API Mixing Energy Proposal

Slides:



Advertisements
Similar presentations
MOLES! MOLES! MOLES! Joe’s 2 nd Rule of Chemistry.
Advertisements

Objectives Be able to use basic volume weight equations
WG on Determination of Fluid Loss Screen Life API SC 10 Scott Jennings 25 June, Exploration and Production Standards Conference on Oilfield Equipment.
Page 1 API SC 10 Denver, June 2012 – Composite Cement Testing | H. Plack | May 2012 Composite Cement Testing Dyckerhoff Germany Denver, June 2012, Heiko.
> delete the picture and insert your chosen picture using the “insert/image/from file…” menu. Once the image is inserted, resize and “Send to back” using.
Density describes the amount of mass in a given
The Feasibility, Constructability, and Efficacy of Tire-Derived Aggregate as a Component in Slurry Cutoff Walls.
Tests & Results In ZIMS. Request Test From Record There are two ways to request tests on your samples. The first is from within the animal medical.
HIV Drug Resistance Training
API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler Engineering with Terry Dammel & Joe Day, Schlumberger.
 Calculate the acceleration that this object experiences 30 kg 150 N.
Clinical Laboratory equipment. Clinical laboratory is equipped with various biomedical instruments, equipments, materials and reagents for performing.
Reference system and centralised calibration for milk (payment) testing Dave Barbano Cornell University Ithaca, NY.
Lihdat  Manual for Lihdat (single sample processing)
ZARS Project Terry Ring
Cat # SL Store at 4 0 C PolyJet In Vitro DNA Transfection Reagent A Protocol for Transfections of Mammalian Cell 100 l 500 l 1000 l
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background.
Changes of State. Heati ng and Cooling Constant Power Heating with constant power. TempTemp time Cooling with constant power. TempTemp time.
Civil Engineering Department College of Engineering Course: Soil and Rock Mechanics (CE 260) Lecturer: Dr. Frederick Owusu-Nimo.
B2.23 Example data © Pearson Education Ltd Copying permitted for purchasing institution only. This material is not copyright free. This document.
API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler with Terry Dammel & Joe Day, Schlumberger.
Goal Setting. Goals Something that you want and are willing to work for. Something that you want and are willing to work for. Why set goals? Why set goals?
 Heat travels from hot to cold  The bigger the temperature difference the faster the rate of transfer.
“Water Discharge Using Salt Tracer and Area-Velocity” Catherine Riihimaki, Drew University
Cat # SL Store at 4 0 C GenJet In Vitro DNA Transfection Reagent A Protocol for Transfections of Mammalian Cell 100 l 500 l 1000 l
Marshall & Superpave Mix Design
CS 330 – Software Engineering What is Software Engineering? Lab 1.
WG on Composite Cements: Composite cement Annex for API Spec 10A - Final Amendments Austin, January 2016, Heiko Plack.
Introduction Old asphalt pavements Increase demand in landfill areas and landfill costs Landfill areas.
PUMPS Thermal Systems Laboratory Samuel A. Santiago Pérez Modesto González David Alvarado.
Tests & Results.
Laboratory 1: Software for Engineers
WG on HTHP Rheology Winter 2016, austin, tx
EXPERIMENT DESIGN.
Concrete Mix Design Calculations
Creating a Technique Chart
Chapter V Primary Cementing.
IEEES7 - Control of cement slurry formulation for oil well in critical geological layer 1* S. Bechar,
Food Sampling & Preparation of Sample Homogenate
API SC 10, Work Group 3 Update:
BTEC Applied science The applied science btec qualification is an excellent choice for those who need 2 science qualifications without the exam stress.
Water - Cement Ratio.
2017 Exploration & Production Winter Standards Meeting
Concrete Mix Design Calculations
Mammalian Cell l 500 l l Gaither Drive Gaithersburg, MD 20877
Concrete Mix Design Calculations
Bearing Capacity of soil (Comparison between Field and Lab Tests)
Conservation of Mass Problem
Estimating the number of Broodfish and Spawning
Warm Up: Dissolving.
YOGURT MAKING ILLUSTRATED
Performance Portfolio
Concrete Mix Design Calculations
Chemistry – Sept 28, 2017 Do Now – Get out your prelab flowchart and procedure for homework check and collect the first materials you will need for your.
CONCRETE MIX DESIGN PRACTICE OF ETHIOPIA AND ITS APPLICATION ON CONSTRUCTION SITES Presented by: Adiamseged Eyassu WORKSHOP ON CONCRETE CONSTRUCTION PRACTICES.
Chemistry – Sept 28, 2018 Do Now – List three physical properties of an apple and one chemical property. Get out the PP/CP and PC/CC Worksheet for Hmk.
<<< How To Use > > >
Instructions for Density Lab
Jonathan is a newly recruited lab technician at a school laboratory.
Agenda: August 23, Department Policy/Classroom Expectations 2
Refreshing oData in Excel
Tuesday, August 26, 2014: Get out homework, for self check.
Chemistry – Sept 25, 2017 Do Now – Get out your prelab flowchart and procedure for homework check and collect the first materials you will need for your.
Hemin J Majeed MSc. Pharmaceutical sciences
Introduction To Medical Technology
Maximum Size of Aggregate
API SC 10 Cooperative Testing Program 2018 Dyckerhoff Class G sample preparation and distribution API Summer Conference June 12th,
THE DETERMINATION OF WATER IN A COMPOUND
Alternative Mixing Procedure
Presentation transcript:

API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler Engineering with Terry Dammel & Joe Day, Schlumberger Work by Terry Dammel, Schlumberger TDammel@slb.com and Joe Day, Schlumberger JDay@slb.com

Project Goals Assign a Mixing Energy to each Cement Slurry Step 1 - Laboratory testing with a Lab Blender Time to reach a vortex at 4000 rpm Calculate a Mixing Energy value Step 2 – Field Mixing Equipment Determine the Mixing Energy of your Field Equipment Calculate the time needed to Mix the Cement Slurry This is presentation covers Step 1. Step 2 is a future study.

Parameters Standard API Lab Blender Exception to Standard API Mix Alter 15 seconds at 4000 rpm Time mix at 4000 rpm until a stable vortex is reached. Once a vortex is reached mix at 12,000 rpm for 35 seconds. Calculate Mixing Energy The energy needed to hydrate a slurry API mixing procedure is 15 seconds at 4000 rpm, followed by 35 seconds at 12,000 rpm. Cement blend should be homogenous particles should be well distributed.

Mixing Energy Calculations for the Lab Blender Standard mixing energy for a laboratory blender. Excel file available for calculations.

API Specification 10A Standard API mixing values. Taken from API Specification 10A, Twenty-Fourth Edition, December 2010, June 1, 2011.

Mixing Energy Video Standard API mixing values. Taken from API Specification 10A, Twenty-Fourth Edition, December 2010, June 1, 2011.

Mixing Energy Values Results from various classifications of A, C, G, H. The mix water is brought to 4000 rpm and then the timer started when cement powder is added to the mix water. Timing until a stable vortex is reached. This time is used to calculate the Mixing Energy to Vortex. The energy needed to hydrate the cement. Kilojoules per Kilograms API systems should take less than 4000 rpm to reach a vortex, if so we continue mixing for the 15 seconds and then increase the rpm to 12,000 for 35 seconds. This will result in a Total Mixing Energy of 5.9 kJ/kg. If it takes longer to reach a vortex, then once the vortex is reached the rpm is increased to 12,000 for 35 seconds. This results in an energy greater than API mix of 5.9 kJ/kg. NOTE: Density check with an unpressurized mud balance was as follows: A = 15.4 ppg C = 14.3 ppg G = 15.7 ppg H = 16.4 ppg

Mixing Energy Values Samples H (1-1) indicates Manufacturer 1 from bucket 1. The first two are taken from the same bucket. Sample H (1-2) indicates Manufacturer 1 from bucket 2 same lot, delivered months later. Sample H2 indicates Manufacturer 2. Sample H3 indicates Manufacturer 3. Questions: Why is more energy needed to mix sample H (1-1)? Why do the samples from same lot different buckets different? NOTE: All samples weighted 16.4 pounds per gallon on an unpressurized mud balance.

Questions Why does this brand of Class H cement require a high mixing energy? Why the difference between two buckets of the same lot? Will it be able to be mixed in the field? Will it be able to be pumped on the fly? Future Questions: Can sample H (1-1) be mixed in the field? Will the mixing energy be enough to mix it on the fly? Step 2 is to calculate the energy of your field mixing equipment, then determine how much time is needed to mix the slurry using the Laboratory calculated Mixing Energy. If too much time is required, than there could be problems mixing and pumping the slurry on the fly.

Questions for API How do we know if a cement slurry can be mixed? Can this procedure be adapted as a part of API testing? Should 15 seconds at 4000 rpm be applied once a vortex is achieved? Does documentation in the API determine if a cement slurry can be mixed? Are you applying mixing energy when the slurry is not hydrated? Most API slurries should mix in less than 15 seconds. This will be a quick quality control check on the cement replacing the initial mix rheology which are not recommended by the API. Slurries with aggregates and additives will usually be more viscous. This will provide a heads up on potential field problems.