GSICS Review Summary Manik Bali.

Slides:



Advertisements
Similar presentations
How to Document A Business Management System
Advertisements

Documenting GSICS as an element of the WMO Integrated Global Observing System 16th GSICS Executive Panel, Boulder, May 2015 Item 6 Jérôme Lafeuille.
Purpose of the Standards
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
GSICS Data and Products Servers Volker Gärtner (EUMETSAT) For GSICS Data Working Group.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO A WMO perspective on GSICS Joint Meeting of the.
GSICS GDWG Report, Toulouse, 9 February GSICS Data Working Group Status Report V. Gaertner CMA, EUMETSAT, JMA, KMA, NOAA/NESDIS, WMO.
16-20 March, GSICS Coordination Centre (GCC) Report Larry Flynn and Manik Bali 2015 GSICS Annual Meeting New Delhi, India March 16-20,
June, GSICS USER GUIDE Using GSICS Products and Services Manik Bali, Tim Hewison, Larry Flynn and Jerome Lafeuille 2016 GSICS Executive Panel Meeting.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Documenting GSICS as an element of the WMO Integrated.
GSICS Procedure for Product Acceptance (GPPA) WorkFlow GCC Presented by Fangfang Yu 12/03/
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
Review of Methodology in Algorithm Theoretical Basis Document: MSU/AMSU Radiance FCDR Derived From Integrated Microwave Inter- Calibration Approach Chabitha.
Highlights (Actions) of GSICS Exec Panel 30 October 2009 Volker Gärtner.
WMO GSICS Web-Site Discussion 2016 GSICS Joint Meeting on Research and Data Working Groups Tsukuba, Japan 29 February to 4 March 2016.
Marianne König, Tim Hewison, Peter Miu
GSICS Procedure for Product Acceptance Update
Principal Investigator ESTCP Selection Meeting
Comments on Template & Document Management System for GSICS
GSICS Reference Documents
GSICS MW products and a path forward.?
Jerome Lafeuille WMO Space Programme Office
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
Planned Activities of GSICS Microwave sub-group
GSICS Coordination Center (GCC) Report
Report to 8th GSICS Exec Panel
In-orbit Microwave Reference Records
SAMPLE Develop a Comprehensive Competency Framework
Principal Investigator ESTCP Selection Meeting
GSICS Quarterly Special Issues and Editors
GDWG Agenda Item Repository for GSICS Work - Clarification on Archiving Masaya Takahashi, JMA CMA, CNES, EUMETSAT, ISRO, IMD, JAXA, JMA, KMA, NASA, NIST,
Larry Flynn and Manik Bali 2016 GSICS Executive Panel Meeting
Microwave Sub-Group Updates
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
GSICS Data Management and Availability to Users
Improvement Suggestions to the Procedure for Product Acceptance
Actions and Recommendations of the Joint Session
Review of MSU/AMSU Re-Calibration Product
Larry Flynn and Manik Bali
Document Management System
Manik Bali, Larry Flynn NOAA/STAR
The GSICS Procedure for Product Acceptance ( GPPA )- New Challenges
GSICS Data Management and Availability to Users
GSICS Product Submission & Promotion Documents 8.1 and 8.2
Dr Sue Barrell, Australia
Update on the GSICS Procedure for Product Acceptance (GPPA)
2b. GSICS Coordination Centre (GCC)
GSICS MW products and a path forward.?
GSICS Coordination Center GSICS EP- Debrief
Xiangqian WU and Fangfang YU with contributions from
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Technical aspects of the GIRO work: inputs from GRWG
Status of the EUMETSAT GSICS DCC product
The Importance of Project Communications Management
Where do we stand on GSICS MW products?
GSICS Coordination Center (GCC) Report
The GSICS Procedure for Product Acceptance ( GPPA )- Timeliness
Hot summary of the Fourth GSICS Users Workshop
GSICS Data Management Working Group Summary and Action Items
GSICS Coordination Centre (GCC) Report for
Welcome to the GSICS Users Workshop
10.j. Next GSICS Users Workshop & other Outreach
Concept paper on the assessment of WFD River Basin Management Plans
GSICS Coordination Center (GCC) Report
2s. Defining GSICS Products and Deliverables
GSICS Documentation Discussion - classification and storage
GSICS Newsletter Microwave mini issue
Presentation transcript:

GSICS Review Summary Manik Bali

Methodology in draft ATBD Review Criterion Methodology in draft ATBD Testing of the Potential GSICS Inter-Calibration Product

Methodology in draft ATBD Reviewers Viju Wenze Suleiman Thorson+Chedly Issaac Chabitha Tanvir Method Clarity Method Utility Method Reproducibility

Testing of the Potential GSICS Inter-Calibration Product Reviewers Viju Wenze Suleiman Thorson & Chedly Issaac Chabitha Tanvir Data Accessibility Availability Data Ease of Use Product Suitability Product Reliability

Individual comments Thorsen & Chedly = “I consider this the most advanced MSU/AMSU L1 dataset available for climate purposes. This is an important contribution and will be important in helping to understand discrepancies between current MSU/AMSU climate datasets. “ Viju = “This is a great work and serves as an example for climate data record development” Wenze =” The only concern is that the method is quite sensitive to the quality of the input data, so it is important to do some pre-screen before applying the method”. Suleiman =“I strongly believe that the method accomplished its purpose as the authors clearly showed.” Tanvir = “Overall, the product can be recommended for CDR users. The method is very effective, and suitable for climate study, especially for the purpose of maintaining a consistent climate data record.”

Four Product Phases Submission Phase Demonstration Phase Pre-operational Phase Operational Phase

GPPA: Submission Phase Phase Progress: GSICS Product Acceptance Form (GPAF) is satisfactory, Sample data files conform to GSICS file and parameter naming and format standards, Verified to be within GSICS scope, and Theoretical basis is understood at a high-level. Documents & Data to GCC: GPAF sections that detail product name, POC, brief description, and relevance to GSICS. Preliminary version of the product algorithm theoretical basis document (ATBD) Sample product files that adhere to GSICS file and parameter naming conventions Reviewers: GSICS Product Acceptance Team (GPAT) Maximum Time Period: 90 Days

GPPA: Demonstration Phase Phase progress: Founding concepts, supporting models and measurements and implementation are documented and fully understood Traceability to community reference standard is documented Quality Indicator is documented and well-defined Tested and reviewed by potential product users Data released to GSICS members and potential users.

Documents & Data to GCC: Routine product upload to a GSICS data server and agree on file retention policy. Baseline versions of four documents critical to product quality assurance Algorithm Theoretical Basis Document Document describing product traceability to standards Product supporting radioactive transfer model and cal/val supporting measurements description Product quality indicator description and justification q1`

GPPA: Pre-operational Phase Phase progress: Generation, distribution, version control and archive strategies are fully documented and implemented. Users’ Guide with clear implementation instructions made available to data users, Data released to public with disclaimer. Documents associated with product data stewardship in an operational environment to GCC: Product version control plan, Operations and distribution plan, and Data user's guide Reviewers: GPAT & GSICS Executive Panel (EP)

Final Comments and Recommendation to GCC Director GPPA recognizes that the AMSU/MSU product has fulfilled all the conditions for the demonstration Phase. GPPA recognizes the fact that the MSU/AMSU product is already distributed by NCDC in Near Real Time. NCDC Product Maturity Matrix was diligently followed by Cheng-Zhi to continue NRT production of product at NCDC. GPPA recognizes the fact that most of the conditions of the pre-operational phase have also been fulfilled . GPPA recommends to the Director GSICS Co-Ordination Center ( Larry Flynn) to accept the product in demonstration phase in the GSICS Catalogue and layout criterion to make it operational Upon receipt of a key user guide from Cheng-Zhi Zou.

Over To GCC Director Larry Flynn

GCC Director’s decision GCC Decision MW MSU/AMSU Product are accepted in GSICS in Demonstration Phase Would take a decision on going directly to Pre-Operational Phase after EP approval.

Certificates of Appreciation

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Dr. Chabitha Devaraj for her outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Dr. Tanvir Islam for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Dr. Wenze Yang for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Dr. Isaac Moradi for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Dr. Suleiman Alsweiss for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Dr. Viju John for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Mr. Stephen Po-Chedley for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

Certificate of Appreciation With the support of WMO and CGMS, we present this certificate to Mr. Tyler Thorsen for his outstanding contribution to the review of GSICS Microwave FCDR product. GSICS   recognizes the extensive effort involved in this review that was completed at no cost to GSICS Awarded: Dec 03, 2013 Certificate of Appreciation Dr. Lawrence E. Flynn Director GSICS Co-ordination Center Dr. Cheng-Zhi Zou Chair GSICS Microwave Sub-Group Dr. Mitch Goldberg Chair GSICS Executive Panel

THANKYOU