quality Construction Material support (equivalent to government support fund + Transportation) Tri-Parties Agreement for 151 Permanent Shelters Construction- Completed

Shelter…………….. Contd. Site Clearance: 18 E/W Excavation: 6 Construction activities started in 139 HHs Site Clearance: 18 E/W Excavation: 6 Vertical Rod Erection: 6 DPC Completed: 20 Sill Band Completed: 21 Stitch Band Completed: 16 Lintel Completed: 52 Toilet under construction: 20 HHs

Documentation Tri-Parties (Beneficiary, LWF Nepal & BATAS Foundation) Agreement. Beneficiary Card (Yellow Card) includes Beneficiary details & materials received by communities from Project Support. Monitoring Template for House & Toilet Construction- Stepwise Verification from BATAS Foundation Technical Team/ Cross-check/verification by LWF PM/Technical Team Daily Progress report/Measurement Book- BATAS Technical Official

Documentation……………. Contd. Daily Attendance Card for Labor involved in Shelter Construction Material Quality Report- MQR- Prepared by Technical Team after material inspection. Goods Receiving Note- GRN: According to MQR. Stock Book Entry- Daily Updated Stock Release/Chalan

Materials Support/Supply Bricks Sand Aggregate Reinforcement Bar Cement Truss CGI Sheet & Plain Sheet Shovel, Axe Peak, Layout Thread, Measuring Tape, Tagari, etc. Toilet Construction materials- equivalent to 10,000 And other Masonry equipments

Shelter Construction Support Modality Agreement: any DUDBC/GOs approved Models Clusters identification: 4 major working clusters identified. Working Committee: 1 (or more) formed in each Cluster. Material delivery: upto beneficiaries nearest road access Technical Support: Minimum one BATAS Technical official in each cluster at every crucial stage of shelter construction- facilitated by one SM.

Shelter Construction Support Modality…………………contd. Skilled Mason: minimum 2 Trained/skilled mason present in each HHs during shelter construction Earthquake Resilient Verification: Stage-wise verification of Shelter Construction (Foundation, Plinth Band, Sill Band, Stitching Band, Lintel Band, etc.) by TO Field Level Monitoring: frequently by BATAS FC and LWF PM/Engineer- jointly/individually. Joint/official monitoring from district/center. Provision of Complain Box at Office premises.

Community participation in site clearance During Site Clearance (Dismantling existing Old House)

70 Years old Couples actively involved in site clearance (Earthquake damaged building)

Vertical Rod Erection in Foundation

Bar Bending Work at Plinth Level

Casting of Plinth Band (DPC)

Compacting & Stone Soling in Floor

Plain Cement Concrete Work at Floor Level

Skilled Mason Ensuring Constructed Wall by Plumbob

Sill Band

Laying of Window

The House Reached At Stitch Band Stage At Stitch Band Stage Monitored By NRA Chief of Rasuwa District

Formwork For lintel Band Formwork And shuttering Work for lintel Band

Houses ready for Roofing

Ready For Roofing After paster Houses With internal Plaster Competed Ready For Roofing After paster

Construction Materials

Joint monitoring visit from Government Stakeholders (CDO, LDO, DSP, Program Officer, Monitoring Officer, VDC Secreteriat, etc.)

Inspection of construction material quality and quantity by BATAS Foundation Technical Officials

Shelter…………….. Contd. Challenges : Access of Road (Earthen, Heavy Boulders throughout alignment) Geology and Topography of Land (Difficulty on site clearance & Earthwork excavation) Scarcity of Skilled/Unskilled Labor

Thanks